Work Orders in Power Plant

Showing all active work orders and all inactive work orders closed in the past 30 days.
WO # Requested by Description Status
18 Lindsey Wanderscheid WJ35696 - Utilities - Power Plant - Boiler Resiliency Study Open
1192 Lisa Ristvedt Util-Power Plant-Station Power Improvements Open
1204 Kathy McKown Util-Power Plant-Condenser Water Piping-Repairs Open
1220 Randolph Larabee WF22203 - UTIL ENGR-STATION POWER PROJECT Open
1232 Randolph Larabee WJ01588 - PURCHASE SWITCHGEAR AND TRANSFORMER FOR PHASE 1 SUBSTATION Open
1278 Randolph Larabee WH27187 - UC SHOP SUPPORT POWER PLANT STATION POWER STUDY Open
1284 Joseph Mesner WJ34051 DSH-P-03 - DESUP DISCHARGE CHECK VALVE(DSH-CV-150) LEAKS BY Open
1396 Matthew Shriver TG3 - AT NEXT OVERHAUL NEED TO DO SOME OIL MITIGATION EFFORTS 1. IN THE BOX WHERE THE ARRESTORS AND GENERATOR LEADS ARE THE BARRIER BOARDS NEED TO BE REMOVED AND CLEANED IN SOLVENT TANKS. 2. WHEN THE BARRIER BOARDS ARE INSTALLED, GORTEX AT LEAST 1/2" WIDE ON BARRIERS, THEN THEY NEED TO BE SILICONED AROUND THERE THE BUSS PENETRATES AND THERE THE MEET IN THE MIDDLE. ALSO NEED TO SILICONE THE UNDERSIDE OF THE WASHERS ON BOLTS AND AROUND THE ENDGE OF THE BARRIER BOARDS. Open
1513 Gordon Woods WJ12130 TG5 - CIRC WATER LINE FROM TOWER THROUGH THE WALL HAS CORROSION ON THE BOTTOM OF THE LINE. RAISING QUESTIONS OF THE THICKNESS OF THE PIPING WALL GIVENRECENT FAILURES ON THE LINE OUTSIDE OF THE PLANT. INVESTIGATE AND CORRECT ROOT ISSUE Open
1525 Lisa Ristvedt Util-Power Plant-External Stack Repairs Open
1683 Lisa Ristvedt Util-Power Plant-Abb Software And Scada Upgrades Open
1707 Matthew Shriver S - EAST AND WEST 6 LB PRESSURE TRANSMITTERSARE DIFFERENT THAN THE REST OF THE PTS ON SITE. BOTH THE EAST AND WEST 6 LB PRESSURE TRANSMITTERS PT-02 (EAST) & PT-03 (WEST) NEED TO BE REPLACED DUE TO A MANUFACTURE ABNORMALITY BUILT INTO THE TRANSMITTER. Open
1723 Matthew Shriver BLDG - CEILING DAMAGE ABOVE 13.8 CABLE TRAY Open
1724 Lisa Ristvedt Util-Power Plant-Bop Plc Open
1930 Randolph Larabee WG49447 - UTIL ENGINEERING FOR CITY OF AMES ELECTRIC EASEMENTS Open
1951 Wade Siskow WJ29797 - UTILITY LOCATES FOR STATION POWER IMPROVEMENTS Open
2082 Nicholas Kolbet Map B8, B9, B10 winding and bearing temperatures into S+. PLC will need to be modified to create modbus addresses first. Open
2174 Wade Siskow Utility Electrician Support for Station Power Project Open
2256 Lindsey Wanderscheid WG47685 - Contracted Services Open
2303 Lindsey Wanderscheid WJ02108 - ABB Upgrade - Engineer Time Open
2406 Lisa Ristvedt Util-Power Plant-Coal Boilers Natural Gas Conversion Open
2429 Joseph Mesner BLDG - PLANT CLEAN UP Open
2781 Matthew Shriver GB - FD FAN BEARING AND MOTOR WINDING TEMPERATURES NEED TO BE DISPLAYED ON THE DCS GRAPHICS AND RECORDED IN THE HISTORIAN. Open
2979 Caleb Barduson WH20189 - COMPLETE ARC FLASH STUDY ON ALL ELEC DIST SUBSTATIONS Open
3812 David Frost Dylan WD test review Assigned
3859 Michael McCurdy HTG PLANT - COAL YARD AND ASSOCIATED STREETS SWEEPING WITH STREET SWEEPER Open
3944 Wade Siskow WH19050 - DEVELOPING NEW SWITCHING/SAFETY PROCEDURES Open
7209 Lindsey Wanderscheid WH06781 - Contracted Services Open
7229 Lindsey Wanderscheid WH06784 - Miscellaneous Open
19080 Lindsey Wanderscheid WJ03019 - CFB Conversion - Engineering Support Open
19083 Lindsey Wanderscheid WH45272 - Miscellaneous Open
24681 Lindsey Wanderscheid WJ35543 - Contracted Services Open
24684 Lindsey Wanderscheid WJ35541 - Builders Risk Open
24691 Lindsey Wanderscheid WJ34958 - Miscellaneous Open
24692 Lindsey Wanderscheid WJ34955 - Contracted Services Open
96288 Jonathon Fleming WJ39399 - 10year PM FOR GAS BOILER UPS Open
96289 Jonathon Fleming WJ23793 - ENERGY TEAM Open
97395 James Farrell Feed water pump #1, throttle steam valve is too hard to open or close. Cannot get it fully open and cannot get it fully shut. you can only get a couple turns on it and have to use a crows foot to accomplish that. Open
97699 Linda Irlmeier Utility Engineer - Power Plant Condenser Water Piping Repairs Open
97899 Lee Mason Add 1" Stainless Steel Piping from the RO permeate to storage back to each RO skid Open
98180 Michael McCurdy HTG PLANT - SANITATION EFFORTS FOR TOURS Open
99203 Lee Mason Replace 4007 board and the outside A/V that was damaged Open
99736 Lee Mason Stormwater sampling analysis Open
103606 David Nobiling BLDG - BUILD PLATFORM TO ACCESS EXHAUST DE-SUPERHEATER STEAM VALVE THAT COME OFF OF FEED WATER PUMP #4. Open
109206 Michael McCurdy B2 - PCI to supply truck and driver to provide bed material for B2 start up (workorder needed for release) Open
113617 Lisa Ristvedt WJ24748 - Builders Risk-Phase 4 Open
113627 Caleb Barduson Breaker Testing & Coordination Open
114083 Wade Siskow Service portable generators. Open
114787 David Nobiling B8-AIT-902 INSTALL QUICK DISCONNECTS CONNECTORS ON THE O2 PROBE. Open
114834 Joedy Snyder B8-TCV-4186 - THE AIR TEMP ON THIS BOILER WAS 140 DEGREES WHEN OFF. WE CLOSED THE ISOLATON VALVE TO BRING TEMP DOWN. CAN WE GET THE AIR TEMP CONTROLER LOOKED AT BEFORE WE PUT THIS BOILER BACK ON LINE. Open
118533 Matthew Shriver FP - FIRE ALARM CONTROL PANEL HAS TROUBLE READING "1ST FLR CONTROL ROOM SOUTH EAST SMOKE DETECTOR – HEAD MISSING". Open
118534 Matthew Shriver FP - ANNUNCIATOR IN CONTROL ROOM DOESN'T DISPLAY THE LAST CHARACTER (RIGHT MOST ONE Open
123103 Randolph Larabee Purchase of ABB MicroScada System Hardware and Software for system upgrade Open
