1196 Matthew Post Coover - Room 1313 - Computer Tables COST RANGE WILL BE PROVIDED WE ARE LOOKING TO REPLACE THE COMPUTER TABLES/BENCHES IN COOVER 1313 THIS SUMMER. WE NEED TABLES THAT CAN PROVIDE POWER AND BE MOVED AROUND OCCASIONALLY DURING THE SEMESTER. I'D LIKE TO BE ABLE TO LOOK AT SOME AVAILABLE OPTIONS ON CAMPUS TO DETERMINE IF THERE'S SOMETHING THAT WILL MEET OUR NEEDS. I'D LIKE TO SCHEDULE A BRIEF MEETING ASAP TO DISCUSS OUR NEEDS AND FIND SOME OPTIONS TO LOOK AT. DESIRED COMPLETION DATE: KNOWN TIME CONSTRAINTS: THIS NEEDS TO BE COMPLETED MID-JULY TO BE READY FOR THE FALL SEMESTER. Open
1559 Rebecca Cantrall WJ39542 - DSN - INT DSN - RC - COMPUTER TABLES Completed
7213 Melissa Warg Coover - CM - NCO - CR - RM 1313 - Computer Tables Open
96748 Ann Keller WH42465 - NORTH ELEVATOR 1 ENTRAPMENT Completed
97866 Eric Ohrt Order Furniture Open
97867 Eric Ohrt Install Furniture Open
104437 Scott Jasper COOVER - ROOM M1300 - EXTEND HEATING LINES COST RANGE WILL BE PROVIDED THE ORIGINAL HEATING SYSTEM SERVING OLD COOVER IS NOW 70 YEARS OLD. IT HAS MULTIPLE PIPING LEAKS THAT ARE BEING ADDRESSED THIS SUMMER. THE ORIGINAL HOT WATER CONVERTERS ARE AT THE END OF THEIR USEFUL LIFE AND ARE LIKELY TO FAIL SOON. WHEN NEW COOVER WAS BUILT IN 2007, ITS HEATING SYSTEM WAS DESIGNED WITH CAPACITY TO HANDLE BOTH NEW COOVER AND OLD COOVER. LARGE 4" HOT WATER SUPPLY AND RETURN LINES WERE ROUTED THROUGH THE CRAWL TUNNELS TO CONNECT NEW COOVER TO OLD COOVER AT A FUTURE DATE. PLEASE PROVIDE A COST ESTIMATE TO EXTEND THESE HEATING LINES IN ORDER TO CONNECT THE TWO PARTS OF THE BUILDING TOGETHER. THE INTENT WOULD BE TO LEAVE THE FOUR SMALL CIRCULATION PUMPS SERVING OLD COOVER IN ORDER TO PROVIDE THE APPROPRIATE WATER TEMPERATURE TO EACH SECTION OF THE ORIGINAL BUILDING. THESE 4 PUMPS WOULD SERVE AS SECONDARY PUMPS, WITH THE PRIMARY PUMPS BEING THE TWO PUMPS IN NEW COOVER. THE INTENT WOULD ALSO BE TO REMOVE THE TWO ORIGINAL HEAT EXCHANGERS OUT OF THE M1300 BASEMENT. THIS PROJECT WOULD REDUCE THE AMBIENT TEMPERATURE OF THE MECHANICAL ROOM M1300, WHICH NEGATIVELY AFFECTS THE DEPARTMENTAL OFFICE DIRECTLY ABOVE. THIS PROJECT WOULD ELIMINATE SOME DEFERRED MAINTENANCE CONCERNS, AS THE ORIGINAL SYSTEM IS AT THE END OF ITS USEFUL LIFE. THIS PROJECT WOULD FULFILL THE MASTER PLAN FOR THIS BUILDING, AS IT WAS ALWAYS THE INTENT TO HAVE THESE TWO SYSTEMS CONNECTED TOGETHER. DESIRED COMPLETION DATE: KNOWN TIME CONSTRAINTS: THE SYSTEM IS DRAINED DOWN FOR THE SUMMER. THE GOAL WOULD BE TO HAVE THE TWO SYSTEMS CONNECTED TOGETHER BY THE OCTOBER 1ST. DESIRED PROJECT COST: FUNDING CONTACT: NETWAL, JOHN GERARD Open
104439 Melissa Warg CM - NCO - CR - ROOM M1300 - EXTEND HEATING LINES Open
104453 Melissa Warg DESIGN - MECH ENGR - SJ - ROOM M1300 - EXTEND HEATING LINES Open
104947 Lynne Dubert COOVER - ROOM 1219 - SOUNDPROOF ROOM My supervisor, Sara Harris, would like to schedule an in person meeting to discuss this room and sound proofing it. I think this is something they wanted to move quickly on. You can reach Sara at 294-1097, or me at 294-2664. Open
105029 Melissa Warg CM - NCO - CR - ROOM 1219 - SOUNDPROOF ROOM Open
113486 Melissa Warg DESIGN - ARCH - JB - ROOM 1219 - SOUNDPROOF ROOM Open
163528 Melissa Warg FDC FEES - DO NOT CHARGE TIME Open
164699 Gary Puls Window Was Stuck Open and Cracked when Shutting it On Hold
171436 Lynne Dubert We would like to get an estimate on some basic grad student office desks. We are not sure if there are standard ones now, or how many we will be ordering, but we would like to discuss with someone about perhaps purshasing quite a few. Open
171441 Melissa Warg FDC FEES - DO NOT CHARGE TIME Open
189368 Lynne Dubert We have 2 doors for the main office. this is concerning the back door (we have a sign that says exit). we lock this door at night, however unless we slam the door closed, we have found it can get stuck open. it shere a way to make sure it closes tightly automatically? On Hold
