WO # Requested by Description Status
1331 Siti Sabtu-Schaper BDSHR, RMS 1550L AND 2510 - TECHNOLOGY & FURNITURE COST RANGE WILL BE PROVIDED UPDATE TECHNOLOGY AND FURNITURE FOR 1550 CONFERENCE ROOM AND 2510 CONFERENCE ROOM TO BE ABLE TO ACCOMMODATE VIRTUAL MEETINGS AND HYBRID MEETINGS. WORKING WITH ITS TO UPGRADE TECHNOLOGY NEED AND WILL NEED TO COORDINATE ELECTRICAL/STRUCTURAL WORK LATER ON. ADDITIONALLY, WOULD LIKE TO RECONFIGURE 1550 CONFERENCE ROOM IF POSSIBLE (REMOVE SINK AREA AND SHIFT THE EXIT DOOR TO WHERE THE SINK IS TO GAIN WALL SPACE FOR FLAT TV). WOULD ALSO LIKE TO REPLACE FURNITURE IN 1550 CONFERENCE ROOM AND SOME IN 2510 CONFERENCE ROOM. LOCATION: 1550 CONFERENCE ROOM AND 2510 CONFERENCE ROOM DESIRED COMPLETION DATE: KNOWN TIME CONSTRAINTS: THE PLAN IS FOR ALL STAFF TO RETURN TO CAMPUS BY AUGUST. WOULD LIKE THE PROJECT TO BE DONE BY THEN IF POSSIBLE AS WE NEED TO BE ABLE TO ACCOMMODATE BOTH VIRTUAL AND IN-PERSON MEETING AND HYBRID MEETINGS. DESIRED PROJECT COST: FUNDING CONTACT: SABTU-SCHAPER, SITI M Open
1407 Kenneth Thelen WJ38529 DESIGN - ELEC ENG - KT - BDSHR 1550 Open
1657 Steven Daniels WJ42500 DESIGN - ARCH - SD - RMS 1550L & 2510 - REMODEL Open
1778 Andrew Mott BDSHR, ESTIMATE TO REPAIR PILLARS THRU OUT BEARDSHEAR REQUESTING AN ESTIMATE FOR REPAIR OF PILLARS DO NOT EXCEED $5000.00 PILLAR DAMAGE GROUND FLOOR PILLAR BY OFFICE 0460 - 1ST FLOOR SOUTH/EAST PILLAR BETWEEN EAST ENTRYWAY (1100) AND CENTRAL LOBBY (1900) 2ND FLOOR PILLAR BY OFFICE 2680 PILLAR BY OFFICE 2810 Open
1798 Steven Daniels WJ21708 EST - ARCH - SD - REPAIR COLUMNS Open
1895 Lisa Ristvedt Beardshear Hall-Chilled Water Line Replacement-Phase 2 Open
2247 Donna Imhoff Design - Mech Engr - DI - Bdshr 1550/2510 Open
2313 Patricia Kendall BDSHR, ROOM 570 - CUBICAL WALL MODIFICATIONS COST RANGE WILL BE PROVIDED I WOULD LIKE TO HAVE SOME CUBICAL WALLS SWITCHED OUT FROM 65" HEIGHT TO 42" HEIGHT IN 0570 BEARDSHEAR. WE CURRENTLY HAVE THE NEEDED COMPONENTS IN STORAGE. WE WOULD THEN LIKE THE 65" HEIGHT WALLS INSTALLED IN 0680 BEARDSHEAR. LOCATION: I WOULD LIKE TO HAVE SOME CUBICAL WALLS SWITCHED OUT FROM 65" HEIGHT TO 42" HEIGHT IN 0570 BEARDSHEAR. WE CURRENTLY HAVE THE NEEDED COMPONENTS IN STORAGE. WE WOULD THEN LIKE THE 65" HEIGHT WALLS INSTALLED IN 0680 BEARDSHEAR. DESIRED COMPLETION DATE: DESIRED PROJECT COST: FUNDING CONTACT: KENDALL, PATTI M Open
5592 Kendrick Fox WJ34887_ PR024190 - CM - NCO - RF - RMS 1550 & 2510 Open
7146 Kendrick Fox WJ21162_ PR024018 - CM - NCO - RF - REPAIR PILLARS Open
16346 Judy Dugan WJ38530 - DESIGN - INT DES - JD - RMS 1550L AND 2510 - FURNITURE Open
16447 Kendrick Fox WJ43873_ PR024317 - CM - NCO - RF - RM 570 CUBICAL WALL MODIFICATIONS Open