123385 Michael Olson Registration fees for 2021 electrical engineering conferences Open
127700 Caleb Barduson Vault Ladder Replacement Open
128269 Joedy Snyder TG3-CND-04 THERE IS A PRESSURE RELIEF VALVE ON PRIMARY SUCTION LINE TO AIR EJECTOR THAT IS LEAKING, LEAVING A PUDDLE ON THE BASEMENT FLOOR. Open
129438 Randolph Larabee Easement for CCG for south 16th Street fiber install Open
129503 Caleb Barduson Station Power Phase 1 - Signage Open
129832 Matthew Shriver EE - INSTALL EXTERNAL INVERTER BYPASS ON GAS BOILER BUILDING INVERTER TO ALLOW FOR COMPLETE ISOLATION OF INVERTER. Open
135320 Lee Mason 8 sample kits analysis for wastewater samples Open
136720 Gordon Woods CW - CIRCULATING WATER SYSTEM - WRAP MAIN PLANT LINES TO AID IN PRESERVATION OF THE PIPING Open
136730 Gordon Woods BLDG - BUILDING SYSTEMS - INSTALLATION OF SAFETY GATES ON SELECTED LADDERS Open
137156 Caleb Barduson WJ41059 - PARKING LOT 46 FEE Open
138105 Lee Mason Build up rock berm on storm water outfall to correct the washout and try to prevent this from happening again in the future. Completed
140023 Matthew Shriver TG5-P-08 - AUX OIL PUMP STEAM CONTROL VALVE LEAKS BY. Completed
140056 Matthew Shriver C3 - OIL LEAKING OUT OF OIL LIN ON SE CORNER OF MACHINE. Open
148605 Matthew Shriver EE - STATION POWER UPGRADE - PLANT SUPPORT Open
155570 Joseph Mesner CW-GR-03B - REPLACE GEARBOX ON COOLING TOWER FAN 3B. Completed
155602 Wade Siskow Purchase replacement PT fuses following November phase loss on Chiller 6A. Open
156411 Lee Mason Engineering design for steam valve access platform Open
156540 Michael McCurdy CH - E009723 VOLVO ENDLOADER REPAIRS BY HOUSEBY Open
156855 Randolph Larabee Purchase 4160 volt switchgear for Station Power Phase 4 project Open
158070 Lee Mason Ash sampling for permit renewal Open
159561 Lee Mason B1/2 - CONVERSION TO NATURAL GAS - ISU SUPPORT Open
165340 Gordon Woods TG-4 - PROJECT TO REMOVE ASBESTOS FROM THE UNIT IN PREPARATION FOR REMOVAL Open
170380 Roy Ball THE COOLING TOWER RETURN ISOLATION VALVE ON CHILLER # 2 UN THE BASEMENT UNDER THE STAIRS NEEDS REPLACED OR REPAIRED IF AN OUTAGE OCCURS AS IT IS VERY HARD TO OPEN OR CLOSE. Open
170723 Lisa Ristvedt Miscellaneous Open
171249 Gordon Woods TG6-GEN-01 - TG6 GENERATOR - REPLACE THE EXPANSION JOINTS ON THE AIR COOLING WATER LINES DURING THE NEXT SCHEDULED OUTAGE (SPRING 2023?) Open
173629 Gordon Woods C3 - REPLACE THE SOLENOID VALVE PURCHASED UNDER WORK ORDER WG10690. REQUIRED AN OUTAGE OF THE CHILLER WITH THE FREON REMOVED. Open
175798 Lindsey Wanderscheid Replace CEMS with new extractive system and analyzers Open
179951 Matthew Shriver CH-SILO-01 - REPLACE GASKET BETWEEN SILO AND FEEDER 3. INSPECT AREA OF SILO ABOVE FEEDERS 1 & 3 FOR CRACKS. Completed
181066 Matthew Shriver PP - SUPPLEMENTAL LABOR FOR APRIL 2022 Open
182687 Michael Olson High Voltage Electricians CFB Boiler Conversion Open
183221 Apollo Betsworth C - REMOVE AND CAP OFF TG4 & REDUNDANT DEMIN WATER SUPPLY LINES TO DA TANKS Open
184285 Lee Mason Support CFB Conversion project including LOTO, etc. Open
190253 Gordon Woods BLDG - THE SHOWER HEADS FOR THE SAFETY SHOWER WEST OF THE WATER PLANT (OUTSIDE) & THE TRUCK ALLEY NORTH OF THE CFB BUILDING ARE BOTH DAMAGED AND NEED TO BE REPLACED. ANY QUESTION CONTACT GORDON. Completed
190389 Michael McCurdy B2 - PCI TO SUPPLY TRUCK AND DRIVER TO PROVIDE BED MATERIAL FOR B2 START-UP (WORKORDER NEEDED FOR RELEASE) Open
191122 Larry Battazzi TG3 - WHEN SWITCHING FROM MANUAL TO AUTO ON TURNIG GEAR OIL PUMP THE GENERATOR TRIPED Open
191344 Matthew Shriver CR - INSTALL VFDS ON CR PUMPS Open
191358 Matthew Shriver B1/2 - CONVERSION TO NATURAL GAS - REFURBISHMENT OF 480V BREAKERS Open
191575 Michael Olson HK Scholz Power Plant-Station Power SCADA upgrade testing support Open
192639 Joedy Snyder S-TP-90-164 - STEAM TRAP IN BOILER BASEMNET IS MALFUNCTIONING, CAUSED WATER HAMMER IN #90 STEAM. Y STRAINER CRACKED AND BUCKET UNDER IT. Open
196167 Gordon Woods CW - INSPECTION AND REPAIR OF GATE GEAR OPERATOR. Completed
196248 Caleb Barduson Phase 4 - Plant Utility Lockout Support Open
196732 Caleb Barduson Phase 4 - Misc Plant Assistance Open
197220 Michael Olson CP002466 Station Power Phase 4 - Hitachi MicroSCADA upgrade Open
197477 Caleb Barduson Station Power Phase 4 - E&I Tech Assistance Open
200219 FPM Service Desk FY23 Up - Miscellaneous Supplies For Plant Maintenance Open
205943 Roy Ball WT-F-03. THE BACKWASH INLET VALVE DOES NOT APPEAR TO BE OPENING ALL THE WAY THUS RESTRICTING THE BACKWASH FLOW TO BED #3. Completed
207967 Ben Young FY 2023 Metering & Meter Billing FY23 Open
210206 Lisa Ristvedt Utilities-Power Plant-Chiller 1 Turbine Overhaul FY23 Open
210207 Lisa Ristvedt Contracted Services Open
210216 Lindsey Wanderscheid Chemical Usage Reconciliation FY22 Open
213693 Ben Young Irrigation Meter Install/Removal. Create W/O for next season notification. Lied Rec & Johnny Majors Field require physical install, Inactive/Active & On/Off toggle. Jack Trice only requires Inactive/Active & On/Off toggle. Open
214095 James Farrell 101D-2 - OPERATOR CONTROL ROOM - AFTER DISCUSSION AMONG THE OTHER OPERATORS, WE ARE WONDERING IF IT WOULD BE POSSIBLE TO HAVE CEILING FANS INSTALLED IN THE CONTROL ROOM TO HELP CIRCULATE THE AIR. PLEASE.. THANK YOU OPERATION STAFF Open
215500 Michael Olson Purchase miscellaneous equipment Open
215595 Matthew Shriver C1 - ISU - TURB OVERHAUL - MECHANICAL SUPPORT Open