190256 Michael Hanson AHU 12 return fan needs 3 new smoke-isolation damper actuators installed. Completed
198083 Stacey Ross Two existing workstations to be upgraded with height-adjustable desks. Is it possible to reuse any of the existing desk components? We have U-shaped work areas, and want only part of the desk to raise to standing height. Open
198122 Melissa Warg FDC FEES - DO NOT CHARGE TIME Open
200976 FPM Service Desk FY23 COOVER - General Cleaning Open
202030 FPM Service Desk FY23 COOVER - Supplies Open
223926 Ben Young Replace mechanical condensate meters with single mag flow meter. Open
224715 Randall Tabor Passenger elevator in the new addition has difficulty opening doors on the 3rd floor unless you press the door open button. Completed
241871 Jason Boyd The corridors and vestibule that connect the west and east entrances to Coover need to be updated to prepare for themed signage and decor. The ceilings, walls, doors, and trim need new paint. The floors need updated as well. We would like some options and estimates as soon as possible. Final choices will need to work with whatever theme and artwork is decided on, but the initial estimates do not need to include details like color. Open
245642 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
246599 Christine Maduro The domestic water service at Coover Hall is showing signs of degradation and corrosion. Maintenance requires evaluation of the existing system as well as a scope and cost for replacement/repair. Open
246600 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
248187 Lynne Dubert Not sure if the heat is turned down for t he holiday, but one of the students in this room feels it is pretty cold. Completed
248263 Leigh Wiand Workspace to order and install Open
251575 Lynne Dubert This faculty office has been too cold. I thought I sent a work order for it, but did not. Thank you. Completed
252123 Lynne Dubert We had a water leak and it damaged quite a few ceiling tiles in Coover. Can we request replacements for the following rooms in Coover: 3108 (most of the damage) 3107 3101 3102 The hall right outside of these rooms also Assigned
252321 Lynne Dubert There is a leak in the TLA, a large room that students use, lots of computer equipment. nice room. Can this please be looked at ASAP, since the weekend is here and students come back Monday. Assigned
252814 power plant power plant Call back-power plant Wednesday night- called in not heat in office Completed
254346 Lynne Dubert There is a wall clock in this hall, older part of building, fastened on a corner, that is broke. Can this be fixed? Assigned
258771 Paul Clark ceiling panels are out of place. not sure if anyone did anything up there. There is a cover for something laying on the counter. Assigned
259037 Abigail Zumpano Grad Student Desks for workspace to order and install furniture Open
259045 Lynne Dubert I previously questioned about wanting to plumb our Coover Breakroom for a new coffee maker. Since a licensed plubmer must do this, I was told to fill out this form, as we would like to proceed with this. We were quoted 500.00, however this room MAY have had some previous plumbing done, so I assume that will change the price. Mike McCoy responded to another email, that was then fwd to me. Assigned
259102 Lynne Dubert we had a leak after the holiday break, that ruined many ceiling tiles in the 3rd floor hall, and in at least 2 rooms. I did send a request to have these looked at and replaced, however I wanted to mention that there is a long wire sticking out of one of these empty spots. Thank you, Materials-Awaiting
259103 Lynne Dubert The toilets in the 3rd floor women's restroom seem to keep "running" and, I am told, flushing whenever it wants! Thank you Assigned
259208 Paul Clark toilet flushes by itself Materials-Awaiting
