1184 | Lisa Ristvedt | Hilton Coliseum-North & South Concourse Expansion | Open |
96211 | Randolph Larabee | WH28483 - UTIL ENGR-HILTON CONCOURSE EXPANSION | Open |
107803 | Andrew Kautman | Can you put together a service request to perform a structural deferred maintenance evaluation of Hilton Coliseum? Attn Jon Harvey | Assigned |
164612 | Lisa Ristvedt | Hilton Coliseum-Rooms 0176, 0176A, 0188, & 0188A-Renovation | Open |
164614 | Lisa Ristvedt | Miscellaneous | Open |
165630 | Jonathan Harvey | Work Order to work through Procurement for new Lockers | Open |
223209 | Brian Lamb | Air Temp Sensor Bad in Mechanical Room Under Jonny's | On Hold |
224885 | Christine Maduro | Workorder for heating system need analysis | Open |
251433 | Brian Lamb | humidity and control and cooling | Assigned |
258391 | Lisa Ristvedt | Structural analysis | Open |
280606 | Steven Nelson | Miscellaneous Purchases | Open |
280898 | Steven Nelson | Fire Alarm Support | Open |
281065 | Andrew Kautman | Please submit a service request to FPM to evaluate some interior concrete repairs at Hilton Coliseum referenced in the attached quote. (exterior repairs are being handled separately). The interior repairs will likely require removal of portions of the wood-slatted ceiling from the entrances leading from outer to inner concourse (picture below). We will need some assistance in developing a plan to repair and replace all or portions of that ceiling. | Open |
281069 | Melissa Warg | FDC MGMT FEES - DO NOT CHARGE TIME | Open |
286859 | Steven Nelson | Fire hydrant flow test | Open |
290039 | Timothy Kelley | ATTN Brandon - Please contact Tim for more details - There is a leaking pipe that they need access to above the 3rd floor women's restroom on the SE side of Hilton. They need 2 of the catwalk boards removed to access the area. | Completed |
290434 | FPM Service Desk | FY24 Elevator Inspection Fees 1201 - HILTON | Open |
290436 | FPM Service Desk | FY24 Elevator Inspection Fees 1202 - HILTON | Open |
290437 | FPM Service Desk | FY24 Annual Maintenance for Emergency Power Generator - HILTON - E041362 | Open |
293912 | Steven Nelson | Remove and replace valves. Mike Kemble | Open |
296575 | Steven Nelson | Tech. Support | Open |
301427 | Steven Nelson | Testing and Balancing | Open |
315530 | Andrew Kautman | This project includes, but is not limited to, repairs to the stairs and landings and placement of shoring under the stair landing and walkway of the south stairway and Hilton Coliseum. | Open |
315531 | Melissa Warg | FDC MGMT FEES - DO NOT CHARGE TIME | Open |
315545 | Josef Biechler | Contracts | Open |
316625 | Abigail Zumpano | Providing, delivery, and installation of (4) Jersey Barriers to the South walkway of Hilton. Josef Biechler will advise when they need to be delivered and installed. Attention: Barb Steiner | Assigned |
318475 | Josef Biechler | Parking | Open |
323789 | Brian Lamb | N.W. Men's Restroom, Furthest North Urinal Needs Replaced | Completed |
329355 | Wade Siskow | Light FWC55 on the south set of stairs on the south side of Hilton is out. | Materials-Awaiting |
329751 | Steven Nelson | Lighting upgrade for locker rooms. | Open |
330091 | Jessica Pritchard | Moving Charge from CP964884 to PG100319-DD00313 for Lockers Incorrectly billed to the Capital Project per Jon Harvey, Chris Jorgensen and Andrew Kautman | Open |
338243 | Andrew Kautman | Can you submit an FPM project request to look at adding/replacing security cameras within Hilton Coliseum as well as converting a couple of entrances to key-card entrances. | Assigned |
338447 | Miles Pankonen | Hilton Heating Coil per Miles Pankonen. Brian Grove is working with Miles on this. | Open |
342306 | Andrew Kautman | Miles, Thank you for contacting EH&S regarding your project in 0390 Hilton. I was able to visit the site the morning with Justin Abbott with FP&M and look at the space. Justin indicated that with his current manpower schedule, he would not be able to complete this work. I have requested REW make 10-day notification to remove 23 asbestos containing fittings from the AHU water lines. We anticipate the work requiring 1 day of labor onsite. We estimate the cost for the project to be $1600 for REW Services and $800 for EH&S for oversight, air sample collection and analysis, and waste disposal. I have requested a start date of February 26th. Feel free to contact us with any questions or concerns. At your convenience, can you please create a work request for EH&S services related to this project. Thanks, Chuck Rodgers, CHMM | Open |
349221 | Justin Abbott | abatement | Open |