Work Orders in Hilton Coliseum

Showing all active work orders and all inactive work orders closed in the past 30 days.
WO # Requested by Description Status
1184 Lisa Ristvedt Hilton Coliseum-North & South Concourse Expansion Open
96211 Randolph Larabee WH28483 - UTIL ENGR-HILTON CONCOURSE EXPANSION Open
107803 Andrew Kautman Can you put together a service request to perform a structural deferred maintenance evaluation of Hilton Coliseum? Attn Jon Harvey Assigned
164612 Lisa Ristvedt Hilton Coliseum-Rooms 0176, 0176A, 0188, & 0188A-Renovation Open
164614 Lisa Ristvedt Miscellaneous Open
165630 Jonathan Harvey Work Order to work through Procurement for new Lockers Open
223209 Brian Lamb Air Temp Sensor Bad in Mechanical Room Under Jonny's On Hold
224885 Christine Maduro Workorder for heating system need analysis Open
251433 Brian Lamb humidity and control and cooling Assigned
258391 Lisa Ristvedt Structural analysis Open
280606 Steven Nelson Miscellaneous Purchases Open
280898 Steven Nelson Fire Alarm Support Open
281065 Andrew Kautman Please submit a service request to FPM to evaluate some interior concrete repairs at Hilton Coliseum referenced in the attached quote. (exterior repairs are being handled separately). The interior repairs will likely require removal of portions of the wood-slatted ceiling from the entrances leading from outer to inner concourse (picture below). We will need some assistance in developing a plan to repair and replace all or portions of that ceiling. Open
281069 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
286859 Steven Nelson Fire hydrant flow test Open
290039 Timothy Kelley ATTN Brandon - Please contact Tim for more details - There is a leaking pipe that they need access to above the 3rd floor women's restroom on the SE side of Hilton. They need 2 of the catwalk boards removed to access the area. Completed
290434 FPM Service Desk FY24 Elevator Inspection Fees 1201 - HILTON Open
290436 FPM Service Desk FY24 Elevator Inspection Fees 1202 - HILTON Open
290437 FPM Service Desk FY24 Annual Maintenance for Emergency Power Generator - HILTON - E041362 Open
293912 Steven Nelson Remove and replace valves. Mike Kemble Open
296575 Steven Nelson Tech. Support Open
301427 Steven Nelson Testing and Balancing Open
315530 Andrew Kautman This project includes, but is not limited to, repairs to the stairs and landings and placement of shoring under the stair landing and walkway of the south stairway and Hilton Coliseum. Open
315531 Melissa Warg FDC MGMT FEES - DO NOT CHARGE TIME Open
315545 Josef Biechler Contracts Open
316625 Abigail Zumpano Providing, delivery, and installation of (4) Jersey Barriers to the South walkway of Hilton. Josef Biechler will advise when they need to be delivered and installed. Attention: Barb Steiner Assigned
318475 Josef Biechler Parking Open
323789 Brian Lamb N.W. Men's Restroom, Furthest North Urinal Needs Replaced Completed
329355 Wade Siskow Light FWC55 on the south set of stairs on the south side of Hilton is out. Materials-Awaiting
329751 Steven Nelson Lighting upgrade for locker rooms. Open
330091 Jessica Pritchard Moving Charge from CP964884 to PG100319-DD00313 for Lockers Incorrectly billed to the Capital Project per Jon Harvey, Chris Jorgensen and Andrew Kautman Open
338243 Andrew Kautman Can you submit an FPM project request to look at adding/replacing security cameras within Hilton Coliseum as well as converting a couple of entrances to key-card entrances. Assigned
338447 Miles Pankonen Hilton Heating Coil per Miles Pankonen. Brian Grove is working with Miles on this. Open
342306 Andrew Kautman Miles, Thank you for contacting EH&S regarding your project in 0390 Hilton. I was able to visit the site the morning with Justin Abbott with FP&M and look at the space. Justin indicated that with his current manpower schedule, he would not be able to complete this work. I have requested REW make 10-day notification to remove 23 asbestos containing fittings from the AHU water lines. We anticipate the work requiring 1 day of labor onsite. We estimate the cost for the project to be $1600 for REW Services and $800 for EH&S for oversight, air sample collection and analysis, and waste disposal. I have requested a start date of February 26th. Feel free to contact us with any questions or concerns. At your convenience, can you please create a work request for EH&S services related to this project. Thanks, Chuck Rodgers, CHMM Open
349221 Justin Abbott abatement Open