Current Projects in Student Services Building
STD SER- General-252672-Move Pressure Reducing Valve
On Hold
Room: General
Request date: 1/18/2023
Requested by: John Netwal
Contact: Alexa Peters
Construction start: 2/27/2025
Construction end: 6/3/2025
Description:
Please put together a project to move the PRV in this building from its current location. It is currently in a crawlspace under the building where there is no floor (dirtmud only) making repairs, adjustments, etc. difficultdangerous. I will need a scope and cost for this project only.
STD SER-1032-420748-Standing Desk
Project Closeout
Room: 1032
Request date: 2/5/2025
Requested by: Christi Kampen
Contact: Mitchell Hlavacek
Construction start: 4/11/2025
Construction end: 6/25/2025
Description:
I need to order a standing desk for this office to meet an accommodation. I will be moving into this space in mid-April. I have worked with Don Kelling with EH&S for an ergonomic evaluation.
STD SER-2010-447286-Furniture Upgrades
Construction Documents
Room: 2010
Request date: 6/3/2025
Requested by: Ashley Zuercher
Contact: Carrie Choudhury
Construction start: 9/2/2025
Construction end: 3/3/2026
Description:
We are moving all of Student wellness over to the 2010 office area with all those offices in that hallway on the second floor of SSB. We are wanting to upgrade some of our furniture for this move. We have been working a bit with Tracy Borts from DSO who has just completed this process. The carpet/paint we've been told is very similar to the DSO redesign. Shes shared some of the furniture they've purchased, and we imagine we'd want a lot of the same. We already upgraded our office chairs back in April with Procurement.
STD SER-3rd Floor-362763-Flooring and Painting
On Hold
Room: General
Request date: 5/17/2024
Requested by: Marcie Cleland
Contact: Alexa Peters
Construction start: 9/2/2025
Construction end: 3/3/2026
Description:
Hello, I work at Student Counseling Services and we are wanting to get estimates done and figure out what the process would look like for us to complete the following projects.
1. Changing flooring throughout the entire 3rd floor of Student Services. We are wanting to know what the cost would be if we got carpet everywhere compared to the price of having certain areas tiled as well. We are wanting to match the style of the first floor of Student Services if possible.
2. Patching and painting the entire 3rd floor of Student Services.
STD SER-General-338221-Fire Escape Repairs
Bidding
Room: General
Request date: 1/30/2024
Requested by: John Netwal
Contact: Amy Tremain
Construction start: 7/5/2025
Construction end: 7/5/2025
Description:
Fire Escape Repairs - Fire Escape Inspection Report in the LX folder and G Drive folder.
Bricks appear to be coming loose below the third-floor landing where the fire escape attaches to the exterior of the building. Have the fire escape inspected by a registered design professional and place particular emphasis on this area. By section 1104.16.5.1 this should be repeated every 5 years.