Work Orders in Carver Hall

Showing all active work orders and all inactive work orders closed in the past 30 days.
WO # Requested by Description Status
1603 Leigh Wiand EST - INT DSN - LW - 208 MEDIA TABLE Open
1788 Kacie Schumann CARVER, RM 208 - MEDIATABLE COST RANGE WILL BE PROVIDED IN THE WRITING & MEDIA CENTER, WE WOULD LIKE TO PURCHASE A MULTIMEDIA TABLE (SEE ATTACHED PHOTO - WE'D LIKE SOMETHING SIMILAR TO THAT). WE WOULD LIKE THE TABLE TO BE FLAT ON THE EDGE THAT GOES UP AGAINST THE WALL, AND MORE ROUNDED ON THE END THAT STICKS OUT INTO THE ROOM. IDEALLY, IT WOULD HAVE A PANEL BUILT INTO IT WHERE WE COULD PLUG IN OUR COMPUTERS (AC POWER, USB, HDMI, ETC). WE WOULD LIKE IT TO BE BIG ENOUGH TO FIT 4 CHAIRS. FOR THE CHAIRS, WE'D LIKE THEM TO BE ROUNDED, ARMLESS, AND ON WHEELS IF POSSIBLE (SEE ATTACHED PHOTO - WE'D LIKE SOMETHING SIMILAR TO THAT). WE WILL BE MOUNTING A TV ON THE WALL NEXT TO IT SO STUDENTS CAN PLUG IN THEIR COMPUTERS TO DISPLAY THEIR WORK ON THE TV. I WILL ATTACH A PHOTO OF WHERE THIS WILL BE HAPPENING IN THE WMC. WE WILL BE REMOVING THE FURNITURE THAT IS CURRENTLY THERE. PLEASE CONTACT KACIES@IASTATE.EDU WITH ANY QUESTIONS. KNOWN TIME CONSTRAINTS: WE WOULD LIKE THIS TO BE PURCHASED BEFORE THE END OF THIS FISCAL YEAR (JUNE 30). FUNDING CONTACT: SCHUMANN, KACIE LYNN Open
1791 Leigh Wiand WJ44099 - DESIGN - INT DSN - LW - RM 32 - PURCHASE 31 CHAIRS Materials-Awaiting
1797 Leigh Wiand ORDER FURNITURE Open
1933 Lisa Ristvedt Carver Hall-Room 0101-Renovation Open
2217 Lisa Ristvedt Carver Hall-Roof Replacement-Section B Open
2789 Bruce Bonestroo PR023496 - DESIGN - ARCH - BB - ROOF SECTION B Open
3817 Angela Solberg WH16957 - Miscellaneous Open
107653 Kathleen Baumgarn ROOM 32 - PURCHASE 31 CHAIRS NO ESTIMATE REQUESTED, PROJECT WILL BE APPROVED I NEED TO ORDER 31 CHAIRS FOR THIS CLASSROOM. THE DD NUMBER TO USE IS DD02661. THANK YOU. KATIE B. Open
115200 Melissa Warg FPM - FDC - PM - FEES Open
115244 Leigh Wiand ORDER FURNITURE Open
115252 Leigh Wiand INSTALL FURNITURE Open
115254 Leigh Wiand SK DESIGN SERVICES Open
115825 Lisa Ristvedt Carver Hall-Fire System Standpipes-Improvements Open
115827 Lisa Ristvedt Miscellaneous Open
115828 Lisa Ristvedt Builders Risk Open
115829 Lisa Ristvedt Printing/Distributing Bidding Documents Open
122765 Jon Harvey Consultant Agreements-Primary Open
122766 Jon Harvey Miscellaneous Open
122767 Jon Harvey Builders Risk Open
122768 Jon Harvey Printing and Distributing Bid Documents Open
122770 Jon Harvey Design-Electrical Engineer-KT-Carver Roof B Open
122771 Jon Harvey Design-Mechanical Engineer-DI-Carver Roof B Open
122797 Jon Harvey Hire Central States Open
129667 Melissa Warg DESIGN - MECH ENGR - BG - Fire System Standpipes-Improvements Open
129671 Melissa Warg DESIGN - ELEC ENGR - WS - Fire System Standpipes-Improvements Open
136713 Lisa Ristvedt Misc Purchases-Nelson Open
141434 Melissa Warg FPM - FDC - PM - FEES Open
150646 Gene Leamen Isolate domestic water for repairs Attn. Brad Lyons On Hold
150647 Gene Leamen Isolate heating water for repairs Attn. Brad Lyons On Hold
173760 Lori Sulzberger The door does not automatically close and latch. Materials-Awaiting
181021 Lisa Ristvedt Document Reviews Open
184286 Lona Boyarsky The mechanics of the door are not working correctly. The occupant says that the door is very hard to open, and won't stay open when fully open. Door needs to be kicked to get it open. This problem has been going on for a long time but she didn't speak up. Estimating
190475 Kathleen Baumgarn Total renewal of the general university classroom, Carver 0160. There will be a new ceiling, lighting, paint, flooring, infrastructure for AV and new seating. Would like an estimate by June 30, 2022. Thank you. Katie B. Open
190524 Melissa Warg FDC FEES - DO NOT CHARGE TIME Open
190572 Steven Nelson Fire Alarm Support Open
190630 Steven Nelson Telecommunications Open
197286 Lindsay Foster We would like to reorder some adjustable height desks. We would to order 2 of the adjustable height desks - would prefer the preset option and the size would be 70x30 in. We ordered some previously in 2020 that we liked. Thank you! Open
197290 Melissa Warg FDC FEES - DO NOT CHARGE TIME Open
200970 FPM Service Desk FY23 CARVER - General Cleaning Open
200973 FPM Service Desk FY23 CARVER - SLA Cleaning For Cyclone Cinema Open
201952 FPM Service Desk FY23 CARVER - Supplies Open
208718 Steven Nelson Order Versteel Teaching Station Open
214448 Gail Koobs Corrosion on the domestic water line in room R0381B, custodial closet, 3rd floor. The insulation was wet when we removed it, and there is corrosion on the tee to the right of the custodial basin. Check with Dale Lutter. On Hold
214450 Gail Koobs Insulate the domestic water lines at Carver, R0381B, custodial closet On Hold
217192 Michael Richards Purchase Furniture Open
