18 | Lindsey Wanderscheid | WJ35696 - Utilities - Power Plant - Boiler Resiliency Study | Open |
1192 | Lisa Ristvedt | Util-Power Plant-Station Power Improvements | Open |
1204 | Kathy McKown | Util-Power Plant-Condenser Water Piping-Repairs | Open |
1220 | Randolph Larabee | WF22203 - UTIL ENGR-STATION POWER PROJECT | Open |
1232 | Randolph Larabee | WJ01588 - PURCHASE SWITCHGEAR AND TRANSFORMER FOR PHASE 1 SUBSTATION | Open |
1278 | Randolph Larabee | WH27187 - UC SHOP SUPPORT POWER PLANT STATION POWER STUDY | Open |
1284 | Joseph Mesner | WJ34051 DSH-P-03 - DESUP DISCHARGE CHECK VALVE(DSH-CV-150) LEAKS BY | Open |
1396 | Matthew Shriver | TG3 - AT NEXT OVERHAUL NEED TO DO SOME OIL MITIGATION EFFORTS 1. IN THE BOX WHERE THE ARRESTORS AND GENERATOR LEADS ARE THE BARRIER BOARDS NEED TO BE REMOVED AND CLEANED IN SOLVENT TANKS. 2. WHEN THE BARRIER BOARDS ARE INSTALLED, GORTEX AT LEAST 1/2" WIDE ON BARRIERS, THEN THEY NEED TO BE SILICONED AROUND THERE THE BUSS PENETRATES AND THERE THE MEET IN THE MIDDLE. ALSO NEED TO SILICONE THE UNDERSIDE OF THE WASHERS ON BOLTS AND AROUND THE ENDGE OF THE BARRIER BOARDS. | Open |
1513 | Gordon Woods | WJ12130 TG5 - CIRC WATER LINE FROM TOWER THROUGH THE WALL HAS CORROSION ON THE BOTTOM OF THE LINE. RAISING QUESTIONS OF THE THICKNESS OF THE PIPING WALL GIVENRECENT FAILURES ON THE LINE OUTSIDE OF THE PLANT. INVESTIGATE AND CORRECT ROOT ISSUE | Open |
1525 | Lisa Ristvedt | Util-Power Plant-External Stack Repairs | Open |
1683 | Lisa Ristvedt | Util-Power Plant-Abb Software And Scada Upgrades | Open |
1707 | Matthew Shriver | S - EAST AND WEST 6 LB PRESSURE TRANSMITTERSARE DIFFERENT THAN THE REST OF THE PTS ON SITE. BOTH THE EAST AND WEST 6 LB PRESSURE TRANSMITTERS PT-02 (EAST) & PT-03 (WEST) NEED TO BE REPLACED DUE TO A MANUFACTURE ABNORMALITY BUILT INTO THE TRANSMITTER. | Open |
1723 | Matthew Shriver | BLDG - CEILING DAMAGE ABOVE 13.8 CABLE TRAY | Open |
1724 | Lisa Ristvedt | Util-Power Plant-Bop Plc | Open |
1930 | Randolph Larabee | WG49447 - UTIL ENGINEERING FOR CITY OF AMES ELECTRIC EASEMENTS | Open |
1951 | Wade Siskow | WJ29797 - UTILITY LOCATES FOR STATION POWER IMPROVEMENTS | Open |
2082 | Nicholas Kolbet | Map B8, B9, B10 winding and bearing temperatures into S+. PLC will need to be modified to create modbus addresses first. | Open |
2174 | Wade Siskow | Utility Electrician Support for Station Power Project | Open |
2256 | Lindsey Wanderscheid | WG47685 - Contracted Services | Open |
2303 | Lindsey Wanderscheid | WJ02108 - ABB Upgrade - Engineer Time | Open |
2406 | Lisa Ristvedt | Util-Power Plant-Coal Boilers Natural Gas Conversion | Open |
2429 | Joseph Mesner | BLDG - PLANT CLEAN UP | Open |
2781 | Matthew Shriver | GB - FD FAN BEARING AND MOTOR WINDING TEMPERATURES NEED TO BE DISPLAYED ON THE DCS GRAPHICS AND RECORDED IN THE HISTORIAN. | Open |
2979 | Caleb Barduson | WH20189 - COMPLETE ARC FLASH STUDY ON ALL ELEC DIST SUBSTATIONS | Open |
3812 | David Frost | Dylan WD test review | Assigned |
3859 | Michael McCurdy | HTG PLANT - COAL YARD AND ASSOCIATED STREETS SWEEPING WITH STREET SWEEPER | Open |
3944 | Wade Siskow | WH19050 - DEVELOPING NEW SWITCHING/SAFETY PROCEDURES | Open |
7209 | Lindsey Wanderscheid | WH06781 - Contracted Services | Open |
7229 | Lindsey Wanderscheid | WH06784 - Miscellaneous | Open |
19080 | Lindsey Wanderscheid | WJ03019 - CFB Conversion - Engineering Support | Open |
19083 | Lindsey Wanderscheid | WH45272 - Miscellaneous | Open |
24681 | Lindsey Wanderscheid | WJ35543 - Contracted Services | Open |
24684 | Lindsey Wanderscheid | WJ35541 - Builders Risk | Open |
24691 | Lindsey Wanderscheid | WJ34958 - Miscellaneous | Open |
24692 | Lindsey Wanderscheid | WJ34955 - Contracted Services | Open |
96288 | Jonathon Fleming | WJ39399 - 10year PM FOR GAS BOILER UPS | Open |
96289 | Jonathon Fleming | WJ23793 - ENERGY TEAM | Open |
97395 | James Farrell | Feed water pump #1, throttle steam valve is too hard to open or close. Cannot get it fully open and cannot get it fully shut. you can only get a couple turns on it and have to use a crows foot to accomplish that. | Open |
97699 | Linda Irlmeier | Utility Engineer - Power Plant Condenser Water Piping Repairs | Open |
97899 | Lee Mason | Add 1" Stainless Steel Piping from the RO permeate to storage back to each RO skid | Open |
98180 | Michael McCurdy | HTG PLANT - SANITATION EFFORTS FOR TOURS | Open |
99203 | Lee Mason | Replace 4007 board and the outside A/V that was damaged | Open |
99736 | Lee Mason | Stormwater sampling analysis | Open |
103606 | David Nobiling | BLDG - BUILD PLATFORM TO ACCESS EXHAUST DE-SUPERHEATER STEAM VALVE THAT COME OFF OF FEED WATER PUMP #4. | Open |
109206 | Michael McCurdy | B2 - PCI to supply truck and driver to provide bed material for B2 start up (workorder needed for release) | Open |
113617 | Lisa Ristvedt | WJ24748 - Builders Risk-Phase 4 | Open |
113627 | Caleb Barduson | Breaker Testing & Coordination | Open |
114083 | Wade Siskow | Service portable generators. | Open |
114787 | David Nobiling | B8-AIT-902 INSTALL QUICK DISCONNECTS CONNECTORS ON THE O2 PROBE. | Open |
114834 | Joedy Snyder | B8-TCV-4186 - THE AIR TEMP ON THIS BOILER WAS 140 DEGREES WHEN OFF. WE CLOSED THE ISOLATON VALVE TO BRING TEMP DOWN. CAN WE GET THE AIR TEMP CONTROLER LOOKED AT BEFORE WE PUT THIS BOILER BACK ON LINE. | Open |
118533 | Matthew Shriver | FP - FIRE ALARM CONTROL PANEL HAS TROUBLE READING "1ST FLR CONTROL ROOM SOUTH EAST SMOKE DETECTOR – HEAD MISSING". | Open |
118534 | Matthew Shriver | FP - ANNUNCIATOR IN CONTROL ROOM DOESN'T DISPLAY THE LAST CHARACTER (RIGHT MOST ONE | Open |
123103 | Randolph Larabee | Purchase of ABB MicroScada System Hardware and Software for system upgrade | Open |
123385 | Michael Olson | Registration fees for 2021 electrical engineering conferences | Open |