216147 Joseph Mesner C1-P-04-M - OPEN DOOR ON SPEED CONTROL ACUATOR AND CHECK GEAR BUSHING ON WORM DRIVE. THIS GEAR BUSHING WAS REPLACED LAST YEAR AND MADE BY AUTO INDUSTRIAL. ORIGINAL EQUIPMENT WAS MADE OF SOME TYPE OF PLASTIC AND IT WAS RE-BUILT WITH BRASS. Open
216632 Mark Kruse CFB Project Emissions Permitting FY23 Open
217201 Ben Young Replace differential pressure switches for CW & CHW. Open
218289 Matthew Shriver B1 - PERFORM CHEMICAL CLEAN Open
218708 Lee Mason Parking spots in lot 68 for 20 construction workers. Open
223052 Lee Mason Mail out 2 electrical breakers. Open
223637 Gordon Woods BFWP2 -COMPLETION OF REPAIRS ON THE UNIT FOLLOWING OVERHAUL Completed
224701 Joseph Mesner BLDG - CHECK FOR AIR LEAKS AND REPAIR. Open
224702 Joseph Mesner BLDG - CHECK FOR AIR LEAKS AND REPAIR. Open
224818 Jason Nord CW LINE ON MEZZANINE NEEDS INSULATION REPAIRED. Open
226296 Lisa Ristvedt Utilities-Power Plant-Chiller 5 Compressor Overhaul FY23 Open
230169 Lee Mason Yearly Hach service contract for RO Hach analyzer. Open
230484 Joedy Snyder S-400/90 - THE 400/90 DESUP CONTROL VALVE IS LEAKING A SIGNIFICANT AMOUNT OF STEAM BETWEEN THE BODY AND BONNET. THE TWO ISOLATION VALVE ON THE STEAM INLET SIDE ARE LEAKING AROUND STEM AND PACKING. SHOULD HAVE THIS UNIT REPAIRED BEFORE WINTER COMES AND WE NEED TO PUT THIS ON Open
231649 Matthew Shriver TG4 - DISCONNECT LUBE OIL CONNECTIONS TO THE UNIT AND DISCONNECT THE FIRE PROTECTION TO THE PURIFIER AND LUBE OIL TANK. Open
232299 James Farrell B1 - V-152C - BOILER 1 DRUM VENT VALVE (V-152C) IS BROKEN. WHEN YOU OPEN IT THE VALVE SEAT MUST BE DISCONNECTED BECAUSE WE GET NO STEAM OUT OF THE VENT ON THE ROOF. FOUND BY DANIEL APPAU Open
238959 Matthew Shriver DW - REPLACE DEMIN MAKEUP CONTROL VALVE AND ACTUATOR. NEW ONE SHOULD HAVE POSITIONER WITH FEEDBACK. Open
238996 Lee Mason POWER TESTING Open
239033 Matthew Shriver CR-P-02AB - VIBRATION ANALYSIS INDICATED THE BASES FOR THESE PUMPS IS NOT OF ADEQUATE MASS. Open
239045 Matthew Shriver B1 - INSTALL DSH BLOCK VALVE BEFORE CONTROL VALVE. THIS BLOCK VALVE SHOULD BE CONTROLLED BY THE BOILER PLC AND OPEN WHEN DESUPERHEATER OUT TEMPERATURE REACHES 740F. Open
239046 Matthew Shriver B2 - INSTALL DSH BLOCK VALVE BEFORE CONTROL VALVE. THIS BLOCK VALVE SHOULD BE CONTROLLED BY THE BOILER PLC AND OPEN WHEN DESUPERHEATER OUT TEMPERATURE REACHES 740F. Open
239093 James Farrell BLDG - ROOF DRAIN PIPE ON 5TH LEVEL HAS A HOLE IN IT. FOUND BY AARON MARCOMB Open
239559 Caleb Barduson Phase 4 - Furniture & Chairs Completed
239601 Melissa Warg FDC DESIGN PROFESSIONALS Open
240070 Michael McCurdy B1 - ADDRESS LEAKING MANWAY GASKET AND POSSIBLE CAUSES. THE SURFACE OF THE MAWAY AND THE MATING SURFACE OF THE DRUM MAY NEED MACHINED. ENSURE THE GASKETS ARE SIZED CORRECTLY. THE NORTH MANWAY GASKET ON B1 NEEDS ADDRESSED AND THE SOUTH GASKET MAY BE THE SAME. JAMES SMITH WITH LOCKE AMI SAYS THEY HAVE PEIPLE THAT DO THIS. WORK TO BE DONE DURING TH EDUAL BOILER OUTAGE SPRING OF 2023 Open
241337 Matthew Shriver TG3 - GENERATOR VAR CONTROL DOES NOT SEEM STABLE. Open
245875 Joseph Mesner CR - INVESTIGATE POSSIBLE CONDENSATE LEAKS IN THE PLANT. Open
245931 David Nobiling TG6-PCV-116 - TURBINE GLAND SEAL PRESSURE CONTROL VALVE POSITIONER HAS AN AIR LEAK AROUND THE BODY OF THE POSITIONER. Open
245952 Michael Olson ISU Transportation Services rental car for trip to HK Scholz Open
246299 Joseph Mesner S - HEADER VALVE FOR TG3 LEAKS BY STEAM AND IS ALSO LEAKING STEAM OUT OF THE PACKING. INVESTIGATE SOLUTION TO REPLACE VALVE OR HAVE VALVE RE-BUILT. Open
246302 Joseph Mesner S - TG5 STEAM HEADER VALVE LEAKS BY. INVESTIGATE REPLACING VALVE OR HAVING VALVE RE-BUILT. CHANGE OUT BY-PASS VALVES ALSO. Open
246490 Gordon Woods B2 -INSPECT & CLEAN SHOT SAFETY VALVE. VENDOR WILL PICK UP TO TEST & INSPECT SAFTY. OBJECTIVE IS TO HAVE THE FLANGE GASKET SEAL AND PREVEN STEAM LEAK. Completed
247128 Lee Mason Ductwork repair found during Boiler 1 conversion project. Open
247959 Matthew Shriver WW - THERE IS A WELL WATER LINE BREAK NEAR THE CONTRACTORS GRAVEL PARKING LOT. Open
248285 Matthew Shriver B1 - DEMO SOOTBLOWING SYSTEM FROM B1. DISCONNECT STEAM FEED LINE FROM THE BOILER DURING SPRING 2022 OUTAGE REMOVE SOOTBLOWERS AND PLUG HOLES IN BOILER. Open
251040 Matthew Shriver B2 - DEMO SOOTBLOWING SYSTEM FROM B2. DISCONNECT STEAM FEED LINE FROM THE BOILER DURING SPRING 2022 OUTAGE. REMOVE SOOTBLOWERS AND PLUG HOLES IN BOILER. Open
251185 Matthew Shriver B1/2 - INSPECT/REPAIR COMMON DUCT WORK FROM ID FAN OUTLETS TO AND INCLUDING THE STACK. Open
251915 Gordon Woods MH -COAL - REPAIRS TO BEND AND TORN BUCKETS ON THE NORTH LEG. Completed
252564 Joseph Mesner C1-P-04 - INSPECT CHILLED WATER PUMP AND CHANGE VALVE ON OUTLET SIDE OF PUMP THAT SUPPLIES CAMPUS. Open
252699 Joseph Mesner S - CAP OFF STEAM AND CONDENSATE GOING TO PENTHOUSE ON THE ROOF OF THE 6TH LEVEL. THIS SHOULD BE DONE SOMETIME THIS SPRING WHEN THE HOUSE HEAT IS SHUT OFF. Open
254528 Michael Mayfield C1 - CONDENSER ON CHILLER #1 HAS HOLE THAT NEEDS WELDED. Open
258134 Larry Battazzi B8-V-268- MANUAL VALVE BELOW STARTUP VENT HAS A PACKING LEAK Open
258342 Gordon Woods B2-CLEAN OUT ALL ASH, BED MATERIAL & LIMESTONE FROM THE UNIT IN PREPERATION FOR CONVERSION TO GAS Completed
258405 Matthew Shriver BD-TK-02 - DISCHARGE OF THIS TANK IS COLD. SUSPECT THERE IS AN ISSUE WITH THE SERVICE WATER CONTROL THAT IS SUPPOSED TO CONTROL THE TEMPERATURE OF THE DISCHARGE TO AROUND 100F. Completed