217199 Michael Richards Install Furniture Open
223382 Monic Behnken We are taking this space over after a group moved out. We would like to transition this space into a multicultural student service center that has 3 offices, three student spaces (collaboration space, quiet study space, lounge), and kitchen, and a general seating area in the middle. We would like an estimate on patching/painting/carpet square replacement. We would also like to work with an interior designer to develop a furniture budget. Open
223383 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
223922 Ben Young Replace the mechanical turbo condensate meters with a single mag flow meter. Open
230140 Paul Barloon The right-hand door as you enter the room (0400-2) does not close properly. To close it completely, it must be forced through the last inch or so. That makes it difficult to unlock/open until you understand the problem. It appears to be an issue with the mechanical closing mechanism. The lock appears to be working correctly. Materials-Awaiting
230518 Lona Boyarsky The Math department is looking into getting digital displays for the hallways on 3rd and 4th floor. Perhaps 2 or 3 of them. We would like to get a quote to find out how much it would cost to get electric outlets and the necessary computer wiring placed where the new displays would go. Please contact me or Andy VanWyk for more specifics. Thank you. Assigned
230985 Nicholas Smith Hire contractor to repair east elevator. Elevator doors will open and close but the car will not move. ATTN Tom Webster Assigned
238040 Taren Reker ISU PD has recommended the following additions to 150 Carver Hall: One 180 camera Adding an additional door Installing duress buttons in each office (5) and main lobby Open
238045 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
238955 Nicholas Smith hire contractor to troubleshoot west elevator ATTN Tom Webster Assigned
239248 Amanda Hallman Carver Hall (411 Morril Road). Both elevators are now broken, which provides no access for anyone with a disability or injury to get above the first floor. Per email 11/14/2022 at 4:14p.m. Completed
251395 Kathleen Baumgarn Design and install room capacity sign for 0004 Carver Hall. Room capacity is 60 Open
251444 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
255287 Leslie Ginder I am requesting a graphic vinyl covering of the glass door of 150 Carver Hall Open
255291 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
258109 Joseph Stoberl FPM Shops to visit requestor Leslie Ginder (515 294 8691) and discuss window covering for glass door. See request below. Original request: I am requesting a graphic vinyl covering of the glass door of 150 Carver Hall Assigned
260003 Kris Kilibarda Need to restructure some spaces in Carver 210 and 218 to allow for additional staff members and student gathering space. Open
260431 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
260574 Lyle Bishop Smoke Detector M1-40 not found - room 196, checked above ceiling, device not found. Open
267023 Scott Lucken Faucet does not flow water Completed
268189 Laverne Williams back flow preventer is dripping over break table Assigned
268192 John Moore air handler 5 coils are broke we tried to fill chilled water saw water coming out of coils by the door on the north side Completed
268279 Nicholas Smith have elevator contractor troubleshoot door operator problems [ doors randomly wont close ] ATTN Tom Webster Assigned
268583 Kathleen Baumgarn The east door going into Carver 0004 bangs shut, as if the door is too heavy. Please have this checked and adjusted, as it is disruptive to the neighboring classrooms. Thank you. Katie B. Materials-Awaiting
272162 DPS dispatch DPS got call from DPS saying they had a report of a loud alarm in RM 8 Assigned
272185 Laverne Williams the hot water pump #1 has a small leak under the expansion joint Assigned
272200 Lona Boyarsky The AC/fan in my office stopped working, and playing with the thermostat doesn’t help. Assigned
273284 Mary Saienga Left elevator paused between 2nd and 3rd floor for a few minutes then went up to the 4th floor to open, paused a minute before opening. (occupants had entered on 1st floor and only selected 3rd floor) Assigned
273417 Kathleen Baumgarn We need to have a hand railing installed in this auditorium, Carver 0001. Please estimate what it would cost to have these installed for accessibility. Thank you! Katie B. Open
273493 Melissa Warg FDC MGMT FEES Open
274855 Timothy Lentsch no power to the lights in room 202 teacher can't teach class prpoperly Assigned
274878 Sara Marcketti This is pre-work for submission of an ISU Strategic Plan grant that we are working with FPM to rejuvenate and make more student-centric the Test Center in 60 Carver. Open
274879 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
274927 Hillary Anderson north central elevator issue Assigned
