CY_STAGELT-General-369558-Refinish Wood Banisters and Railings
On Hold
Room: General
Request date: 6/17/2024
Requested by: Miles Pankonen
Contact: Denise Wulf
Construction start: 7/24/2024
Construction end: 8/8/2024
Description:
The CY staff says the wood finish on almost all the banisters and railings is coming off. They're worried about people getting splinters and the wood getting ruined.
STEPHEN- General-279324-Exterior Steps Repair
Cost Range Approval
Room: General
Request date: 5/2/2023
Requested by: John Netwal
Contact: Alexa Peters
Construction start: 9/8/2025
Construction end: 3/9/2026
Description:
estimate to repairs exteriors steps on East side of Stephens North parking lot headed to Harvester Plaza
STEPHEN- General-304753-Stair Lighting
Construction Documents
Room: General
Request date: 8/28/2023
Requested by: Andrew Kautman
Contact: Troy Bowers
Construction start: 7/25/2025
Construction end: 1/23/2026
Description:
Investigate the cost of installing new stair lights at CY Stephens.
STEPHEN-0001-381518-Install Coils on AHUs
Project Closeout
Room: 0001
Request date: 8/6/2024
Requested by: Lyle Bishop
Contact: Brady Streit
Construction start: 3/26/2025
Construction end: 4/4/2025
Description:
Install 4 coils (2 for each) AHU4 and AHU2. Coils have been patched to make it through cooling season but need replacement. New coils are being stored at the South Campus Storage Facility until needed. Coils were ordered by Eric Zierke on WO# 368679.
STEPHEN-0035-389032- Replace Glass and repair steel support on large window
Cost Range Approval
Room: 0035
Request date: 9/3/2024
Requested by: James Bohl
Contact: Denise Wulf
Construction start: 12/5/2025
Construction end: 6/5/2026
Description:
Replace glass on the window on ground floor vestibule on the west side of the ticket office. Also repair steel support under the window as well.
STEPHEN-General-442225-Sidewalk and Stair Repairs
Schematic Design
Room: General
Request date: 5/16/2025
Requested by: Craig Wiebke
Contact: John Byerly
Construction start: 9/18/2025
Construction end: 3/19/2026
Description:
Repair or patch damaged concrete on sidewalk between SE tower entrance and stairs to street level. Repair or patch damaged sidewalk outside northeast corner of Stephens Auditorium. Repair and patch areas of spalling concrete on northwest stairs to north upper patio and numerous areas of concrete damage on north upper patio.