258645 Joseph Mesner C1-CND-06 - ADDRESS PINHOLE LEAKS ON C1 STEAM CONDENSOR. Open
258696 Joseph Mesner CW - INVESTIGATE LONG TERM SOLUTION TO DETERIORATING STEAM CONDENSORS. SPECIFICALLY CONDENSORS ON OUR TURBINE DRIVEN EQUIPMENT. Open
258979 Larry Battazzi B9-BLOWDOWN LEAK ON MAIN BLOWDOWN LINE Open
259222 Joseph Mesner B9 - INSTALL REMOTE GREASE LINES. Open
259317 Gordon Woods FP- REMOVED NEWER ISOLATIONG VALVE FROM THE DELUGE STATION ON TG4. CAN REPLACE THE PLUG IN TYPE ON OTHER STATIONS (TG3 OR CHILLERS 1 & 2). WILL REQUIRE OUTAGE OF FIRE SYSTEM TO INSTALL AND COORDINATION WITH THE E & I STAFF FOR WIRING. LO PRIORITY BACK LOG WORK. Open
259362 Ty Grady B8 - REINSULATE CONDENSATE LINES OFF OF AIR HEATER Open
259531 Joseph Mesner B8,B9,B10 - INSTALL LIFTING BEAMS TO TROLLY SAFETY VALVES OFF THE GAS BOILER DRUMS. ENGINEERING OF BEAMS WILL NEED TO BE DONE PRIOR TO INSTALLATION. Open
260236 Travis Van Dyke Engineering support and materials for new fiber to the Power Plant Open
260593 Matthew Shriver S - INSTALL UNIT HEATER IN THE CFB BASEMENT AREA BY THE FW CHEMICAL INJECTION AREA Open
265247 Gordon Woods S-TP-90-71 FOR UH 32 LOCATED ON THE NORTH WALL HAS A LEAK IN THE PACKING ON THE STEAM SIDE VALVE (NO TAG NUMBERS YET). PACK THE VALVE IT POSSIBLE OR REPLACE IF NECESSARY. Open
265285 James Farrell B9 - THE WARMING COIL CONDENSATE SIDE HAS A LEAK. Open
265303 Joseph Mesner CW-FAN - PERFORM ALIGNMENTS ON COOLING TOWER FANS Open
266110 Larry Battazzi B9 - WEST SAFTEY LEAKING ON DRUM A LITTLE Open
266338 Gordon Woods B2 - SUPERHEATER TUBE LEAK FOUND DURING CLEANING OF THE UNIT. NEED TO HAVE WALDINGER IN TO WELD REPAIR THE AREA. Open
266431 Matthew Shriver B1 - FLUE GAS DUCT PRESSURES (B1-PT-470, B1-PT-470C, B1-PT-471, B1-PT-472, AND B1-PT-460) SHOULD ALL BE READING NEGATIVE INH20. THEY SHOULD GET MORE NEGATIVE AS THEY GET CLOSER TO THE ID FAN INLET. Open
266705 Gordon Woods CW-COOLING TOWER BAYS 1 &2 NEED TO ADJUST OR DIGHTEN THE PVC COLUMN ON THE LEVEL DETECTOR TO KEEP IN FROM SLIPPING. NEEDS TO BE PERFORMED DURING ANNUAL OUTAGE OF BAYS 1 & 2 TO PROVIDE ACCESS TO THE FASTNERS. CONSULT WITH DAVE NOBILING IF YOU HAVE ANY QUESTIONS Open
267016 Calvin Egger MAIN POWER PLANT, MAIN COOLING TOWER, CELL 3 CIRC WATER INLET TEMP LOWER THAN THE OTHER TEMPS. Open
267017 Calvin Egger CW - CT CELL 7 INLET TEMP READS 0 (ZERO) DEGREES. Open
267124 Matthew Shriver ISU - CAMPUS TITLE V PERMIT UPDATE Open
267251 Matthew Shriver C3 - C3 CHW PUMP SPEED CONTROLLER MINIMUM SPEED LIGHT IS NOT WORKING. Open
267306 Gordon Woods CW-COOLING TOWER BAY 7 CONCRETE WALL IS DETERIORATING AND NEEDS REPAIRED. WILL REQUIRE CONCRETE CONTACTOR AND TOWER OUTAGE Open
268453 Brian Thilges PP- EPOXY TOWER SUMP PIT AND TROUGH IN TOWER BUILDING Open
268573 Lee Mason WT – Water Treatment Plant Tank Inspections Open
272257 Brian Thilges PP-FW- ADD 150 PSI RELIEF VALVE TO FW CHEMICAL CARRIER LINE Open
272399 Gordon Woods C/CR - ORDER TAGS & FASTNERS FOR LABELING THE SYSTEM Open
272740 Brian Thilges VM - CW - GET RUBBER LINER THE SAME AS IN THE BLEACH CONTAINMENT AT THE NCWP. WILL INSTALL WINTER OF 23/24. Open
272815 Gordon Woods CH - INSPECTION OF THE SCALE FOR PROPER OPERATIONS Open
273032 Michael Olson Purchase transformer oil in 55 gallon drum Open
273365 Joedy Snyder PD-PU - SUMP PIT PUMP BY TG#3, WEST PUMP HAS A BAD PUMP OR COUPLING. ITS NEEDS SOME SERIOUS ATTENTION Completed
274101 Aaron Marcomb TG5-TU-01 GENERATOR LOW PRESSURE RACK IS UNRESPONSIVE Open
275033 Gordon Woods S-INSPECTION AND REPAIR OF THE POWEL VALVE ON THE 400/90 STATION. OUTAGE PROJECTED AUGUST 7TH 2023. VENDOR WILL OPEN AND INSPECT THEN PROVIDE REPAIR COSTS. Open
275061 Daniel Appau Boiler : Drain line out of Steam Flow Transmitter : B8-FIT-802 on east side of the boiler leaks droplets of condensate. Perhaps drain line valve needs replacement. Open
275094 Caleb Barduson Phase 4 - JCI Design Open
279164 Lisa Ristvedt Utilities-Power Plant-Boiler Makeup Reverse Osmosis 4 Installation Open
279168 Lisa Ristvedt Miscellaneous Purchases Open
279171 Lisa Ristvedt Miscellaneous Open
279363 David Nobiling EE - SEVERAL LIGHTS ON THE 2ND LEVEL AREAS, ON THE NORTH SIDE OF THE FIRING AISLE Completed
279601 Ben Young Remove insulation around Service Water meter, test accuracy with portable flow meter, replace if needed with Flexim unit. Open
279796 Scott Valentine EE - MANY LIGHTS ARE DIM, OUT, OR FLICKERING THOUGHT THE CFB AREA. FLOORS 6-10 Open
279958 Gordon Woods BOILER MAINTENANCE - DISPOSAL OF ALL STOCK PARTS WHICH SUPPORTED THE COAL OPERATION OF THE PLANT. Open
279959 Wade Siskow Utility locates for CFB Boiler conversion. Open
280152 Joseph Mesner S - RE-BUILD TG5 HEADER VALVE. LINE UP ALLIED VALVE TO DO THIS WORK DURING HEADER #4 OUTAGE Open
280153 Gordon Woods TG5 -THE HP RACK IS BINDING. INSPECTION DISPLAYED WORN PARTS AND LACK OF LUBRICATION. ORDER REPLACEMENT PARTS AND INSTALL THE SAME AT THE NEXT OUTAGE WINDOW. Open
280165 Joseph Mesner S - REPLACE VALVES AND ADD DRAIN VALVE BETWEEN THE TWO VALVES ON TG5 HEADER VALVE. Open
280169 Joseph Mesner S - REPLACE VALVES S-V-113, S-V-116, S-V-136. ALL ARE LOCATED ON HEADER 4. Open
280252 Gordon Woods TG5 -THE LP RACK IS BINDING. INSPECTION DISPLAYED WORN PARTS AND LACK OF LUBRICATION. ORDER REPLACEMENT PARTS AND INSTALL THE SAME AT THE NEXT OUTAGE WINDOW. Open