127700 | Caleb Barduson | Vault Ladder Replacement | Open |
128269 | Joedy Snyder | TG3-CND-04 THERE IS A PRESSURE RELIEF VALVE ON PRIMARY SUCTION LINE TO AIR EJECTOR THAT IS LEAKING, LEAVING A PUDDLE ON THE BASEMENT FLOOR. | Open |
129438 | Randolph Larabee | Easement for CCG for south 16th Street fiber install | Open |
129503 | Caleb Barduson | Station Power Phase 1 - Signage | Open |
129832 | Matthew Shriver | EE - INSTALL EXTERNAL INVERTER BYPASS ON GAS BOILER BUILDING INVERTER TO ALLOW FOR COMPLETE ISOLATION OF INVERTER. | Open |
135320 | Lee Mason | 8 sample kits analysis for wastewater samples | Open |
136720 | Gordon Woods | CW - CIRCULATING WATER SYSTEM - WRAP MAIN PLANT LINES TO AID IN PRESERVATION OF THE PIPING | Open |
136730 | Gordon Woods | BLDG - BUILDING SYSTEMS - INSTALLATION OF SAFETY GATES ON SELECTED LADDERS | Open |
137156 | Caleb Barduson | WJ41059 - PARKING LOT 46 FEE | Open |
138105 | Lee Mason | Build up rock berm on storm water outfall to correct the washout and try to prevent this from happening again in the future. | Completed |
140023 | Matthew Shriver | TG5-P-08 - AUX OIL PUMP STEAM CONTROL VALVE LEAKS BY. | Completed |
140056 | Matthew Shriver | C3 - OIL LEAKING OUT OF OIL LIN ON SE CORNER OF MACHINE. | Open |
148605 | Matthew Shriver | EE - STATION POWER UPGRADE - PLANT SUPPORT | Open |
155570 | Joseph Mesner | CW-GR-03B - REPLACE GEARBOX ON COOLING TOWER FAN 3B. | Completed |
155602 | Wade Siskow | Purchase replacement PT fuses following November phase loss on Chiller 6A. | Open |
156411 | Lee Mason | Engineering design for steam valve access platform | Open |
156540 | Michael McCurdy | CH - E009723 VOLVO ENDLOADER REPAIRS BY HOUSEBY | Open |
156855 | Randolph Larabee | Purchase 4160 volt switchgear for Station Power Phase 4 project | Open |
158070 | Lee Mason | Ash sampling for permit renewal | Open |
159561 | Lee Mason | B1/2 - CONVERSION TO NATURAL GAS - ISU SUPPORT | Open |
165340 | Gordon Woods | TG-4 - PROJECT TO REMOVE ASBESTOS FROM THE UNIT IN PREPARATION FOR REMOVAL | Open |
170380 | Roy Ball | THE COOLING TOWER RETURN ISOLATION VALVE ON CHILLER # 2 UN THE BASEMENT UNDER THE STAIRS NEEDS REPLACED OR REPAIRED IF AN OUTAGE OCCURS AS IT IS VERY HARD TO OPEN OR CLOSE. | Open |
170723 | Lisa Ristvedt | Miscellaneous | Open |
171249 | Gordon Woods | TG6-GEN-01 - TG6 GENERATOR - REPLACE THE EXPANSION JOINTS ON THE AIR COOLING WATER LINES DURING THE NEXT SCHEDULED OUTAGE (SPRING 2023?) | Open |
173629 | Gordon Woods | C3 - REPLACE THE SOLENOID VALVE PURCHASED UNDER WORK ORDER WG10690. REQUIRED AN OUTAGE OF THE CHILLER WITH THE FREON REMOVED. | Open |
175798 | Lindsey Wanderscheid | Replace CEMS with new extractive system and analyzers | Open |
179951 | Matthew Shriver | CH-SILO-01 - REPLACE GASKET BETWEEN SILO AND FEEDER 3. INSPECT AREA OF SILO ABOVE FEEDERS 1 & 3 FOR CRACKS. | Completed |
181066 | Matthew Shriver | PP - SUPPLEMENTAL LABOR FOR APRIL 2022 | Open |
182687 | Michael Olson | High Voltage Electricians CFB Boiler Conversion | Open |
183221 | Apollo Betsworth | C - REMOVE AND CAP OFF TG4 & REDUNDANT DEMIN WATER SUPPLY LINES TO DA TANKS | Open |
184285 | Lee Mason | Support CFB Conversion project including LOTO, etc. | Open |
190253 | Gordon Woods | BLDG - THE SHOWER HEADS FOR THE SAFETY SHOWER WEST OF THE WATER PLANT (OUTSIDE) & THE TRUCK ALLEY NORTH OF THE CFB BUILDING ARE BOTH DAMAGED AND NEED TO BE REPLACED. ANY QUESTION CONTACT GORDON. | Completed |
190389 | Michael McCurdy | B2 - PCI TO SUPPLY TRUCK AND DRIVER TO PROVIDE BED MATERIAL FOR B2 START-UP (WORKORDER NEEDED FOR RELEASE) | Open |
191122 | Larry Battazzi | TG3 - WHEN SWITCHING FROM MANUAL TO AUTO ON TURNIG GEAR OIL PUMP THE GENERATOR TRIPED | Open |
191344 | Matthew Shriver | CR - INSTALL VFDS ON CR PUMPS | Open |
191358 | Matthew Shriver | B1/2 - CONVERSION TO NATURAL GAS - REFURBISHMENT OF 480V BREAKERS | Open |
191575 | Michael Olson | HK Scholz Power Plant-Station Power SCADA upgrade testing support | Open |
192639 | Joedy Snyder | S-TP-90-164 - STEAM TRAP IN BOILER BASEMNET IS MALFUNCTIONING, CAUSED WATER HAMMER IN #90 STEAM. Y STRAINER CRACKED AND BUCKET UNDER IT. | Open |
196167 | Gordon Woods | CW - INSPECTION AND REPAIR OF GATE GEAR OPERATOR. | Completed |
196248 | Caleb Barduson | Phase 4 - Plant Utility Lockout Support | Open |
196732 | Caleb Barduson | Phase 4 - Misc Plant Assistance | Open |
197220 | Michael Olson | CP002466 Station Power Phase 4 - Hitachi MicroSCADA upgrade | Open |
197477 | Caleb Barduson | Station Power Phase 4 - E&I Tech Assistance | Open |
200219 | FPM Service Desk | FY23 Up - Miscellaneous Supplies For Plant Maintenance | Open |
205943 | Roy Ball | WT-F-03. THE BACKWASH INLET VALVE DOES NOT APPEAR TO BE OPENING ALL THE WAY THUS RESTRICTING THE BACKWASH FLOW TO BED #3. | Completed |
207967 | Ben Young | FY 2023 Metering & Meter Billing FY23 | Open |
210206 | Lisa Ristvedt | Utilities-Power Plant-Chiller 1 Turbine Overhaul FY23 | Open |
210207 | Lisa Ristvedt | Contracted Services | Open |
210216 | Lindsey Wanderscheid | Chemical Usage Reconciliation FY22 | Open |
213693 | Ben Young | Irrigation Meter Install/Removal. Create W/O for next season notification. Lied Rec & Johnny Majors Field require physical install, Inactive/Active & On/Off toggle. Jack Trice only requires Inactive/Active & On/Off toggle. | Open |
214095 | James Farrell | 101D-2 - OPERATOR CONTROL ROOM - AFTER DISCUSSION AMONG THE OTHER OPERATORS, WE ARE WONDERING IF IT WOULD BE POSSIBLE TO HAVE CEILING FANS INSTALLED IN THE CONTROL ROOM TO HELP CIRCULATE THE AIR. PLEASE.. THANK YOU OPERATION STAFF | Open |
215500 | Michael Olson | Purchase miscellaneous equipment | Open |
215595 | Matthew Shriver | C1 - ISU - TURB OVERHAUL - MECHANICAL SUPPORT | Open |
