STD HTH-1162-427953-Remodel Room to Office Space
Project Closeout
Room: 1162
Request date: 3/11/2025
Requested by:
Contact: Amy Tremain
Construction start: 3/28/2025
Construction end: 3/28/2025
Description:
Exam room is being turned into an office. We need assistance with several things: Removing items off the wall, patching holes and painting. Exam table can be moved to storage room 2215-3. Door knob needs to be switched to one that locks. Please check in at the front desk and see Sara Eisenmenger if you have questions. She has been working on getting the room ready. Thank you!
STD HTH-2210C-415274-Replacement Shelving
Construction
Room: 2210C
Request date: 1/10/2025
Requested by:
Contact: Amy Tremain
Construction start: 2/27/2025
Construction end: 5/1/2025
Description:
Good morning, I have a really simple request that shouldn't require a design or anything too complicated. I have Steelcase furniture in my office. I currently have 2 of the overhead bins, 30" wide. I'd like to replace these with 4 30" shelves instead. I checked with Surplus first and they do not have any. Could I get a cost estimate for the new shelving? Thank you!