280574 Larry Battazzi TG3 - TURING GEAR WILL NOT ENGAGE FOUND IT OFF TONIITE Completed
280593 Joseph Mesner TG5 - TURNING GEAR WILL NOT ENGAGE. Open
280664 Matthew Shriver B10-FIT-810 - CHECK THE CALIBRATION OF B10 GAS FLOW METER. IT IS CURRENTLY READING 6000+ WITH THE BOILER OFFLINE. Open
280666 Wade Siskow UC Shop reconstruction following Station Power electrical room installation. Open
280716 Ben Young Replace Service Water Meter. Remove chart recorder, gauges, green cabinet, and associated equipment for current transmitter and green enclosure. Install conduit/wiring for 4-20mA loop back to BOP cabinet to be terminated at available AI. Provide 120VAC to power new transmitter. Reinsulate piping once complete to allow for servicing of the installed unit. Coordinate with Ben Young Open
280772 Jason Nord TG5 - TURNING GEAR MOTOR LEADS NEED TO BE REWIRED. THEY ARE OXIDIZED,BRITTLE, AND FEEL VERY WEAK. Open
280800 Lee Mason Utilities-Power Plant-Boiler Makeup Reverse Osmosis 4 Installation Engineering Support Open
280806 Lee Mason Utilities-Power Plant-Boiler Makeup Reverse Osmosis 4 Installation Electrical and Instrumentation Installation and Support Open
280808 Lee Mason Utilities-Power Plant-Boiler Makeup Reverse Osmosis 4 Installation Mechanical Installation and Support Open
280988 Michael Olson HVBC equipment purchase from Material Stores. Contractor will reimburse equipment. Open
281411 Larry Battazzi LIGHTS ABOVE AND ARROUND THE CHILLER BAY ARE MISSING OR BURNED OUT Materials-Awaiting
281470 Lee Mason Support CFB Conversion Project Demo Open
282353 Larry Battazzi C1 - WEST BEARING OIL ON PUMP LEAKING AND NOT VISIBLE Open
282501 Michael McCurdy CH - perform annual coal inventory survey. Work to be done by Snyder and Associates Open
282534 Larry Battazzi SW-P-02 - LOT OF WATER OUT OF BEARING HUBS Open
282547 Larry Battazzi C1 - NEED TEST BUTTON FOR ALARM LIGHTS Open
282550 Wade Siskow Development and execution of Utilities High Voltage Thermal-Imaging program. Program will involve the assessment of all applicable HV switchgear, transformers, terminations, etc... Open
286176 Caleb Barduson Repair leaking valve on chilled water line that runs outside of Power Plant offices on second floor mezzanine. Open
286661 Gordon Woods TRAINING - CONTRACT WITH WOS FOR WELDING TESTING Completed
286732 Lee Mason Title V DNR Fee for Operating Permit Open
286939 John Holland B1-SH - SUSPISIOUS STEAM LEAK UNDER SKIRTING SE CORNER BETWEEN LEVEL 6 AND LEVEL 8. PRIMARY SH INLET DRAIN IN VECINITY MIGHT BE CULPRIT. VIDEO ON CHIEF PHONE. Completed
287417 Lee Mason Service Water Pump Replacement Project Engineering Services Indefinite Scope Release Open
287585 Gordon Woods B1 - REPAIR A LEAK IN THE PENTHOUSE OF THE BOILER. Open
287616 Joedy Snyder B1-ST - STEAM DRUM LEVEL INDICATER NEEDS REPLACED ( SOUTH SIDE ) Open
288000 Shane England Repair Chop Saw # 10 Assigned
288052 FPM Service Desk FY24 Electrician Apprentice Abc Classes - Nco Open
288054 FPM Service Desk FY24 Campus Substations Electrical Maintenance Open
288056 FPM Service Desk FY24 Sampling/Testing Of Oil From Electrical Equipment Open
288057 FPM Service Desk FY24 Paint & Flags For Utility Locates Open
288059 FPM Service Desk FY24 Remove Weeds Growing Into Electrical Equipment Open
288061 FPM Service Desk FY24 Respirators For Uc (Distribution Electrical) Open
288062 FPM Service Desk FY24 Testing Of Rubber Gloves, Blankets, & Hot Sticks Open
288063 FPM Service Desk FY24 Sidewalk Lighting Maintenance Open
288064 FPM Service Desk FY24 Utility Locates For Utility-Elect Distribution Open
288069 FPM Service Desk FY24 Electrical Distribution Engineering & Drafting Open
288070 FPM Service Desk FY24 Chw Distribution Engineering Open
288071 FPM Service Desk FY24 Electrical Distribution Management Services Open
288072 FPM Service Desk FY24 Electrical System Engineering Open
288073 FPM Service Desk FY24 Gas Distribution Engineering Open
288074 FPM Service Desk FY24 Mechanical Distribution Management Services Open
288075 FPM Service Desk FY24 Meter Billing Engineering Open
288077 FPM Service Desk FY24 Sanitary Sewer Agreement Engineering Open
288078 FPM Service Desk FY24 Sanitary Sewer Engineering Open
288080 FPM Service Desk FY24 Utility Engineering Management Services Open
288081 FPM Service Desk FY24 Steam Distribution Engineering Open
288082 FPM Service Desk FY24 Storm Sewers Engineering Open
288083 FPM Service Desk FY24 Utility Maps & Drafting Open
288084 FPM Service Desk FY24 Water Distribution Engineering Open
288085 FPM Service Desk FY24 Water Regulation Engineering Open
288086 FPM Service Desk FY24 Water Agreement Engineering Open
288087 FPM Service Desk FY24 Abb System Support Open
288089 FPM Service Desk FY24 Util - Boiler Operating Inspections/Certificate Open
288090 FPM Service Desk FY24 Dcs Database & Cad Maintenance Open
288091 FPM Service Desk FY24 Dcs Graphics Development And Maintenance Open
288092 FPM Service Desk FY24 Dcs Network & Hardware Maintenance Open
288093 FPM Service Desk FY24 Dcs Server And Client Maintenance Open
288094 FPM Service Desk FY24 Up - E&I & Electrician Tools Open
288095 FPM Service Desk FY24 Za-Maintenance Of Fire Extinguishers In Heating Plant Open
288099 FPM Service Desk FY24 Up - Miscellaneous Supplies For Plant Maintenance Open
288100 FPM Service Desk FY24 Performance Engineering Open
288101 FPM Service Desk FY24 Plant Mgmt Services Open
288102 FPM Service Desk FY24 Plc & Hmi Network & Hardware Open