216147 | Joseph Mesner | C1-P-04-M - OPEN DOOR ON SPEED CONTROL ACUATOR AND CHECK GEAR BUSHING ON WORM DRIVE. THIS GEAR BUSHING WAS REPLACED LAST YEAR AND MADE BY AUTO INDUSTRIAL. ORIGINAL EQUIPMENT WAS MADE OF SOME TYPE OF PLASTIC AND IT WAS RE-BUILT WITH BRASS. | Open |
216632 | Mark Kruse | CFB Project Emissions Permitting FY23 | Open |
217201 | Ben Young | Replace differential pressure switches for CW & CHW. | Open |
218289 | Matthew Shriver | B1 - PERFORM CHEMICAL CLEAN | Open |
218708 | Lee Mason | Parking spots in lot 68 for 20 construction workers. | Open |
223052 | Lee Mason | Mail out 2 electrical breakers. | Open |
223637 | Gordon Woods | BFWP2 -COMPLETION OF REPAIRS ON THE UNIT FOLLOWING OVERHAUL | Completed |
224701 | Joseph Mesner | BLDG - CHECK FOR AIR LEAKS AND REPAIR. | Open |
224702 | Joseph Mesner | BLDG - CHECK FOR AIR LEAKS AND REPAIR. | Open |
224818 | Jason Nord | CW LINE ON MEZZANINE NEEDS INSULATION REPAIRED. | Open |
226296 | Lisa Ristvedt | Utilities-Power Plant-Chiller 5 Compressor Overhaul FY23 | Open |
230169 | Lee Mason | Yearly Hach service contract for RO Hach analyzer. | Open |
230484 | Joedy Snyder | S-400/90 - THE 400/90 DESUP CONTROL VALVE IS LEAKING A SIGNIFICANT AMOUNT OF STEAM BETWEEN THE BODY AND BONNET. THE TWO ISOLATION VALVE ON THE STEAM INLET SIDE ARE LEAKING AROUND STEM AND PACKING. SHOULD HAVE THIS UNIT REPAIRED BEFORE WINTER COMES AND WE NEED TO PUT THIS ON | Open |
231649 | Matthew Shriver | TG4 - DISCONNECT LUBE OIL CONNECTIONS TO THE UNIT AND DISCONNECT THE FIRE PROTECTION TO THE PURIFIER AND LUBE OIL TANK. | Open |
232299 | James Farrell | B1 - V-152C - BOILER 1 DRUM VENT VALVE (V-152C) IS BROKEN. WHEN YOU OPEN IT THE VALVE SEAT MUST BE DISCONNECTED BECAUSE WE GET NO STEAM OUT OF THE VENT ON THE ROOF. FOUND BY DANIEL APPAU | Open |
238959 | Matthew Shriver | DW - REPLACE DEMIN MAKEUP CONTROL VALVE AND ACTUATOR. NEW ONE SHOULD HAVE POSITIONER WITH FEEDBACK. | Open |
238996 | Lee Mason | POWER TESTING | Open |
239033 | Matthew Shriver | CR-P-02AB - VIBRATION ANALYSIS INDICATED THE BASES FOR THESE PUMPS IS NOT OF ADEQUATE MASS. | Open |
239045 | Matthew Shriver | B1 - INSTALL DSH BLOCK VALVE BEFORE CONTROL VALVE. THIS BLOCK VALVE SHOULD BE CONTROLLED BY THE BOILER PLC AND OPEN WHEN DESUPERHEATER OUT TEMPERATURE REACHES 740F. | Open |
239046 | Matthew Shriver | B2 - INSTALL DSH BLOCK VALVE BEFORE CONTROL VALVE. THIS BLOCK VALVE SHOULD BE CONTROLLED BY THE BOILER PLC AND OPEN WHEN DESUPERHEATER OUT TEMPERATURE REACHES 740F. | Open |
239093 | James Farrell | BLDG - ROOF DRAIN PIPE ON 5TH LEVEL HAS A HOLE IN IT. FOUND BY AARON MARCOMB | Open |
239559 | Caleb Barduson | Phase 4 - Furniture & Chairs | Completed |
239601 | Melissa Warg | FDC DESIGN PROFESSIONALS | Open |
240070 | Michael McCurdy | B1 - ADDRESS LEAKING MANWAY GASKET AND POSSIBLE CAUSES. THE SURFACE OF THE MAWAY AND THE MATING SURFACE OF THE DRUM MAY NEED MACHINED. ENSURE THE GASKETS ARE SIZED CORRECTLY. THE NORTH MANWAY GASKET ON B1 NEEDS ADDRESSED AND THE SOUTH GASKET MAY BE THE SAME. JAMES SMITH WITH LOCKE AMI SAYS THEY HAVE PEIPLE THAT DO THIS. WORK TO BE DONE DURING TH EDUAL BOILER OUTAGE SPRING OF 2023 | Open |
241337 | Matthew Shriver | TG3 - GENERATOR VAR CONTROL DOES NOT SEEM STABLE. | Open |
245875 | Joseph Mesner | CR - INVESTIGATE POSSIBLE CONDENSATE LEAKS IN THE PLANT. | Open |
245931 | David Nobiling | TG6-PCV-116 - TURBINE GLAND SEAL PRESSURE CONTROL VALVE POSITIONER HAS AN AIR LEAK AROUND THE BODY OF THE POSITIONER. | Open |
245952 | Michael Olson | ISU Transportation Services rental car for trip to HK Scholz | Open |
246299 | Joseph Mesner | S - HEADER VALVE FOR TG3 LEAKS BY STEAM AND IS ALSO LEAKING STEAM OUT OF THE PACKING. INVESTIGATE SOLUTION TO REPLACE VALVE OR HAVE VALVE RE-BUILT. | Open |
246302 | Joseph Mesner | S - TG5 STEAM HEADER VALVE LEAKS BY. INVESTIGATE REPLACING VALVE OR HAVING VALVE RE-BUILT. CHANGE OUT BY-PASS VALVES ALSO. | Open |
246490 | Gordon Woods | B2 -INSPECT & CLEAN SHOT SAFETY VALVE. VENDOR WILL PICK UP TO TEST & INSPECT SAFTY. OBJECTIVE IS TO HAVE THE FLANGE GASKET SEAL AND PREVEN STEAM LEAK. | Completed |
247128 | Lee Mason | Ductwork repair found during Boiler 1 conversion project. | Open |
247959 | Matthew Shriver | WW - THERE IS A WELL WATER LINE BREAK NEAR THE CONTRACTORS GRAVEL PARKING LOT. | Open |
248285 | Matthew Shriver | B1 - DEMO SOOTBLOWING SYSTEM FROM B1. DISCONNECT STEAM FEED LINE FROM THE BOILER DURING SPRING 2022 OUTAGE REMOVE SOOTBLOWERS AND PLUG HOLES IN BOILER. | Open |
251040 | Matthew Shriver | B2 - DEMO SOOTBLOWING SYSTEM FROM B2. DISCONNECT STEAM FEED LINE FROM THE BOILER DURING SPRING 2022 OUTAGE. REMOVE SOOTBLOWERS AND PLUG HOLES IN BOILER. | Open |
251185 | Matthew Shriver | B1/2 - INSPECT/REPAIR COMMON DUCT WORK FROM ID FAN OUTLETS TO AND INCLUDING THE STACK. | Open |
251915 | Gordon Woods | MH -COAL - REPAIRS TO BEND AND TORN BUCKETS ON THE NORTH LEG. | Completed |
252564 | Joseph Mesner | C1-P-04 - INSPECT CHILLED WATER PUMP AND CHANGE VALVE ON OUTLET SIDE OF PUMP THAT SUPPLIES CAMPUS. | Open |
252699 | Joseph Mesner | S - CAP OFF STEAM AND CONDENSATE GOING TO PENTHOUSE ON THE ROOF OF THE 6TH LEVEL. THIS SHOULD BE DONE SOMETIME THIS SPRING WHEN THE HOUSE HEAT IS SHUT OFF. | Open |
254528 | Michael Mayfield | C1 - CONDENSER ON CHILLER #1 HAS HOLE THAT NEEDS WELDED. | Open |
258134 | Larry Battazzi | B8-V-268- MANUAL VALVE BELOW STARTUP VENT HAS A PACKING LEAK | Open |
258342 | Gordon Woods | B2-CLEAN OUT ALL ASH, BED MATERIAL & LIMESTONE FROM THE UNIT IN PREPERATION FOR CONVERSION TO GAS | Completed |
258405 | Matthew Shriver | BD-TK-02 - DISCHARGE OF THIS TANK IS COLD. SUSPECT THERE IS AN ISSUE WITH THE SERVICE WATER CONTROL THAT IS SUPPOSED TO CONTROL THE TEMPERATURE OF THE DISCHARGE TO AROUND 100F. | Completed |
258645 | Joseph Mesner | C1-CND-06 - ADDRESS PINHOLE LEAKS ON C1 STEAM CONDENSOR. | Open |
