Work Orders in Beardshear Hall
Showing all active work orders and all inactive work orders closed in the past 30 days.
WO # | Requested by | Description | Status |
---|---|---|---|
1331 | Siti Sabtu-Schaper | BDSHR, RMS 1550L AND 2510 - TECHNOLOGY & FURNITURE COST RANGE WILL BE PROVIDED UPDATE TECHNOLOGY AND FURNITURE FOR 1550 CONFERENCE ROOM AND 2510 CONFERENCE ROOM TO BE ABLE TO ACCOMMODATE VIRTUAL MEETINGS AND HYBRID MEETINGS. WORKING WITH ITS TO UPGRADE TECHNOLOGY NEED AND WILL NEED TO COORDINATE ELECTRICAL/STRUCTURAL WORK LATER ON. ADDITIONALLY, WOULD LIKE TO RECONFIGURE 1550 CONFERENCE ROOM IF POSSIBLE (REMOVE SINK AREA AND SHIFT THE EXIT DOOR TO WHERE THE SINK IS TO GAIN WALL SPACE FOR FLAT TV). WOULD ALSO LIKE TO REPLACE FURNITURE IN 1550 CONFERENCE ROOM AND SOME IN 2510 CONFERENCE ROOM. LOCATION: 1550 CONFERENCE ROOM AND 2510 CONFERENCE ROOM DESIRED COMPLETION DATE: KNOWN TIME CONSTRAINTS: THE PLAN IS FOR ALL STAFF TO RETURN TO CAMPUS BY AUGUST. WOULD LIKE THE PROJECT TO BE DONE BY THEN IF POSSIBLE AS WE NEED TO BE ABLE TO ACCOMMODATE BOTH VIRTUAL AND IN-PERSON MEETING AND HYBRID MEETINGS. DESIRED PROJECT COST: FUNDING CONTACT: SABTU-SCHAPER, SITI M | Open |
1407 | Kenneth Thelen | WJ38529 DESIGN - ELEC ENG - KT - BDSHR 1550 | Open |
1657 | Steven Daniels | WJ42500 DESIGN - ARCH - SD - RMS 1550L & 2510 - REMODEL | Open |
1778 | Andrew Mott | BDSHR, ESTIMATE TO REPAIR PILLARS THRU OUT BEARDSHEAR REQUESTING AN ESTIMATE FOR REPAIR OF PILLARS DO NOT EXCEED $5000.00 PILLAR DAMAGE GROUND FLOOR • PILLAR BY OFFICE 0460 - 1ST FLOOR • SOUTH/EAST PILLAR BETWEEN EAST ENTRYWAY (1100) AND CENTRAL LOBBY (1900) 2ND FLOOR • PILLAR BY OFFICE 2680 • PILLAR BY OFFICE 2810 | Open |
1798 | Steven Daniels | WJ21708 EST - ARCH - SD - REPAIR COLUMNS | Open |
1895 | Lisa Ristvedt | Beardshear Hall-Chilled Water Line Replacement-Phase 2 | Open |
2247 | Donna Imhoff | Design - Mech Engr - DI - Bdshr 1550/2510 | Open |
2313 | Patricia Kendall | BDSHR, ROOM 570 - CUBICAL WALL MODIFICATIONS COST RANGE WILL BE PROVIDED I WOULD LIKE TO HAVE SOME CUBICAL WALLS SWITCHED OUT FROM 65" HEIGHT TO 42" HEIGHT IN 0570 BEARDSHEAR. WE CURRENTLY HAVE THE NEEDED COMPONENTS IN STORAGE. WE WOULD THEN LIKE THE 65" HEIGHT WALLS INSTALLED IN 0680 BEARDSHEAR. LOCATION: I WOULD LIKE TO HAVE SOME CUBICAL WALLS SWITCHED OUT FROM 65" HEIGHT TO 42" HEIGHT IN 0570 BEARDSHEAR. WE CURRENTLY HAVE THE NEEDED COMPONENTS IN STORAGE. WE WOULD THEN LIKE THE 65" HEIGHT WALLS INSTALLED IN 0680 BEARDSHEAR. DESIRED COMPLETION DATE: DESIRED PROJECT COST: FUNDING CONTACT: KENDALL, PATTI M | Open |
5592 | Kendrick Fox | WJ34887_ PR024190 - CM - NCO - RF - RMS 1550 & 2510 | Open |
7146 | Kendrick Fox | WJ21162_ PR024018 - CM - NCO - RF - REPAIR PILLARS | Open |
16346 | Judy Dugan | WJ38530 - DESIGN - INT DES - JD - RMS 1550L AND 2510 - FURNITURE | Open |
16447 | Kendrick Fox | WJ43873_ PR024317 - CM - NCO - RF - RM 570 CUBICAL WALL MODIFICATIONS | Open |