288103 FPM Service Desk FY24 Plant Network & Hardware Open
288104 FPM Service Desk FY24 Plc Hmi Graphic & Opc Maintenance Open
288105 FPM Service Desk FY24 Plc Configuration Maintenance Open
288106 FPM Service Desk FY24 Power Plant Water Testing Open
288107 FPM Service Desk FY24 Pp - Title V Checks Open
288108 FPM Service Desk FY24 Pp - Lubrication Rounds Open
288109 FPM Service Desk FY24 Up - Purchase Of Misc Small Tools For Plant Maint.(Up) Open
288110 FPM Service Desk FY24 Production Reporting Open
288112 FPM Service Desk FY24 Remote Plant Operators Tools Open
288113 FPM Service Desk FY24 Up - Repair Of Shop Tools For Plant Maintenance Open
288114 FPM Service Desk FY24 Shoes, Glasses And Respirators For Up (Utility Plant Maintenance Open
288116 FPM Service Desk FY24 Shop Piping Supplies Open
288117 FPM Service Desk FY24 Testing Of E & I Tech Electrical Gloves Open
288118 FPM Service Desk FY24 Tool Box I (Jerry Schumacher) Open
288119 FPM Service Desk FY24 Toolbox B (Jim Oberender) Open
288120 FPM Service Desk FY24 Toolbox A (Justin Travis) Open
288121 FPM Service Desk FY24 Toolbox C (Mike Lycke) Open
288122 FPM Service Desk FY24 Toolbox E (Shannon Doise) Open
288123 FPM Service Desk FY24 Toolbox F (Joe Mesner) Open
288124 FPM Service Desk FY24 Toolbox G (Doug Aldinger) Open
288125 FPM Service Desk FY24 Toolbox H (Ty Grady) Open
288126 FPM Service Desk FY24 Vibration Rounds In The Plant Open
288127 FPM Service Desk FY24 Welding Supplies (Gas Cylinders Rods) - W003217 Open
288128 FPM Service Desk FY24 TOOLBOX D (Operations) Open
288129 FPM Service Desk FY24 Water Testing Supplies Open
288130 FPM Service Desk FY24 - VM OPERATIONS Open
288131 FPM Service Desk FY24 - AS OPERATIONS Open
288132 FPM Service Desk FY24 CHW-F-01 - CHILLED WATER FILTER - FITER BAG PURCHASES Open
288133 FPM Service Desk FY24 - NC - OPERATIONS Open
288134 FPM Service Desk FY24 CEM SYSTEM OPACITY Open
288136 FPM Service Desk FY24 - OIL SAMPLE BOTTLES Open
288137 FPM Service Desk FY24 Sanitary Sewer Miscellaneous Work Open
288221 FPM Service Desk FY24 Maint/Repair Miller Welder (Trailer 9718) Open
288314 FPM Service Desk FY24 Snow Removal Power Plant Coal Yard Open
288368 FPM Service Desk FY24 Maintenance and Repair - TRUCK, 3/4 TON, UTILITY BODY - E009062 Open
288377 FPM Service Desk FY24 Maintenance and Repair - TRUCK, 3/4 TON W/ ELECTRIC LIFTGATE - E009115 Open
288379 FPM Service Desk FY24 Maintenance and Repair - FORKLIFT, 6000 LBS, LOW-PROFILE - E009114 Open
288380 FPM Service Desk FY24 Maintenance and Repair - LOADER, HL760XTD -9A ARTICULATED - E009120 Open
288382 FPM Service Desk FY24 Maintenance and Repair - TRUCK, 3/4 TON, UTILITY BODY - E009116 Open
288383 FPM Service Desk FY24 Maintenance and Repair - TRUCK, 1 TON, UTILITY BODY 4X4 - E009117 Open
288426 FPM Service Desk FY24 Maintenance and Repair - TRUCK, EXTENDED CAB COLORADO PICKUP - E009246 Open
288485 FPM Service Desk FY24 Maintenance and Repair - TRUCK, DUR-A-LIFT ARTICULATED TELESCOPIC AERIAL, 40 FT - E009382 Open
288540 FPM Service Desk FY24 Maintenance and Repair - LOADER, L120H ARTICULATED - E009723 Open
288568 FPM Service Desk FY24 Maintenance and Repair - SWEEPER 6 FT - E009755 Open
288569 FPM Service Desk FY24 Maintenance and Repair - BUCKET, HEAVY DUTY 74"""" - E009754 Open
288570 FPM Service Desk FY24 Maintenance and Repair - SKIDLOADER, 4-WHEEL DRIVE - E009753 Open
288572 FPM Service Desk FY24 Maintenance and Repair - BLADE, 6 FT SNOW - E009756 Open
288580 FPM Service Desk FY24 Maintenance and Repair - 8 FT SNOW PUSHER LOADER - E009770 Open
288753 FPM Service Desk FY24 POWER - SLA General Cleaning Open
288853 FPM Service Desk FY24 POWER - Supplies (SLA) Open
288877 FPM Service Desk FY24 Confined Space Monitor Maint-Utilities Production Open
288878 FPM Service Desk FY24 Confined Space Monitor Maint-Utilities Electrical Open
288881 FPM Service Desk FY24 Confined Space Monitor Maint-Utilities Mech Open
288893 FPM Service Desk FY24 PCB Items Disposal Costs Open
288989 FPM Service Desk FY24 - CH - COAL YARD AND ROAD SWEEPINGS FOR FISCAL 2023 Open
288996 FPM Service Desk FY24 Filters Lubrication Activities Open
288997 FPM Service Desk FY24 Compressor Warranty Activities Compressor 2 Open
288998 FPM Service Desk FY24 Compressor Warranty Activities Compressor 1 Open
288999 FPM Service Desk FY24 Compressor Warranty Activities Compressor 4 Open
289000 FPM Service Desk FY24 Compressor Warranty Activities Compressor 3 Open
289001 FPM Service Desk FY24 - PP - WEEKLY CA AND DW CHECKS Open
289002 FPM Service Desk FY24 - PP - UP SHOP PLANT CLEANUP Open
289037 FPM Service Desk FY24 COOLING TOWER WINTER MAINTENANCE Open
289822 Matthew Shriver EEC-BKR-730 - ERRONEOUSLY TRIPPED TWICE ON 6/14/23 AND ONCE ON 6/15/23. Open
290050 FPM Service Desk FY24 Air Emissions Testing Open
290054 FPM Service Desk FY24 Pollution Control System Engineering Open
290261 Gordon Woods QUARTERLY INSPECTION OF THE STATION UPS SYSTEM BY HUBILL Materials-Awaiting
290274 David Nobiling C2 - INSTALL AN UPDATED ANNUNCIATOR PANEL FOR THE COMPRESSOR AND TURBINE Open
290395 Matthew Shriver BOP PLC - REMOVE THE RE-ALARMING FEATURE ON THE ALARMS INITIATED IN THE BOP PLC WITH THE EXCEPTION OF THE CHLORINE DIOXIDE ALARM (LEAVE UNCHANGED). ALSO MODIFY THE HMI TO PUT THE MOST CURRENT ALARMS AT THE TOP (NOT THE BOTTOM) OF THE ALARM HISTORY. Open