258696 | Joseph Mesner | CW - INVESTIGATE LONG TERM SOLUTION TO DETERIORATING STEAM CONDENSORS. SPECIFICALLY CONDENSORS ON OUR TURBINE DRIVEN EQUIPMENT. | Open |
258979 | Larry Battazzi | B9-BLOWDOWN LEAK ON MAIN BLOWDOWN LINE | Open |
259222 | Joseph Mesner | B9 - INSTALL REMOTE GREASE LINES. | Open |
259317 | Gordon Woods | FP- REMOVED NEWER ISOLATIONG VALVE FROM THE DELUGE STATION ON TG4. CAN REPLACE THE PLUG IN TYPE ON OTHER STATIONS (TG3 OR CHILLERS 1 & 2). WILL REQUIRE OUTAGE OF FIRE SYSTEM TO INSTALL AND COORDINATION WITH THE E & I STAFF FOR WIRING. LO PRIORITY BACK LOG WORK. | Open |
259362 | Ty Grady | B8 - REINSULATE CONDENSATE LINES OFF OF AIR HEATER | Open |
259531 | Joseph Mesner | B8,B9,B10 - INSTALL LIFTING BEAMS TO TROLLY SAFETY VALVES OFF THE GAS BOILER DRUMS. ENGINEERING OF BEAMS WILL NEED TO BE DONE PRIOR TO INSTALLATION. | Open |
260236 | Travis Van Dyke | Engineering support and materials for new fiber to the Power Plant | Open |
260593 | Matthew Shriver | S - INSTALL UNIT HEATER IN THE CFB BASEMENT AREA BY THE FW CHEMICAL INJECTION AREA | Open |
265247 | Gordon Woods | S-TP-90-71 FOR UH 32 LOCATED ON THE NORTH WALL HAS A LEAK IN THE PACKING ON THE STEAM SIDE VALVE (NO TAG NUMBERS YET). PACK THE VALVE IT POSSIBLE OR REPLACE IF NECESSARY. | Open |
265285 | James Farrell | B9 - THE WARMING COIL CONDENSATE SIDE HAS A LEAK. | Open |
265303 | Joseph Mesner | CW-FAN - PERFORM ALIGNMENTS ON COOLING TOWER FANS | Open |
266110 | Larry Battazzi | B9 - WEST SAFTEY LEAKING ON DRUM A LITTLE | Open |
266338 | Gordon Woods | B2 - SUPERHEATER TUBE LEAK FOUND DURING CLEANING OF THE UNIT. NEED TO HAVE WALDINGER IN TO WELD REPAIR THE AREA. | Open |
266431 | Matthew Shriver | B1 - FLUE GAS DUCT PRESSURES (B1-PT-470, B1-PT-470C, B1-PT-471, B1-PT-472, AND B1-PT-460) SHOULD ALL BE READING NEGATIVE INH20. THEY SHOULD GET MORE NEGATIVE AS THEY GET CLOSER TO THE ID FAN INLET. | Open |
266705 | Gordon Woods | CW-COOLING TOWER BAYS 1 &2 NEED TO ADJUST OR DIGHTEN THE PVC COLUMN ON THE LEVEL DETECTOR TO KEEP IN FROM SLIPPING. NEEDS TO BE PERFORMED DURING ANNUAL OUTAGE OF BAYS 1 & 2 TO PROVIDE ACCESS TO THE FASTNERS. CONSULT WITH DAVE NOBILING IF YOU HAVE ANY QUESTIONS | Open |
267016 | Calvin Egger | MAIN POWER PLANT, MAIN COOLING TOWER, CELL 3 CIRC WATER INLET TEMP LOWER THAN THE OTHER TEMPS. | Open |
267017 | Calvin Egger | CW - CT CELL 7 INLET TEMP READS 0 (ZERO) DEGREES. | Open |
267124 | Matthew Shriver | ISU - CAMPUS TITLE V PERMIT UPDATE | Open |
267251 | Matthew Shriver | C3 - C3 CHW PUMP SPEED CONTROLLER MINIMUM SPEED LIGHT IS NOT WORKING. | Open |
267306 | Gordon Woods | CW-COOLING TOWER BAY 7 CONCRETE WALL IS DETERIORATING AND NEEDS REPAIRED. WILL REQUIRE CONCRETE CONTACTOR AND TOWER OUTAGE | Open |
268453 | Brian Thilges | PP- EPOXY TOWER SUMP PIT AND TROUGH IN TOWER BUILDING | Open |
268573 | Lee Mason | WT – Water Treatment Plant Tank Inspections | Open |
272257 | Brian Thilges | PP-FW- ADD 150 PSI RELIEF VALVE TO FW CHEMICAL CARRIER LINE | Open |
272399 | Gordon Woods | C/CR - ORDER TAGS & FASTNERS FOR LABELING THE SYSTEM | Open |
272740 | Brian Thilges | VM - CW - GET RUBBER LINER THE SAME AS IN THE BLEACH CONTAINMENT AT THE NCWP. WILL INSTALL WINTER OF 23/24. | Open |
272815 | Gordon Woods | CH - INSPECTION OF THE SCALE FOR PROPER OPERATIONS | Open |
273032 | Michael Olson | Purchase transformer oil in 55 gallon drum | Open |
273365 | Joedy Snyder | PD-PU - SUMP PIT PUMP BY TG#3, WEST PUMP HAS A BAD PUMP OR COUPLING. ITS NEEDS SOME SERIOUS ATTENTION | Completed |
274101 | Aaron Marcomb | TG5-TU-01 GENERATOR LOW PRESSURE RACK IS UNRESPONSIVE | Open |
275033 | Gordon Woods | S-INSPECTION AND REPAIR OF THE POWEL VALVE ON THE 400/90 STATION. OUTAGE PROJECTED AUGUST 7TH 2023. VENDOR WILL OPEN AND INSPECT THEN PROVIDE REPAIR COSTS. | Open |
275061 | Daniel Appau | Boiler : Drain line out of Steam Flow Transmitter : B8-FIT-802 on east side of the boiler leaks droplets of condensate. Perhaps drain line valve needs replacement. | Open |
275094 | Caleb Barduson | Phase 4 - JCI Design | Open |
279164 | Lisa Ristvedt | Utilities-Power Plant-Boiler Makeup Reverse Osmosis 4 Installation | Open |
279168 | Lisa Ristvedt | Miscellaneous Purchases | Open |
279171 | Lisa Ristvedt | Miscellaneous | Open |
279363 | David Nobiling | EE - SEVERAL LIGHTS ON THE 2ND LEVEL AREAS, ON THE NORTH SIDE OF THE FIRING AISLE | Completed |
279601 | Ben Young | Remove insulation around Service Water meter, test accuracy with portable flow meter, replace if needed with Flexim unit. | Open |
279796 | Scott Valentine | EE - MANY LIGHTS ARE DIM, OUT, OR FLICKERING THOUGHT THE CFB AREA. FLOORS 6-10 | Open |
279958 | Gordon Woods | BOILER MAINTENANCE - DISPOSAL OF ALL STOCK PARTS WHICH SUPPORTED THE COAL OPERATION OF THE PLANT. | Open |
279959 | Wade Siskow | Utility locates for CFB Boiler conversion. | Open |
280152 | Joseph Mesner | S - RE-BUILD TG5 HEADER VALVE. LINE UP ALLIED VALVE TO DO THIS WORK DURING HEADER #4 OUTAGE | Open |
280153 | Gordon Woods | TG5 -THE HP RACK IS BINDING. INSPECTION DISPLAYED WORN PARTS AND LACK OF LUBRICATION. ORDER REPLACEMENT PARTS AND INSTALL THE SAME AT THE NEXT OUTAGE WINDOW. | Open |
280165 | Joseph Mesner | S - REPLACE VALVES AND ADD DRAIN VALVE BETWEEN THE TWO VALVES ON TG5 HEADER VALVE. | Open |
280169 | Joseph Mesner | S - REPLACE VALVES S-V-113, S-V-116, S-V-136. ALL ARE LOCATED ON HEADER 4. | Open |
280252 | Gordon Woods | TG5 -THE LP RACK IS BINDING. INSPECTION DISPLAYED WORN PARTS AND LACK OF LUBRICATION. ORDER REPLACEMENT PARTS AND INSTALL THE SAME AT THE NEXT OUTAGE WINDOW. | Open |
280574 | Larry Battazzi | TG3 - TURING GEAR WILL NOT ENGAGE FOUND IT OFF TONIITE | Completed |
280593 | Joseph Mesner | TG5 - TURNING GEAR WILL NOT ENGAGE. | Open |
