Current Projects in Town Engineering Building

Town - Rm 0387 - 398897 - Provide 3 Independent Circuits and Temperature Control
Construction
Room: General
Request date: 10/30/2024
Requested by: Nancy Qvale
Contact: Mitchell Hlavacek
Construction start: 5/23/2025
Construction end: 11/21/2025
Description:
Provide a cost range estimate to provide the following features in room 0387. Provide a separate estimate for each room as we use the estimates to select the best path forward. --Provide 3 independent, isolated circuits, such that 3 computers could be hosted on each circuit --Provide temperature control. The room will need to be able to be cooled, as the computers will generate heat.
TOWN-0034-441150-Replace and improve lighting
Construction Documents
Room: 0034
Request date: 5/5/2025
Requested by: Nancy Qvale
Contact: Steve Larson
Construction start: 7/25/2025
Construction end: 1/23/2026
Description:
Replace and improve the lighting in Town 34. LED fixtures are preferred. Include estimates for Town 0040 and 0042 as well. Please provide an estimate for each room, so we can make the decision by room. Thank you.
TOWN-0106-443993-Remodel
Construction Documents
Room: 0106
Request date: 5/30/2025
Requested by: Nancy Qvale
Contact: Steven Daniels
Construction start: 8/11/2025
Construction end: 2/9/2026
Description:
Remove attached cabinets in southwest corner of room. Leave the moveable cabinet. Patch and paint wall if necessary. Replace white boards with boards that extend from the hallway window to the column (on the west wall). Want double stacked, magnetic boards. May need to purchase tall tables and stools, dependent upon the resolution of the warranty claim submitted for the excessive number of damaged chairs. Fix the light fixtures that are not working, as submitted on request 430741.
TOWN-0106-443994-Add Window
Cost Range Approval
Room: 0106
Request date: 5/30/2025
Requested by: Nancy Qvale
Contact: Alexa Peters
Construction start: 9/8/2025
Construction end: 3/9/2026
Description:
Provide design and cost to cut and install at least one exterior window on either the north or east side of the room.
TOWN-0134-382561-Repurpose Office Space
Project Closeout
Room: 0134
Request date: 8/9/2024
Requested by: Nancy Qvale
Contact: Mitchell Hlavacek
Construction start: 10/16/2025
Construction end: 5/15/2026
Description:
Repurpose Town 134 into graduate student office space.
TOWN-0220-416686-Purchase 8 additional chairs
Project Closeout
Room: 0220
Request date: 1/27/2025
Requested by: Nancy Qvale
Contact: Mitchell Hlavacek
Construction start: 2/4/2025
Construction end: 4/23/2025
Description:
Purchase 8 additional chairs for Town 220. Current chairs were purchased on PR1229914. These 8 should be the same chair so they match. I don''t need design; just 8 additional chairs. We only ordered 32 and need 40.
TOWN-0322-435502-Replace whiteboards
Construction
Room: 0322
Request date: 4/21/2025
Requested by: Nancy Qvale
Contact: Mitchell Hlavacek
Construction start: 5/23/2025
Construction end: 11/21/2025
Description:
Replace whiteboards in Town 322 with Deco boards similar to what is in Town 220 and 230. Be sure that when installed, they are secure to the wall and don't flex.
TOWN-0402-443620-Replace carpet and furniture
Construction Documents
Room: 0402
Request date: 5/27/2025
Requested by: Nancy Qvale
Contact: Carrie Choudhury
Construction start: 8/11/2025
Construction end: 2/9/2026
Description:
Replace carpet and furniture in faculty member office, Town 0402. The faculty member is Cristina Poleacovschi. Please contact her for details, poleacov@iastate.edu, or 294-2845. Worktag provide, SG0518112, should ONLY be used for the design and estimate. Once Dr. Poleacovschi approves the budget, an alternate Worktag will be provided.
TOWN-General-336671-Heat Exchanger Study
On Hold
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Alexa Peters
Construction start: 8/11/2025
Construction end: 2/9/2026
Description:
We would like to have the Engineering Team review the recently replaced Heat Exchanger for code compliance and safety in the mechanical room and develop a detailed plan to correct any deficiencies found that could be shared with either a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
TOWN-General-355438-Exterior Building Signs
Project Closeout
Room: General
Request date: 4/10/2024
Requested by: Nancy Qvale
Contact: Joseph Stoberl
Construction start:
Construction end:
Description:
ATTN: Joe Stoberl Relocate Town Engineering Building sign on east side of building to the south, just south of the bike racks, between the two trees near the diagonal walk. Install a second Town Engineering Building sign on the north side of the building. Project and both locations have been discussed with Joe. TOWN Additional location information: North and east side of building; exterior Work tags to attach: PG101370
TOWN-Room C0124-335115-Furniture Replacement
Project Closeout
Room: C0124
Request date: 1/8/2024
Requested by: Nancy Qvale
Contact: Mitchell Hlavacek
Construction start: 7/9/2024
Construction end: 5/7/2025
Description:
Replace furniture in the north-south hallway on the west side of the building: Please proceed with planning and a detailed estimate.