290397 Matthew Shriver B8910 - INSTALL BOILER START/TRIP LIMIT SWITCH THAT MONITOR THE MANUAL VALVE (Bx-v-268) BELOW THE STARTUP VENT TO ENSURE IT IS OPEN DURING STARTUP OR RUN. THE PLC SHOULD BE PROGRAMMED TO TRIP THE BOILER IF THIS LIMIT SWITCH IS NOT INDICATING THE VALVE IS OPEN. Open
290398 Matthew Shriver CW - INSTALL MOISTURE SENSOR IN THE ACID CONTAINMENT PIT AT THE COOLING TOWER CHEMICAL BUILDING THAT WILL ALARM BACK AT THE CONTROL ROOM. Open
290452 FPM Service Desk FY24 Annual Maintenance for Emergency Power Generator - POWER - E025547 Open
290500 FPM Service Desk FY24 Maintenance and Repair - ELECTRIC ARTICULATING BOOM LIFT ABL1 - E049743 Open
290513 FPM Service Desk FY24 Vacuum Bag Disposal Open
290669 Larry Battazzi FW-V-194 - INLET VALVE TO FWP#2 LEAKS BY HAD TO ISOLATE VALVE ABOVE Open
290700 Gordon Woods UPS-INSPECTION - DC GROUP WILL BE IN TO INSPECT THE GAS BOILER BUILDING UPS. Completed
293214 Larry Battazzi B10 - BLOWDOWN PIPE LEAKING ON FRONT OF BOILER Completed
293635 David Nobiling B1-LT-530 - UPDATE/REPLACE OLD BOILER 1 DRUM LEVEL TRANSMITTER. On Hold
293643 Brian Thilges PP - ADD MOISTURE SENSOR TO WATER PLANT BLEACH STORAGE AREA FOR LEAK DETECTION. Open
294251 Larry Battazzi FW-01-P - CAN'T ISOLATE SUCTION ON PUMP Open
294951 russell manske PP- CONDENSATE POLISHER B BACKWASH VALVES LEAK BY ALLOWING SERVICE WATER INTO CONDENSATE. Open
295062 Gordon Woods BUILDING SYSTEMS - PURHASE OF SYSTEM TAGS FOR FY24. Open
295333 Jason Nord B-8,9,10 NG E-STOP. WE WOULD LIKE THIS TO ALARM TO CONTROL ROOM ANNUNCIATOR SCREEN. FO ALARM SHOULD ALSO COME IN. Open
295377 russell manske PP- CONDENSATE POLISHER C BACKWASH VALVES LEAK BY ALLOWING SERVICE WATER INTO CONDENSATE. Open
295499 David Nobiling FW-DA-02 - EAST DA TANK LEVEL HIGH AND LOW LEVEL SWITCHES NEED TO BE REPLACED AND REPIPED. Open
296757 Gordon Woods CW-P-07 - THERE IS A VIBRATION IN THE UNIT WHICH WE BELEIVE CAN BE ADDRESSED BY BALANCEING THE UNIT. Completed
296811 Larry Battazzi B10 - PLEASE CHECK O2 PROBE FALLING OUT AND TRIM VALVE AWFULLY LOW PERCENTAGE Open
300153 Calvin Egger WT- POLYMER PUMP DOESN'T REFILL TANK WHEN IT SHOULD. LOW POLYMER TANK ALARM DOES SOUND, AT WHICH TIME WE MANUALLY REFILL POLYMER TANK. MCCLAIN SAID HE TAPPED ON THE MANUAL-OFF-RUN METAL SWITCH BOX AND IT STARTED THE REFILL ONCE. I TRIED IT TWICE AND IT DIDN'T WORK FOR ME. Completed
300155 Calvin Egger LL - COOLING TOWER SOUTH SIDE STREET LAMP/LIGHT IS BURNING OUT. THE MIDDLE OF THE THREE RUNNING ALONG THE SOUTH SIDE OF THE COOLING TOWER. Open
300450 Calvin Egger LL - LIGHT NORTH OF POLISHERS, NEAR SERVICE WATER PUMPS AND BRINE TANK IN MAIN POWER PLANT BASEMENT IS OUT. Open
300471 Lee Mason Stack test dust analysis Open
300481 Lee Mason Boiler 8, 9 and 10 CEMDAS PC replacement Open
300502 Lee Mason Boiler 1 Conversion Emissions Compliance Plan Open
300548 Jason Nord REVIEW EXIT LIGHTS COMPLIANCE/RISK CHECK WITH EH&S Open
300585 Jason Nord REVIEW DISCUSSION/AFTER-ACTION FOR SAFETY COMMITTEE Open
300610 Jason Nord VERIFY ROOM AND SAFETY WALK ON OUTLOOK Completed
300998 Gordon Woods WT-TK-01 - SCHEDULE INTERNAL INSPECTION OF THE STORAGE TANK Open
301043 Larry Battazzi B1 - NORTH DOWNCOMMER DRAIN NEEDS REPLACED ALSO THE VALVES ARE LEAKING BY ASWELL Open
301044 Joedy Snyder FP-TROUBLE ALARM - 3RD FLOOR CFB NORTH WALL IN CONTINUIOUS ALARM , CALLED DAVE HE WILL BYPASS On Hold
301350 Brian Thilges CW - REPLACE ACID PUMP A AT COOLING TOWER BUILDING. WILL USE NEW STYLE GRONFOSS PUMP. ASSIGN TO JOE. Open
301576 Lee Mason Chemical cleaning on CFB boiler Open
301659 Gordon Woods FP- TRANSFORMER YARD NOZZLES, REMOVE AND CLEAN THE NOZZLES. ACTIVATE THE SYSTEM TO FLUSH LINES AND THEN REINSTALL THE NOZZLES. REPLACE THE CONSTANT VELOCITY BALL VALVE Open
301660 Lisa Ristvedt Utilities-Power Plant-Turbine Generator #6 Overhaul FY24 Open
301664 Lisa Ristvedt Contracted Services Open
301766 Gordon Woods FY24 - RO FILTERS & SUPPORT Open
301924 Joedy Snyder BLDG-S - TV MONITOR IN NEW GAS BOILER HOUSE IS FROZEN Open
302282 Gordon Woods BLDG -ANNUAL INSPECTION OF ALL HOIST & CRANES. Open
302358 Jason Nord GREEN BARN-ROOF LEAKS AROUND THE SKYLIGHTS. Open
302376 Jason Nord GREEN BARN-IN THE OLD BLOWER ROOM/PIPE FITTERS NEW STORAGE ROOM, THERE IS A LIGHT FIXTURE THAT NEEDS TO BE REPAIRED/REPLACED. Completed
302489 Gordon Woods BLDG - CRANES & HOIST INSPECTION OF THREE UNITS MISSED DURING ANNUAL. Open
302605 Michael Mayfield - FIRE ALARM - GEN #5 DELUDGE BAD CONTACT ALARM ON FIRE SYSTEM. On Hold
302675 Gordon Woods FP - FIRE PRTECTION HAVE AN ALARM ISSUE ON BOILER 10 IN THE GAS BOILER BUILDING TO BE ADDRESSED Completed
303064 Wade Siskow Purchase Husky cable cutter capable of cutting up to 750kcmil 133% EPR cable. Replacement of existing damaged tool. Open
303357 David Nobiling CW-CT-PUMPS 5 AND 6 - BOTH COOLING TOWER PUMPS TRIPPED AT THE SAME TIME (8/22 @ 10:20 pm). IN THE TRENDS PUMP 5 WAS RUNNING STEADY AROUND 315 AMPS AND PUMP 6 WAS RUNNING AROUND 345 AMPS BEFORE THEY BOTH TRIPPED. - MAYFIELD WAS ON DUTY - Open
303358 David Nobiling B1-HMI-DRUM LEVEL - ON THE B1 HMI, OPENING THE FEEDWATER FCV THERE IS AN ISSUE WITH THE "PV" AND "SP". THE "PV" WINDOW WILL ONLY DISPLAY THE "BCS DRUM LEVEL". IT WILL NOT SWITCH TO "BMS DRUM LEVEL" OR "BMS DRUM LEVEL AVERAGE". THE "SP" WINDOWN WAS DISPLAYING THE "BMS DRUM LEVEL AVERAGE". I DON'T RECALL SEEING IF IT CHANGED IF IT WAS CHANGED TO "BCS DRUM LEVEL" Open
