Current Projects in Scheman Building
SCHEMAN-M0020-293816-Water Pump Repair
Budget Approval
Room: M0020
Request date: 7/11/2023
Requested by:
Contact: Denise Wulf
Construction start: 5/20/2025
Construction end: 11/18/2025
Description:
Equipment room M020 heating water pump #12 is leaking. Repair\Replace. Confirm Scott Nibe. This has not been completed per Don Gregory - it is running on a drop cord. It has been turned in to have the electric updated and hooked to system controls.
This project was sent from FPM Building Maintenance - Scott Nibe did some pump installation work and the last he knew the project was on hold until an electrical and Metasys solution for controlling the pumps can be found. So far the trades involved include, Facilities Mechanic, Electrician, Controls, Insulation. Please turn into a small project.
SCHEMAN-M0020-435609-Replace Pressure Release Valve
Project Closeout
Room: M0020
Request date: 4/21/2025
Requested by:
Contact:
Construction start:
Construction end:
Description:
PRV failed . Need replacement of Pressure Release Valve. 12psi.
Will need Pressure gauge for both suction side.
Will need pressure gauge for discharge side.