Current Projects in Sweeney Hall

SWEENEY- General-287742-Generator Study
Cost Range Approval
Room: General
Request date: 6/21/2023
Requested by:
Contact: Alexa Peters
Construction start: 7/10/2025
Construction end: 1/8/2026
Description:
Request 141566 from Nov 18, 2021 was marked as completed by the FPM team, but I don't recall receiving answers to all of our questions. In particular, 1) what is hooked to the generator 2) would it be possible to add other items to the generator, such as the walk in cooler in 2024 and the -80 freezer in 2058 3) what are the pros and cons of doing that. Original Request: Since the derecho we have had several questions about the Sweeney Hall generator(s) and would like someone to help us with our questions such as 1) do we have one or two generators for Sweeney (there is one north of the building and one on the roof of the new wing) 2) what is hooked to the generator 3) would it be possible to add other items to the generator, such as the walk in cooler in 2024 and the -80 freezer in 2058 4) what are the pros and cons to doing that. Type Electrical | Generators Assigned To Todd Kelley Closing Comments closing out old work orders, if have questions contact Service Center Status has been changed to Closed. Sending Request to FDC from FPM Building Maintenance - We would like an electrical engineer to determine if this work is possible.
SWEENEY-2114A-417682-update the Department Chair office
Construction
Room: 2114A
Request date: 1/29/2025
Requested by:
Contact: Mitchell Hlavacek
Construction start: 3/19/2025
Construction end: 9/17/2025
Description:
We would like to update the Department Chair office with the following: remove current furniture and replace with: new sit/stand desk, round table, side chairs, bookcase with drawers. The shelves on the wall need to be removed to install a monitor/screen on the wall. Holes in the wall will need to be filled and probably painted. Please advise of the next steps. Thank you!
SWEENEY-General-336665-PRV Study
Construction Documents
Room: General
Request date: 1/22/2024
Requested by:
Contact: Mike McCoy
Construction start: 5/25/2025
Construction end: 11/23/2025
Description:
We would like to have the Engineering Team review the recent PRV installation for code compliance and safety in the mechanical room and develop a detailed plan to correct any deficiencies found that could be either be shared with a contractor or in-house staff. An engineering probable cost estimate would be appreciated.