280664 | Matthew Shriver | B10-FIT-810 - CHECK THE CALIBRATION OF B10 GAS FLOW METER. IT IS CURRENTLY READING 6000+ WITH THE BOILER OFFLINE. | Open |
280666 | Wade Siskow | UC Shop reconstruction following Station Power electrical room installation. | Open |
280716 | Ben Young | Replace Service Water Meter. Remove chart recorder, gauges, green cabinet, and associated equipment for current transmitter and green enclosure. Install conduit/wiring for 4-20mA loop back to BOP cabinet to be terminated at available AI. Provide 120VAC to power new transmitter. Reinsulate piping once complete to allow for servicing of the installed unit. Coordinate with Ben Young | Open |
280772 | Jason Nord | TG5 - TURNING GEAR MOTOR LEADS NEED TO BE REWIRED. THEY ARE OXIDIZED,BRITTLE, AND FEEL VERY WEAK. | Open |
280800 | Lee Mason | Utilities-Power Plant-Boiler Makeup Reverse Osmosis 4 Installation Engineering Support | Open |
280806 | Lee Mason | Utilities-Power Plant-Boiler Makeup Reverse Osmosis 4 Installation Electrical and Instrumentation Installation and Support | Open |
280808 | Lee Mason | Utilities-Power Plant-Boiler Makeup Reverse Osmosis 4 Installation Mechanical Installation and Support | Open |
280988 | Michael Olson | HVBC equipment purchase from Material Stores. Contractor will reimburse equipment. | Open |
281411 | Larry Battazzi | LIGHTS ABOVE AND ARROUND THE CHILLER BAY ARE MISSING OR BURNED OUT | Materials-Awaiting |
281470 | Lee Mason | Support CFB Conversion Project Demo | Open |
282353 | Larry Battazzi | C1 - WEST BEARING OIL ON PUMP LEAKING AND NOT VISIBLE | Open |
282501 | Michael McCurdy | CH - perform annual coal inventory survey. Work to be done by Snyder and Associates | Open |
282534 | Larry Battazzi | SW-P-02 - LOT OF WATER OUT OF BEARING HUBS | Open |
282547 | Larry Battazzi | C1 - NEED TEST BUTTON FOR ALARM LIGHTS | Open |
282550 | Wade Siskow | Development and execution of Utilities High Voltage Thermal-Imaging program. Program will involve the assessment of all applicable HV switchgear, transformers, terminations, etc... | Open |
286176 | Caleb Barduson | Repair leaking valve on chilled water line that runs outside of Power Plant offices on second floor mezzanine. | Open |
286661 | Gordon Woods | TRAINING - CONTRACT WITH WOS FOR WELDING TESTING | Completed |
286732 | Lee Mason | Title V DNR Fee for Operating Permit | Open |
286939 | John Holland | B1-SH - SUSPISIOUS STEAM LEAK UNDER SKIRTING SE CORNER BETWEEN LEVEL 6 AND LEVEL 8. PRIMARY SH INLET DRAIN IN VECINITY MIGHT BE CULPRIT. VIDEO ON CHIEF PHONE. | Completed |
287417 | Lee Mason | Service Water Pump Replacement Project Engineering Services Indefinite Scope Release | Open |
287585 | Gordon Woods | B1 - REPAIR A LEAK IN THE PENTHOUSE OF THE BOILER. | Open |
287616 | Joedy Snyder | B1-ST - STEAM DRUM LEVEL INDICATER NEEDS REPLACED ( SOUTH SIDE ) | Open |
288000 | Shane England | Repair Chop Saw # 10 | Assigned |
288052 | FPM Service Desk | FY24 Electrician Apprentice Abc Classes - Nco | Open |
288054 | FPM Service Desk | FY24 Campus Substations Electrical Maintenance | Open |
288056 | FPM Service Desk | FY24 Sampling/Testing Of Oil From Electrical Equipment | Open |
288057 | FPM Service Desk | FY24 Paint & Flags For Utility Locates | Open |
288059 | FPM Service Desk | FY24 Remove Weeds Growing Into Electrical Equipment | Open |
288061 | FPM Service Desk | FY24 Respirators For Uc (Distribution Electrical) | Open |
288062 | FPM Service Desk | FY24 Testing Of Rubber Gloves, Blankets, & Hot Sticks | Open |
288063 | FPM Service Desk | FY24 Sidewalk Lighting Maintenance | Open |
288064 | FPM Service Desk | FY24 Utility Locates For Utility-Elect Distribution | Open |
288069 | FPM Service Desk | FY24 Electrical Distribution Engineering & Drafting | Open |
288070 | FPM Service Desk | FY24 Chw Distribution Engineering | Open |
288071 | FPM Service Desk | FY24 Electrical Distribution Management Services | Open |
288072 | FPM Service Desk | FY24 Electrical System Engineering | Open |
288073 | FPM Service Desk | FY24 Gas Distribution Engineering | Open |
288074 | FPM Service Desk | FY24 Mechanical Distribution Management Services | Open |
288075 | FPM Service Desk | FY24 Meter Billing Engineering | Open |
288077 | FPM Service Desk | FY24 Sanitary Sewer Agreement Engineering | Open |
288078 | FPM Service Desk | FY24 Sanitary Sewer Engineering | Open |
288080 | FPM Service Desk | FY24 Utility Engineering Management Services | Open |
288081 | FPM Service Desk | FY24 Steam Distribution Engineering | Open |
288082 | FPM Service Desk | FY24 Storm Sewers Engineering | Open |
288083 | FPM Service Desk | FY24 Utility Maps & Drafting | Open |
288084 | FPM Service Desk | FY24 Water Distribution Engineering | Open |
288085 | FPM Service Desk | FY24 Water Regulation Engineering | Open |
288086 | FPM Service Desk | FY24 Water Agreement Engineering | Open |
288087 | FPM Service Desk | FY24 Abb System Support | Open |
288089 | FPM Service Desk | FY24 Util - Boiler Operating Inspections/Certificate | Open |
288090 | FPM Service Desk | FY24 Dcs Database & Cad Maintenance | Open |
288091 | FPM Service Desk | FY24 Dcs Graphics Development And Maintenance | Open |
288092 | FPM Service Desk | FY24 Dcs Network & Hardware Maintenance | Open |
288093 | FPM Service Desk | FY24 Dcs Server And Client Maintenance | Open |
288094 | FPM Service Desk | FY24 Up - E&I & Electrician Tools | Open |
288095 | FPM Service Desk | FY24 Za-Maintenance Of Fire Extinguishers In Heating Plant | Open |
288099 | FPM Service Desk | FY24 Up - Miscellaneous Supplies For Plant Maintenance | Open |
288100 | FPM Service Desk | FY24 Performance Engineering | Open |
288101 | FPM Service Desk | FY24 Plant Mgmt Services | Open |
288102 | FPM Service Desk | FY24 Plc & Hmi Network & Hardware | Open |
288103 | FPM Service Desk | FY24 Plant Network & Hardware | Open |