303361 David Nobiling B1-HMI-DRUM LEVEL - IN THE "BMS 2oo3 DRUM LEVELS" SCREEN, ENABLEING THE "BMS DRUM LEVEL AVERAGE". DISCOVERED THAT THIS BLOCK IS NOT AVERAGING "A", "B", & "C" DRUM LEVEL TRANSMITTERS. THIS BLOCK IS ONLY LOOKING AT DRUM LEVEL "A" TRANSMITTER. Open
303373 David Nobiling B1-LCV-530 - ON B1 IN THE DCS GRAPHIC, OPENING THE FEEDWATER CONTROL VALVE CONTROL WINDOW. THE SPAN IN THIS WINDOW IS 12 TO -12 THIS NEEDS TO BE CHANGED TO 10 TO -10. Open
303456 Jason Nord B-8,9,10 - INVERTER WARNING FOR HIGH TEMP Completed
303618 Gordon Woods FO-ANNUAL TANK REGISTRATION FEES UTILITIES STANDING FY WORK ORDER IS 288089 Open
303736 Larry Battazzi AC UNIT ABOVE OLD CONTROL ROOM WATER DRAINING ON FLOOR PLEASE REROUTE Open
303844 n/a DPS 08/24/2023-Air Compressor Fire in the Plant Fire Department Responded. Assigned
304015 Charles Rodgers Survey and sampling in response to fire Open
304033 Craig Mitchell Tiles in the large shower are broken towards the bottom south side. Materials-Awaiting
304035 Craig Mitchell Sink has lost its airator Completed
304036 Craig Mitchell Sink airator has disappeared and needs a replacement. Completed
305182 Michael Mayfield - BLR#1 - MAIN STEAM LINE ON LEVEL #3 HAS A PIN SIZED HOLE UNDER THE INSOLATION ABOVE DRAIN VALVES. Open
305259 Michael Olson Utility Engineering-Power Plant Air Compressor #2 fire response Open
305325 Wade Siskow Provide utility locates for ISU farm properties at the Horticulture Farm and W. Riverside Drive. Open
305417 Lee Mason Install concrete housekeeping pad Open
305455 Gordon Woods CA SYSTEM - UPGRADE OF TEMPERATURE PROBES IN THE AIR COMPRESSORS FOLLOWING THE FIRE IN CA2 Open
305522 Wade Siskow Issue Request ID to absorb costs of missing inventory lighting fixtures (6746.2605 and 6746.2600) that have no historical record of being purchased. Inventory discrepancies likely occurred prior to FAMIS360. Open
308895 James Farrell WT-F-01 - WATER PLANT GRAVITY FILTER 1 (NORTH) - BACKWASH OUTLET VALVE LEAKING BY INTO THE TROUGH. DISCOVERD BY RUSTY WHITE Open
309243 Larry Battazzi BKR622 - AMPS NOT READING ON DCS PANNEL PINK QUESTION MARKS Open
309286 Gordon Woods BLDG-FP-ANNUAL INSPECTION OF THE MAIN PLANT. Open
309437 Mark Overton AIR DRIER 3 AUTOMATIC BLOWDOWN NOT WORKING Completed
309458 Matthew Shriver B8 - FD FAN BEARING TEMPERATURES ARE READING 100F WITH TEMPERATURE GUN BUT THE LOCAL PLC IS READING 160F AND 100F FOR BOTH FAN BEARINGS. Completed
309464 Matthew Shriver CA - DISABLE THE CLOSING OF THE AUTOMATIC VALVE THAT PROVIDES COOLING WATER TO AC1, AC3, AND AC4. DO NOT TAKE THE VALVE OUT OF THE PIPE. On Hold
309580 Brian Thilges B9 - CHECK SIDE STREAM BLOWDOWN FOR OBSTRUCTIONS. LET RPO'S KNOW WHEN DOING WORK. Open
309719 Calvin Egger DSH - DSH-AOV-138 - [ LP DESUP PRESS PV (DSH_PT_1) AS WRITTEN ON THE COMPUTER ] SAYS IT IS RUNNING AT 470PSIG, WITH THE SETPOINT AS 330PSIG, SHOULD BE 330PSIG. THE VALVE (DSH-AOV-138) WAS SHOWING GREEN, RED, AND PURPLE. THE VALVE POSITION WAS CYCLING FROM COMPLETELY SHUT TO BARELY OPEN. Open
309829 Michael Mayfield - VC - THE VACUUM SYSTEM MOTOR WAS 205 AFTER HE SHUT IT OFF NEEDS LOOKED INTO TO BE SURE IF SOMETHING IS WRONG. Open
309837 David Nobiling FW-AOV-176 - EAST DA TANK 2 LEVEL CONTROL VALVE WILL NOT CLOSE. Completed
309929 Roy Ball C-DA-02 THERE IS A LEAK ON THE EAST DA TANK THAT APPEARS TO BE NEAR THE BOTTOM OF THE TANK BUT NOT FOR SURE. JOE MESNER HAS LOOKED AT THE LEAK ALSO. IT SEEMS TO HAVE JUST STARTED TODAY. Open
310007 Michael Olson Station Power Phase 4-Baker Electric subcontractor extra labor hours Open
310075 Nicholas Kolbet TG6 - MD&A - Field Services - Base Work - 2024 Overhaul Open
310081 Larry Battazzi B1 - SOUTH SITE GLASS LEAKING AT UNION Open
310089 Joseph Mesner CA - CHANGE OUT BUNA GASKETS IN OIL PIPING TO UPGRADED VITON GASKETS. Open
310152 Gordon Woods UPS-Quarterly inspection by Vendor Completed
310213 Daniel Appau Concerning TG5: Basement floor at east of TG5- efforts to alleviate the constant floor wetness. 1. Please insulate chilled water pipes into and out of the 3D TRASER unit mounted on the column in this area. 2. Please if possible route the two casing drains into the drain pan. Open
310312 Gordon Woods FY24 SAMPLING AND TESTING OF ASBESTOS IN THE POWER PLANT Open
310504 Lee Mason Wire up heater in CFB basement in NW corner by chemical tanks from T cabinet on the East side of the CFB basement using spare breaker 19. Open
310507 Lee Mason Install electrical wiring for RO skid #4. Open
310535 Gordon Woods B2 -CLEANING OF THE ASH FROM THE BOILER IN PREPARTION FOR BOILER LITE OFF Open
310583 David Nobiling ASC-B2 CIRC. PUMP MOTOR TRIPPING THE BOILER. THE MOTOR OVER HEATING AND IS MAKING SOME ODD NOISE. Open
310650 Jason Nord WP - BASEMENT - NEED SHOUSEKEEPING. Open
310651 Jason Nord WP - BASEMENT - IT WAS SUGGESTED TO HAVE A SIGN PUT UP OUTSIDE INSULATOR'S ROOM LABELING IT AS A SEVEERE WEATHER SHELTER. Open
310662 NICHOLAS KOLBET TG6 - MD&A - Turb Shop - Base Work - 2024 Overhaul Open
310669 Craig Mitchell Paper towels dispenser lever has stopped working. Assigned
310696 Jason Nord WP - BASEMENT -THE SERVICE WATER DRAIN PIPE IS VERY CORRODED . IT IS SOUTH OF AC4. PLEASE CHECK ALL PIPES IN THIS BASEMENT AREA. Open
310699 Jason Nord WP - BASEMENT - THERE IS A HOT WATER LINE GOING TO ELECTRICIANS SINK THAT IS NOT INSULATED AND IS RESTING ON ELECTRICAL CONDUIT. Open
310702 Jason Nord WP - BASEMENT - THERE IS A SMOKE ALARM BY THE RO SYSTEM THAT HAS A BROKEN COVER AND BROKEN SUPPORTS. IT IS STILL WORKING HOWEVER. Open