Current Projects in Ross Hall

ROSS H-0406-442000-Carpet-Paint-Whiteboards
PR1281982
Initiated date: 6/13/2025
Contact: Maricel V. Lloyd
Description:
We would like to have the carpet replaced, chalkboards removed and replaced with white boards and walls painted. We would also like estimates for 5 standing desks and 5 desk chairs.
ROSS H-General-447411-Stand-up Desks and Office Chairs
PR1284019
Initiated date: 6/23/2025
Contact: Maricel V. Lloyd
Description:
5 stand-up desks and 5 office chairs
ROSS H-0218-350788-Lunchroom Sign
PR1238656
Initiated date: 9/16/2025
Contact: Joseph Stoberl
Description:
Duane Strah stopped by today in reference to Request number 341913 which was for new signs needed for Ross 212. We talked with him about making a another new sign for what is going to be our new Lunchroom, 218 Ross. It will be exactly like the sign that hangs from the ceiling directing people to our mailroom, but it will say "Lunchroom", with arrows on each side pointing to the room. Duane suggested I put in this ticket.
ROSS H-0212-341913-Conference Room Signage
PR1233321
Initiated date: 9/16/2025
Contact: Joseph Stoberl
Description:
I was not sure if this would be considered a project? We need two new signs for each side of our Ross 212 Conference Room. The current signs are 14"L x 5"H. Black background with white lettering (I'll attach a photo to this request). They currently say: Department of English Faculty-Graduate Student Lounge & Reading Room We would like new signs (same size to avoid wall repair) that say: Department of English Conference Room