288104 | FPM Service Desk | FY24 Plc Hmi Graphic & Opc Maintenance | Open |
288105 | FPM Service Desk | FY24 Plc Configuration Maintenance | Open |
288106 | FPM Service Desk | FY24 Power Plant Water Testing | Open |
288107 | FPM Service Desk | FY24 Pp - Title V Checks | Open |
288108 | FPM Service Desk | FY24 Pp - Lubrication Rounds | Open |
288109 | FPM Service Desk | FY24 Up - Purchase Of Misc Small Tools For Plant Maint.(Up) | Open |
288110 | FPM Service Desk | FY24 Production Reporting | Open |
288112 | FPM Service Desk | FY24 Remote Plant Operators Tools | Open |
288113 | FPM Service Desk | FY24 Up - Repair Of Shop Tools For Plant Maintenance | Open |
288114 | FPM Service Desk | FY24 Shoes, Glasses And Respirators For Up (Utility Plant Maintenance | Open |
288116 | FPM Service Desk | FY24 Shop Piping Supplies | Open |
288117 | FPM Service Desk | FY24 Testing Of E & I Tech Electrical Gloves | Open |
288118 | FPM Service Desk | FY24 Tool Box I (Jerry Schumacher) | Open |
288119 | FPM Service Desk | FY24 Toolbox B (Jim Oberender) | Open |
288120 | FPM Service Desk | FY24 Toolbox A (Justin Travis) | Open |
288121 | FPM Service Desk | FY24 Toolbox C (Mike Lycke) | Open |
288122 | FPM Service Desk | FY24 Toolbox E (Shannon Doise) | Open |
288123 | FPM Service Desk | FY24 Toolbox F (Joe Mesner) | Open |
288124 | FPM Service Desk | FY24 Toolbox G (Doug Aldinger) | Open |
288125 | FPM Service Desk | FY24 Toolbox H (Ty Grady) | Open |
288126 | FPM Service Desk | FY24 Vibration Rounds In The Plant | Open |
288127 | FPM Service Desk | FY24 Welding Supplies (Gas Cylinders Rods) - W003217 | Open |
288128 | FPM Service Desk | FY24 TOOLBOX D (Operations) | Open |
288129 | FPM Service Desk | FY24 Water Testing Supplies | Open |
288130 | FPM Service Desk | FY24 - VM OPERATIONS | Open |
288131 | FPM Service Desk | FY24 - AS OPERATIONS | Open |
288132 | FPM Service Desk | FY24 CHW-F-01 - CHILLED WATER FILTER - FITER BAG PURCHASES | Open |
288133 | FPM Service Desk | FY24 - NC - OPERATIONS | Open |
288134 | FPM Service Desk | FY24 CEM SYSTEM OPACITY | Open |
288136 | FPM Service Desk | FY24 - OIL SAMPLE BOTTLES | Open |
288137 | FPM Service Desk | FY24 Sanitary Sewer Miscellaneous Work | Open |
288221 | FPM Service Desk | FY24 Maint/Repair Miller Welder (Trailer 9718) | Open |
288314 | FPM Service Desk | FY24 Snow Removal Power Plant Coal Yard | Open |
288368 | FPM Service Desk | FY24 Maintenance and Repair - TRUCK, 3/4 TON, UTILITY BODY - E009062 | Open |
288377 | FPM Service Desk | FY24 Maintenance and Repair - TRUCK, 3/4 TON W/ ELECTRIC LIFTGATE - E009115 | Open |
288379 | FPM Service Desk | FY24 Maintenance and Repair - FORKLIFT, 6000 LBS, LOW-PROFILE - E009114 | Open |
288380 | FPM Service Desk | FY24 Maintenance and Repair - LOADER, HL760XTD -9A ARTICULATED - E009120 | Open |
288382 | FPM Service Desk | FY24 Maintenance and Repair - TRUCK, 3/4 TON, UTILITY BODY - E009116 | Open |
288383 | FPM Service Desk | FY24 Maintenance and Repair - TRUCK, 1 TON, UTILITY BODY 4X4 - E009117 | Open |
288426 | FPM Service Desk | FY24 Maintenance and Repair - TRUCK, EXTENDED CAB COLORADO PICKUP - E009246 | Open |
288485 | FPM Service Desk | FY24 Maintenance and Repair - TRUCK, DUR-A-LIFT ARTICULATED TELESCOPIC AERIAL, 40 FT - E009382 | Open |
288540 | FPM Service Desk | FY24 Maintenance and Repair - LOADER, L120H ARTICULATED - E009723 | Open |
288568 | FPM Service Desk | FY24 Maintenance and Repair - SWEEPER 6 FT - E009755 | Open |
288569 | FPM Service Desk | FY24 Maintenance and Repair - BUCKET, HEAVY DUTY 74"""" - E009754 | Open |
288570 | FPM Service Desk | FY24 Maintenance and Repair - SKIDLOADER, 4-WHEEL DRIVE - E009753 | Open |
288572 | FPM Service Desk | FY24 Maintenance and Repair - BLADE, 6 FT SNOW - E009756 | Open |
288580 | FPM Service Desk | FY24 Maintenance and Repair - 8 FT SNOW PUSHER LOADER - E009770 | Open |
288753 | FPM Service Desk | FY24 POWER - SLA General Cleaning | Open |
288853 | FPM Service Desk | FY24 POWER - Supplies (SLA) | Open |
288877 | FPM Service Desk | FY24 Confined Space Monitor Maint-Utilities Production | Open |
288878 | FPM Service Desk | FY24 Confined Space Monitor Maint-Utilities Electrical | Open |
288881 | FPM Service Desk | FY24 Confined Space Monitor Maint-Utilities Mech | Open |
288893 | FPM Service Desk | FY24 PCB Items Disposal Costs | Open |
288989 | FPM Service Desk | FY24 - CH - COAL YARD AND ROAD SWEEPINGS FOR FISCAL 2023 | Open |
288996 | FPM Service Desk | FY24 Filters Lubrication Activities | Open |
288997 | FPM Service Desk | FY24 Compressor Warranty Activities Compressor 2 | Open |
288998 | FPM Service Desk | FY24 Compressor Warranty Activities Compressor 1 | Open |
288999 | FPM Service Desk | FY24 Compressor Warranty Activities Compressor 4 | Open |
289000 | FPM Service Desk | FY24 Compressor Warranty Activities Compressor 3 | Open |
289001 | FPM Service Desk | FY24 - PP - WEEKLY CA AND DW CHECKS | Open |
289002 | FPM Service Desk | FY24 - PP - UP SHOP PLANT CLEANUP | Open |
289037 | FPM Service Desk | FY24 COOLING TOWER WINTER MAINTENANCE | Open |
289822 | Matthew Shriver | EEC-BKR-730 - ERRONEOUSLY TRIPPED TWICE ON 6/14/23 AND ONCE ON 6/15/23. | Open |
290050 | FPM Service Desk | FY24 Air Emissions Testing | Open |
290054 | FPM Service Desk | FY24 Pollution Control System Engineering | Open |
290261 | Gordon Woods | QUARTERLY INSPECTION OF THE STATION UPS SYSTEM BY HUBILL | Materials-Awaiting |
290274 | David Nobiling | C2 - INSTALL AN UPDATED ANNUNCIATOR PANEL FOR THE COMPRESSOR AND TURBINE | Open |
290395 | Matthew Shriver | BOP PLC - REMOVE THE RE-ALARMING FEATURE ON THE ALARMS INITIATED IN THE BOP PLC WITH THE EXCEPTION OF THE CHLORINE DIOXIDE ALARM (LEAVE UNCHANGED). ALSO MODIFY THE HMI TO PUT THE MOST CURRENT ALARMS AT THE TOP (NOT THE BOTTOM) OF THE ALARM HISTORY. | Open |