275030 Nicholas Smith have contractor replace bearings on door operator arms for both elevators ATTN Tom Webster Assigned
279238 William Oatman Grounding prong broken off plug and stuck in lower socket at the front of the classroom Assigned
279498 Robert Currie On the NW side of Carver there is water leaking down the soffit - possible heating water line break. Completed
279505 Kris Kilibarda We need some new furniture in the entryway and student gathering space in our WiSE office. Open
279514 Paul Engelken On the south side of Carver, one of the concrete pillars is cracked and looks like it is going to break off. Assigned
279540 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
279670 William Oatman Automatic lights blink on and off between 6 and 10 times when turned on for the first time in a day. Might be an electrical issue instead of lighting Assigned
279736 Monic Behnken his project will remodel the existing office space assigned to the College of Liberal Arts and Sciences (LAS) into a student service center. This project includes, but is not limited to, architectural, mechanical, electrical, and furniture installation. Open
279739 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
279818 Kris Kilibarda Purchase of office desks for staff Open
279984 Timothy Lentsch no lights on 202 was nd 204 Assigned
280023 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
280189 Ben Young Parent work order for building condensate return metering upgrade. Removing two mechanical turbine meters for one magnetic flow tube w/ remote transmitter. Open
280225 Ben Young Install fused disconnect and transmitter for condensate return metering. 120 VAC circuit to transmitter. Two pairs of 18-2 twisted shielded between flow tube and transmitter. This display will be read locally by meter readers, please locate where it can easily be accessed every month. Open
280336 Abigail Zumpano Order and Install furniture Open
280410 Jeffrey Ellsworth one chair has a broken wheel-located at front of clasroom Assigned
281009 Abigail Zumpano Order and Install Furniture Open
281029 Quintin Long Buffer does not engage and spin when button is depressed and lever is pulled. Assigned
281095 Alex Wiley AED Cabinet alarmed during test. Assigned
281140 Abigail Zumpano Issue PO to Story Construction Open
281143 Abigail Zumpano Fire Alarm Support Assigned
281146 Abigail Zumpano AV Intramural Open
281148 Abigail Zumpano Parking Intramural Open
281151 Abigail Zumpano ITS Intramural Open
281154 Abigail Zumpano Electrician to disconnect furniture whip Completed
281176 Abigail Zumpano Order and Install Furniture Open
281237 Tessa Brow The automatic flushing sensor does not work in the second stall from the right (when facing the stalls, with your back to the sinks). This is not an emergency by any means (it's been broken for months), but people do often miss flushing since they expect it to be automatic. Thanks! Assigned
281354 Michelle Lenkaitis Pipe leaking under middle sink and water running across floor. Assigned
281514 Kelly Simmons Custodial project: stripped floor and waxed Open
281522 William Oatman Dripping pipe under middle sink, not a big leak. Looks like fitting might be loose Assigned
281614 Tessa Brow Lona Boyarsky (Carver Hall building supervisor) and I are on a quest to update the wayfinding signage and paint for Carver Hall. I, Tessa Brow, Director of Career Services, am taking a lead on this project since my office is on the first floor and regularly fields questions from lost students looking for other resources. We hope our signage could look something like what was recently installed in Beardshear. And we hope to create a uniform design standard for the whole building (at least in hallways and common spaces). Lona and I have done an initial walkthrough to determine how many signs we'd like and where we think they should be placed. I have also gotten permission from LAS's Communications office to have one of their graphic designers make the actual sign designs. So we're now in the phase of wanting to get a quote for the project. In an ideal world, we would do the whole building at the same time. But, if we need to start with just the first floor, we can. If we were to do the entire building, as a multi-occupancy building, we want to develop a formula to split the cost with all departments/occupants so each entity is paying an amount proportional to their space usage. Once we have a rough quote, we hope to loop in the department chairs and other leaders to get their buy-in (with the cost and design proposal) and determine a realistic timeline for the project. The account below (PG103158) can be used for the cost of the estimate. We will need to add additional accounts and adjust the formula before we move forward with any actual construction/installation. Open