259219 Paul Clark track light out south end of 3rd Assigned
259220 Paul Clark 2 lights out in hall in front of elevator on new side of building Assigned
259669 Paul Clark There was a water leak in this part of the building a while back. some ceiling tiles were removed from this office. could we replace them. Assigned
260249 Lynne Dubert We would like to have someone come to Coover hall and look at some old desks as we would like to order some new ones for some staff members. Open
260318 Paul Clark 2 large globe lights are burnt out. Will need Genie Lift. May not have these bulbs in stock. Completed
260437 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
260577 Lyle Bishop Battery expired - 4009 CC159W Rm 1331 NE mezzanine. Open
261410 Namrata Vaswani Office is extremely hot Completed
261433 Namrata Vaswani Coover 3121 and the room that controls its heating which is Coover 3113 are extremely hot today. My AC remote reads 80F. Something's wrong for sure, it's never this hot ever. Completed
261434 Paul Clark Hall light out near 3025. T-8 Assigned
261438 Paul Clark can light out north sitting area Assigned
261536 Vicky Thorland-Oster Very cold air out of the HVAC system (that is a change from last week) Phone number: 294-8778 Completed
265157 Alex Wiley Install new surface-mount AED cabinet with Metasys DPS monitoring across from 1212 Open
265210 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
265220 Paul Engelken Need ceiling tile repair in hall On Hold
265455 Abigail Zumpano Install Electrical for AED Assigned
265456 Abigail Zumpano Install controls Assigned
265476 Lynne Dubert This room was looked at and the facilty person put in a work request to have the air unit sealed better as it is too cold. Assigned
265558 Lynne Dubert one of the shades in this conference room is messed up. Can this be looked at and fixed? Thank you! Completed
266301 Rachel Hall 1light out Assigned
266328 Rachel Hall 3 lights out Assigned
266616 Laverne Williams The thermostat cover and box is missing wires showing, The carpet in front of screen is coming up and the wall above the exit door on lower level is tore up Completed
266617 Laverne Williams floor is coming up by front pillar next to window Materials-Awaiting
266643 Nicholas Smith hire elevator contractor to troubleshoot break issue. motor tries to run but breaks wont release and resistors glow. ATTN Tom Webster Completed
266645 Laverne Williams The carpet in front of screen is coming up and the wall above the exit door on lower level is tore up Assigned
266901 Rachel Hall 1light out Assigned
267025 Paul Clark Urinal is leaking when flushed Assigned
267099 Lynne Dubert There is a clock mounted on a corner in the hall on 3rd floor. The clock has 2 sides. I think they need new batteries as well as the time changed on them. If this is something we should be doing ourselves, please let me know. Assigned
267102 Lynne Dubert Can you let us know if the heating has been turned off, or is there something that is done to regulate the heat in the building, through FP&M people? Assigned
267132 Charles Nelson Window AC Unit 132 - ACW132 needs to be replaced Assigned
267153 Elizabeth Salton Chairs 1 and 2 on row H are loose and in need of repair/tightening Assigned
267264 Matthew Post AC is not cooling the room. It is a locked lab with a server running so it is around 80 degrees. Also the AC is very loud - not sure if anything can be done about that but students have been complaining. Thanks Open
267277 Paul Clark halide bulb burnt out in perimeter lighting.is in the southeast corner of the room. Assigned
267334 Lynne Dubert Just today quite a few of the lights in this office have burned out. This is the Chair's office, and makes the room very dim. And we are not sure if there is an underlying cause to this. Can this be looked at soon? Assigned