290397 | Matthew Shriver | B8910 - INSTALL BOILER START/TRIP LIMIT SWITCH THAT MONITOR THE MANUAL VALVE (Bx-v-268) BELOW THE STARTUP VENT TO ENSURE IT IS OPEN DURING STARTUP OR RUN. THE PLC SHOULD BE PROGRAMMED TO TRIP THE BOILER IF THIS LIMIT SWITCH IS NOT INDICATING THE VALVE IS OPEN. | Open |
290398 | Matthew Shriver | CW - INSTALL MOISTURE SENSOR IN THE ACID CONTAINMENT PIT AT THE COOLING TOWER CHEMICAL BUILDING THAT WILL ALARM BACK AT THE CONTROL ROOM. | Open |
290452 | FPM Service Desk | FY24 Annual Maintenance for Emergency Power Generator - POWER - E025547 | Open |
290500 | FPM Service Desk | FY24 Maintenance and Repair - ELECTRIC ARTICULATING BOOM LIFT ABL1 - E049743 | Open |
290513 | FPM Service Desk | FY24 Vacuum Bag Disposal | Open |
290669 | Larry Battazzi | FW-V-194 - INLET VALVE TO FWP#2 LEAKS BY HAD TO ISOLATE VALVE ABOVE | Open |
290700 | Gordon Woods | UPS-INSPECTION - DC GROUP WILL BE IN TO INSPECT THE GAS BOILER BUILDING UPS. | Completed |
293214 | Larry Battazzi | B10 - BLOWDOWN PIPE LEAKING ON FRONT OF BOILER | Completed |
293635 | David Nobiling | B1-LT-530 - UPDATE/REPLACE OLD BOILER 1 DRUM LEVEL TRANSMITTER. | On Hold |
293643 | Brian Thilges | PP - ADD MOISTURE SENSOR TO WATER PLANT BLEACH STORAGE AREA FOR LEAK DETECTION. | Open |
294251 | Larry Battazzi | FW-01-P - CAN'T ISOLATE SUCTION ON PUMP | Open |
294951 | russell manske | PP- CONDENSATE POLISHER B BACKWASH VALVES LEAK BY ALLOWING SERVICE WATER INTO CONDENSATE. | Open |
295062 | Gordon Woods | BUILDING SYSTEMS - PURHASE OF SYSTEM TAGS FOR FY24. | Open |
295333 | Jason Nord | B-8,9,10 NG E-STOP. WE WOULD LIKE THIS TO ALARM TO CONTROL ROOM ANNUNCIATOR SCREEN. FO ALARM SHOULD ALSO COME IN. | Open |
295377 | russell manske | PP- CONDENSATE POLISHER C BACKWASH VALVES LEAK BY ALLOWING SERVICE WATER INTO CONDENSATE. | Open |
295499 | David Nobiling | FW-DA-02 - EAST DA TANK LEVEL HIGH AND LOW LEVEL SWITCHES NEED TO BE REPLACED AND REPIPED. | Open |
296757 | Gordon Woods | CW-P-07 - THERE IS A VIBRATION IN THE UNIT WHICH WE BELEIVE CAN BE ADDRESSED BY BALANCEING THE UNIT. | Completed |
296811 | Larry Battazzi | B10 - PLEASE CHECK O2 PROBE FALLING OUT AND TRIM VALVE AWFULLY LOW PERCENTAGE | Open |
300153 | Calvin Egger | WT- POLYMER PUMP DOESN'T REFILL TANK WHEN IT SHOULD. LOW POLYMER TANK ALARM DOES SOUND, AT WHICH TIME WE MANUALLY REFILL POLYMER TANK. MCCLAIN SAID HE TAPPED ON THE MANUAL-OFF-RUN METAL SWITCH BOX AND IT STARTED THE REFILL ONCE. I TRIED IT TWICE AND IT DIDN'T WORK FOR ME. | Completed |
300155 | Calvin Egger | LL - COOLING TOWER SOUTH SIDE STREET LAMP/LIGHT IS BURNING OUT. THE MIDDLE OF THE THREE RUNNING ALONG THE SOUTH SIDE OF THE COOLING TOWER. | Open |
300450 | Calvin Egger | LL - LIGHT NORTH OF POLISHERS, NEAR SERVICE WATER PUMPS AND BRINE TANK IN MAIN POWER PLANT BASEMENT IS OUT. | Open |
300471 | Lee Mason | Stack test dust analysis | Open |
300481 | Lee Mason | Boiler 8, 9 and 10 CEMDAS PC replacement | Open |
300502 | Lee Mason | Boiler 1 Conversion Emissions Compliance Plan | Open |
300548 | Jason Nord | REVIEW EXIT LIGHTS COMPLIANCE/RISK CHECK WITH EH&S | Open |
300585 | Jason Nord | REVIEW DISCUSSION/AFTER-ACTION FOR SAFETY COMMITTEE | Open |
300610 | Jason Nord | VERIFY ROOM AND SAFETY WALK ON OUTLOOK | Completed |
300998 | Gordon Woods | WT-TK-01 - SCHEDULE INTERNAL INSPECTION OF THE STORAGE TANK | Open |
301043 | Larry Battazzi | B1 - NORTH DOWNCOMMER DRAIN NEEDS REPLACED ALSO THE VALVES ARE LEAKING BY ASWELL | Open |
301044 | Joedy Snyder | FP-TROUBLE ALARM - 3RD FLOOR CFB NORTH WALL IN CONTINUIOUS ALARM , CALLED DAVE HE WILL BYPASS | On Hold |
301350 | Brian Thilges | CW - REPLACE ACID PUMP A AT COOLING TOWER BUILDING. WILL USE NEW STYLE GRONFOSS PUMP. ASSIGN TO JOE. | Open |
301576 | Lee Mason | Chemical cleaning on CFB boiler | Open |
301659 | Gordon Woods | FP- TRANSFORMER YARD NOZZLES, REMOVE AND CLEAN THE NOZZLES. ACTIVATE THE SYSTEM TO FLUSH LINES AND THEN REINSTALL THE NOZZLES. REPLACE THE CONSTANT VELOCITY BALL VALVE | Open |
301660 | Lisa Ristvedt | Utilities-Power Plant-Turbine Generator #6 Overhaul FY24 | Open |
301664 | Lisa Ristvedt | Contracted Services | Open |
301766 | Gordon Woods | FY24 - RO FILTERS & SUPPORT | Open |
301924 | Joedy Snyder | BLDG-S - TV MONITOR IN NEW GAS BOILER HOUSE IS FROZEN | Open |
302282 | Gordon Woods | BLDG -ANNUAL INSPECTION OF ALL HOIST & CRANES. | Open |
302358 | Jason Nord | GREEN BARN-ROOF LEAKS AROUND THE SKYLIGHTS. | Open |
302376 | Jason Nord | GREEN BARN-IN THE OLD BLOWER ROOM/PIPE FITTERS NEW STORAGE ROOM, THERE IS A LIGHT FIXTURE THAT NEEDS TO BE REPAIRED/REPLACED. | Completed |
302489 | Gordon Woods | BLDG - CRANES & HOIST INSPECTION OF THREE UNITS MISSED DURING ANNUAL. | Open |
302605 | Michael Mayfield | - FIRE ALARM - GEN #5 DELUDGE BAD CONTACT ALARM ON FIRE SYSTEM. | On Hold |
302675 | Gordon Woods | FP - FIRE PRTECTION HAVE AN ALARM ISSUE ON BOILER 10 IN THE GAS BOILER BUILDING TO BE ADDRESSED | Completed |
303064 | Wade Siskow | Purchase Husky cable cutter capable of cutting up to 750kcmil 133% EPR cable. Replacement of existing damaged tool. | Open |
303357 | David Nobiling | CW-CT-PUMPS 5 AND 6 - BOTH COOLING TOWER PUMPS TRIPPED AT THE SAME TIME (8/22 @ 10:20 pm). IN THE TRENDS PUMP 5 WAS RUNNING STEADY AROUND 315 AMPS AND PUMP 6 WAS RUNNING AROUND 345 AMPS BEFORE THEY BOTH TRIPPED. - MAYFIELD WAS ON DUTY - | Open |
303358 | David Nobiling | B1-HMI-DRUM LEVEL - ON THE B1 HMI, OPENING THE FEEDWATER FCV THERE IS AN ISSUE WITH THE "PV" AND "SP". THE "PV" WINDOW WILL ONLY DISPLAY THE "BCS DRUM LEVEL". IT WILL NOT SWITCH TO "BMS DRUM LEVEL" OR "BMS DRUM LEVEL AVERAGE". THE "SP" WINDOWN WAS DISPLAYING THE "BMS DRUM LEVEL AVERAGE". I DON'T RECALL SEEING IF IT CHANGED IF IT WAS CHANGED TO "BCS DRUM LEVEL" | Open |
