Work Orders in Elings Hall
Showing all active work orders and all inactive work orders closed in the past 30 days.
WO # | Requested by | Description | Status |
---|---|---|---|
9979 | Cynthia Frame | Elings Hall - ROOM 4036D - ADD SECOND WORKSTATION COST RANGE WILL BE PROVIDED PLEASE DIVIDE THE DESK IN 4306D TO MAKE TWO WORK STATIONS. DESIRED COMPLETION DATE: KNOWN TIME CONSTRAINTS: THIS WOULD NOT BE DONE UNTIL AFTER JULY 1. DESIRED PROJECT COST: FUNDING CONTACT: HOUGH, PHILIP EDWARD | Open |
9980 | Christine Reinders-Caron | WJ43863-PR024313 - CM - NCO - CR - RM 4036D - ADD SECOND WORKSTATION | Open |
96348 | Melissa Warg | DESIGN - INT DSN - RC - ROOM 4306D - ADD SECOND WORKSTATION | Open |
170985 | Cynthia Frame | The glass doors on the south side, the one inside the entryway east door is broken. The mechanism at the top is completely broken on the door. | Completed |
246549 | Cindy Frame | The handicapped door is slamming and knocking stuff off the walls in the office on the other side of the wall. Can this be tightened down so it doesn't slam | Materials-Awaiting |
251281 | Cindy Frame | The air handlers are making a high pitched squeal (again). | On Hold |
280167 | Cindy Frame | The motion sensor is not working and the lights keep shutting off in 4306D. | Assigned |
288712 | FPM Service Desk | FY24 ELINGS - General Cleaning | Open |
288820 | FPM Service Desk | FY24 ELINGS - Supplies | Open |
305295 | Cindy Frame | Clean up from plugged and overflowing toilets. | Assigned |
305326 | Thomas Brumm | One of the urinals in the men's room 4th floor Elings Hall overflows when flushed. Water is spilling all over the floor. | Completed |
310606 | Ahmed Cheklal | Women's bathroom on the second floor has multiple clogged toilets'. | Completed |