Current Projects in State Gymnasium

ST GYM-0180A-403557-Convert or replace desktop
Project Closeout
Room: 0180A
Request date: 11/7/2024
Requested by:
Contact: Mitchell Hlavacek
Construction start: 12/4/2024
Construction end: 2/4/2025
Description:
State Gym office 0180B needs their desk top to converted or replaced with an elevating desk top.
ST GYM-0220AA-404955-CO2 Tank for Pool Filter Room
Schematic Design
Room: 0220AA
Request date: 11/21/2024
Requested by:
Contact: Mike McCoy
Construction start: 7/20/2025
Construction end: 1/18/2026
Description:
CO2 Tank. I would like to get an estimate for installing and permanent CO2 tank in the State Gym pool filter room like what is currently being used for Beyer Pool for the purpose of balancing water chemistry. Ideally the tank would go into 0220AA which formerly held acid barrels. Penetrations in the ceiling of 0220AA leading to the former fill port on the exterior west side of building still exist.
ST GYM-1180K-411326-office 1180K designed for a new desk system
Construction
Room: 1180K
Request date: 12/31/2024
Requested by:
Contact: Mitchell Hlavacek
Construction start: 2/21/2025
Construction end: 5/2/2025
Description:
Rec Services needs State Gym office 1180K designed for a new desk system. It would include an elevating desktop. We would like our staff person to meet and discuss options for their work space.
ST GYM-1200-429496-Andy Laughlin is familiar with this request. Rec Services needs to replace ligh
Room: 1200
Request date: 3/24/2025
Requested by:
Contact: Amy Tremain
Construction start:
Construction end:
Description:
Andy Laughlin is familiar with this request. Rec Services needs to replace lighting at State Gym entry way for the climbing wall and bouldering wall. This will replace old lighting system with new LED fixtures.
ST GYM-1200-429496-Replace Lighting
Construction Documents
Room: 1200
Request date: 3/24/2025
Requested by:
Contact: Amy Tremain
Construction start: 6/10/2025
Construction end: 12/9/2025
Description:
Andy Laughlin is familiar with this request. Rec Services needs to replace lighting at State Gym entry way for the climbing wall and bouldering wall. This will replace old lighting system with new LED fixtures.
ST GYM-1209-350864-Sprinkler System Repairs
Project Closeout
Room: 1209
Request date: 3/28/2024
Requested by:
Contact: Denise Wulf
Construction start: 7/17/2024
Construction end: 3/7/2025
Description:
Sprinkler System. Rooms: 1201 & 1209. Please get estimate for a dry control valve serving sprinkler heads in vestibules, room numbers: 1201 and 1209. Current sprinkler line is charged "wet "and is prone to freezing, vestibule heaters are undersized for amount of traffic. Need pricing for dry valve to mitigate frozen heads.
ST GYM-2129-403555-Purchase new desk
Project Closeout
Room: 2129
Request date: 11/7/2024
Requested by:
Contact: Mitchell Hlavacek
Construction start: 12/9/2024
Construction end: 2/4/2025
Description:
State Gym office 1180K we are relocating some desk pieces to another office area. I need to replace like for like in this office. Updating to room 2129.