303361 | David Nobiling | B1-HMI-DRUM LEVEL - IN THE "BMS 2oo3 DRUM LEVELS" SCREEN, ENABLEING THE "BMS DRUM LEVEL AVERAGE". DISCOVERED THAT THIS BLOCK IS NOT AVERAGING "A", "B", & "C" DRUM LEVEL TRANSMITTERS. THIS BLOCK IS ONLY LOOKING AT DRUM LEVEL "A" TRANSMITTER. | Open |
303373 | David Nobiling | B1-LCV-530 - ON B1 IN THE DCS GRAPHIC, OPENING THE FEEDWATER CONTROL VALVE CONTROL WINDOW. THE SPAN IN THIS WINDOW IS 12 TO -12 THIS NEEDS TO BE CHANGED TO 10 TO -10. | Open |
303456 | Jason Nord | B-8,9,10 - INVERTER WARNING FOR HIGH TEMP | Completed |
303618 | Gordon Woods | FO-ANNUAL TANK REGISTRATION FEES UTILITIES STANDING FY WORK ORDER IS 288089 | Open |
303736 | Larry Battazzi | AC UNIT ABOVE OLD CONTROL ROOM WATER DRAINING ON FLOOR PLEASE REROUTE | Open |
303844 | n/a DPS | 08/24/2023-Air Compressor Fire in the Plant Fire Department Responded. | Assigned |
304015 | Charles Rodgers | Survey and sampling in response to fire | Open |
304033 | Craig Mitchell | Tiles in the large shower are broken towards the bottom south side. | Materials-Awaiting |
304035 | Craig Mitchell | Sink has lost its airator | Completed |
304036 | Craig Mitchell | Sink airator has disappeared and needs a replacement. | Completed |
305182 | Michael Mayfield | - BLR#1 - MAIN STEAM LINE ON LEVEL #3 HAS A PIN SIZED HOLE UNDER THE INSOLATION ABOVE DRAIN VALVES. | Open |
305259 | Michael Olson | Utility Engineering-Power Plant Air Compressor #2 fire response | Open |
305325 | Wade Siskow | Provide utility locates for ISU farm properties at the Horticulture Farm and W. Riverside Drive. | Open |
305417 | Lee Mason | Install concrete housekeeping pad | Open |
305455 | Gordon Woods | CA SYSTEM - UPGRADE OF TEMPERATURE PROBES IN THE AIR COMPRESSORS FOLLOWING THE FIRE IN CA2 | Open |
305522 | Wade Siskow | Issue Request ID to absorb costs of missing inventory lighting fixtures (6746.2605 and 6746.2600) that have no historical record of being purchased. Inventory discrepancies likely occurred prior to FAMIS360. | Open |
308895 | James Farrell | WT-F-01 - WATER PLANT GRAVITY FILTER 1 (NORTH) - BACKWASH OUTLET VALVE LEAKING BY INTO THE TROUGH. DISCOVERD BY RUSTY WHITE | Open |
309243 | Larry Battazzi | BKR622 - AMPS NOT READING ON DCS PANNEL PINK QUESTION MARKS | Open |
309286 | Gordon Woods | BLDG-FP-ANNUAL INSPECTION OF THE MAIN PLANT. | Open |
309437 | Mark Overton | AIR DRIER 3 AUTOMATIC BLOWDOWN NOT WORKING | Completed |
309458 | Matthew Shriver | B8 - FD FAN BEARING TEMPERATURES ARE READING 100F WITH TEMPERATURE GUN BUT THE LOCAL PLC IS READING 160F AND 100F FOR BOTH FAN BEARINGS. | Completed |
309464 | Matthew Shriver | CA - DISABLE THE CLOSING OF THE AUTOMATIC VALVE THAT PROVIDES COOLING WATER TO AC1, AC3, AND AC4. DO NOT TAKE THE VALVE OUT OF THE PIPE. | On Hold |
309580 | Brian Thilges | B9 - CHECK SIDE STREAM BLOWDOWN FOR OBSTRUCTIONS. LET RPO'S KNOW WHEN DOING WORK. | Open |
309719 | Calvin Egger | DSH - DSH-AOV-138 - [ LP DESUP PRESS PV (DSH_PT_1) AS WRITTEN ON THE COMPUTER ] SAYS IT IS RUNNING AT 470PSIG, WITH THE SETPOINT AS 330PSIG, SHOULD BE 330PSIG. THE VALVE (DSH-AOV-138) WAS SHOWING GREEN, RED, AND PURPLE. THE VALVE POSITION WAS CYCLING FROM COMPLETELY SHUT TO BARELY OPEN. | Open |
309829 | Michael Mayfield | - VC - THE VACUUM SYSTEM MOTOR WAS 205 AFTER HE SHUT IT OFF NEEDS LOOKED INTO TO BE SURE IF SOMETHING IS WRONG. | Open |
309837 | David Nobiling | FW-AOV-176 - EAST DA TANK 2 LEVEL CONTROL VALVE WILL NOT CLOSE. | Completed |
309929 | Roy Ball | C-DA-02 THERE IS A LEAK ON THE EAST DA TANK THAT APPEARS TO BE NEAR THE BOTTOM OF THE TANK BUT NOT FOR SURE. JOE MESNER HAS LOOKED AT THE LEAK ALSO. IT SEEMS TO HAVE JUST STARTED TODAY. | Open |
310007 | Michael Olson | Station Power Phase 4-Baker Electric subcontractor extra labor hours | Open |
310075 | Nicholas Kolbet | TG6 - MD&A - Field Services - Base Work - 2024 Overhaul | Open |
310081 | Larry Battazzi | B1 - SOUTH SITE GLASS LEAKING AT UNION | Open |
310089 | Joseph Mesner | CA - CHANGE OUT BUNA GASKETS IN OIL PIPING TO UPGRADED VITON GASKETS. | Open |
310152 | Gordon Woods | UPS-Quarterly inspection by Vendor | Completed |
310213 | Daniel Appau | Concerning TG5: Basement floor at east of TG5- efforts to alleviate the constant floor wetness. 1. Please insulate chilled water pipes into and out of the 3D TRASER unit mounted on the column in this area. 2. Please if possible route the two casing drains into the drain pan. | Open |
310312 | Gordon Woods | FY24 SAMPLING AND TESTING OF ASBESTOS IN THE POWER PLANT | Open |
310504 | Lee Mason | Wire up heater in CFB basement in NW corner by chemical tanks from T cabinet on the East side of the CFB basement using spare breaker 19. | Open |
310507 | Lee Mason | Install electrical wiring for RO skid #4. | Open |
310535 | Gordon Woods | B2 -CLEANING OF THE ASH FROM THE BOILER IN PREPARTION FOR BOILER LITE OFF | Open |
310583 | David Nobiling | ASC-B2 CIRC. PUMP MOTOR TRIPPING THE BOILER. THE MOTOR OVER HEATING AND IS MAKING SOME ODD NOISE. | Open |
310650 | Jason Nord | WP - BASEMENT - NEED SHOUSEKEEPING. | Open |
310651 | Jason Nord | WP - BASEMENT - IT WAS SUGGESTED TO HAVE A SIGN PUT UP OUTSIDE INSULATOR'S ROOM LABELING IT AS A SEVEERE WEATHER SHELTER. | Open |
310662 | NICHOLAS KOLBET | TG6 - MD&A - Turb Shop - Base Work - 2024 Overhaul | Open |
310669 | Craig Mitchell | Paper towels dispenser lever has stopped working. | Assigned |
310696 | Jason Nord | WP - BASEMENT -THE SERVICE WATER DRAIN PIPE IS VERY CORRODED . IT IS SOUTH OF AC4. PLEASE CHECK ALL PIPES IN THIS BASEMENT AREA. | Open |
310699 | Jason Nord | WP - BASEMENT - THERE IS A HOT WATER LINE GOING TO ELECTRICIANS SINK THAT IS NOT INSULATED AND IS RESTING ON ELECTRICAL CONDUIT. | Open |
310702 | Jason Nord | WP - BASEMENT - THERE IS A SMOKE ALARM BY THE RO SYSTEM THAT HAS A BROKEN COVER AND BROKEN SUPPORTS. IT IS STILL WORKING HOWEVER. | Open |