Current Projects in Stephens Auditorium
STEPHEN- General-279324-Exterior Steps Repair
Cost Range Approval
Room: General
Request date: 5/2/2023
Requested by:
Contact: Alexa Peters
Construction start: 7/18/2025
Construction end: 1/16/2026
Description:
estimate to repairs exteriors steps on East side of Stephens North parking lot headed to Harvester Plaza
STEPHEN- General-304753-Stair Lighting
Construction Documents
Room: General
Request date: 8/28/2023
Requested by:
Contact: Troy Bowers
Construction start: 6/3/2025
Construction end: 12/2/2025
Description:
Investigate the cost of installing new stair lights at CY Stephens. This is a 50/50 cost share with FPM and Athletics.
STEPHEN-0001-381518-Install Coils on AHUs
Project Closeout
Room: 0001
Request date: 8/6/2024
Requested by:
Contact: Brady Streit
Construction start: 3/26/2025
Construction end: 4/4/2025
Description:
Install 4 coils (2 for each) AHU4 and AHU2. Coils have been patched to make it through cooling season but need replacement. New coils are being stored at the South Campus Storage Facility until needed. Coils were ordered by Eric Zierke on WO# 368679.
STEPHEN-0035-389032- Replace Glass and repair steel support on large window
Cost Range Approval
Room: 0035
Request date: 9/3/2024
Requested by:
Contact: Denise Wulf
Construction start: 10/14/2025
Construction end: 4/14/2026
Description:
Replace glass on the window on ground floor vestibule on the west side of the ticket office. Also repair steel support under the window as well.