Current Projects
Loading project list, please wait...
AGRON- General-216423-Wayfinding Signs
Construction Documents
Building: Agronomy Hall
Room: General
Request date: 8/17/2022
Requested by: Rita Brueland
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Agronomy is asking about getting wayfinding signs around the building. Stephanie Zumbach called Printing Services and was directed to FP M. Steve Henry is who Stephanie talked with at Printing Services. Do you need anything else from me?
AGRON-1401-309631-Remodel Office for ADA Accommodations
Project Closeout
Building: Agronomy Hall
Room: 1401
Request date: 9/12/2023
Requested by: Rita Brueland
Contact: Alexa Peters
Construction start:
Construction end:
Description:
This project will remodel existing office for ADA accommodations.
AGRON-2013-286589-Lighting Carpet and Paint
Project Closeout
Building: Agronomy Hall
Room: 2013
Request date: 6/8/2023
Requested by: Rita Brueland
Contact: Alexa Peters
Construction start: 5/9/2024
Construction end: 7/17/2024
Description:
May I have a quote for room 2013 for lights, carpet, and maybe paint. Will confirm paint prior to our meeting.
7/19/2023 - per Rita there will be paint on this as well.
2/27/2024 - Project Re-Opened per Rita Brueland
We are going with the same lighting that was installed in 2019.
Remove: counter, mini-blinds. carpet tile and wall base
Install: Carpet tile, wall base, transitions strip, paint.
AGRON-3013-296615-Paint & Carpet
Project Closeout
Building: Agronomy Hall
Room: 3013
Request date: 7/27/2023
Requested by: Rita Brueland
Contact: Alexa Peters
Construction start: 10/6/2023
Construction end: 11/24/2023
Description:
May I have a quote for painting room 3013 Agronomy Hall? Please use Worktag PG100240. My Outlook calendar is up to date.
8/1/2023- Adding Carpet
AGRON-3017-389478-New Office Furniture
Construction
Building: Agronomy Hall
Room: 3017
Request date: 9/10/2024
Requested by: Robert Nystrom
Contact: Brady Streit
Construction start: 10/30/2024
Construction end: 4/30/2025
Description:
I need to order some new office furniture.
AGRON-3019-317472-Paint Carpet and Countertop Removal
Project Closeout
Building: Agronomy Hall
Room: 3019
Request date: 10/25/2023
Requested by: Suzanne Ankerstjerne
Contact: Alexa Peters
Construction start: 4/24/2024
Construction end: 6/25/2024
Description:
Rm 3019 needs to be refreshed with new paint, carpet, and baseboards. This project would be the same color scheme and scope as the work done in Rm 3017 a few years ago, so no design effort is needed. The dept is checking to see if there are extra floor tiles from the Rm 3017 project.
This scope has expanded to include removing a countertop
AGRON-3128-337084-Tables Replacement
Project Closeout
Building: Agronomy Hall
Room: 3128
Request date: 1/24/2024
Requested by: Kristie Franz
Contact: Alexa Peters
Construction start: 4/24/2024
Construction end: 6/12/2024
Description:
10 new tables for teaching lab Room 3128. These will be replacements for the long tables in the center of the room where the computers sit. We want something less bulky and more functional.
AGRON-3501-376548-Painting, New Lighting, Carpet in 3501, 1126A, 1561
Project Closeout
Building: Agronomy Hall
Room: General
Request date: 7/19/2024
Requested by: Rita Brueland
Contact: Alexa Peters
Construction start: 9/11/2024
Construction end: 10/24/2024
Description:
Please provide a quote for painting, new lighting, and carpet in the following rooms 3501, 1126A, 1561 Agronomy hall. Worktag PG100744
AGRON-B0022-376015-Rusted Piping
Construction Documents
Building: Agronomy Hall
Room: B0022
Request date: 7/12/2024
Requested by: Andrew Laughlin
Contact: Donna Imhoff
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Natural Gas and Fire Sprinkler piping rusted. Piping may fail in tunnels south of Room B0022.
AGRON-General-338227-Fire Escape Repairs
Construction Documents
Building: Agronomy Hall
Room: General
Request date: 1/30/2024
Requested by: John Netwal
Contact: John Byerly
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Fire Escape Repairs - Inspection Report in LX folder and G Drive folders.
AGRON-General-397026-Room 1553 - Replace Carpet, Lights, and Paint
Construction
Building: Agronomy Hall
Room: General
Request date: 10/23/2024
Requested by: Rita Brueland
Contact: Brady Streit
Construction start: 11/13/2024
Construction end: 5/14/2025
Description:
This is for Brady Steit.
Room 1553 - Replace carpet, lights, and paint. Remove a few of the wall shelving and brackets. Keep the credenza
Room 1563 - Replace carpet, lights, and paint.
Room 1403 - Replace lighting
Please use Worktag PG113353 - DD00726 for all three projects.
AGRON-R1364-309634-Remodel Restroom for ADA Accommodations
Project Closeout
Building: Agronomy Hall
Room: R1364
Request date: 9/12/2023
Requested by: Rita Brueland
Contact: Steven Nelson
Construction start:
Construction end:
Description:
This project will remodel existing restroom for ADA accommodations.
ALUMCTR- General-294172-Exterior Limestone Repair
Project Closeout
Building: Alumni Center
Room: General
Request date: 7/14/2023
Requested by: Michael Kepler
Contact: Alexa Peters
Construction start: 10/1/2024
Construction end: 10/15/2024
Description:
About 8-10yrs ago Nelson Construction was hired to build the 3rd Phase of our Alumni Donor wall on the east side of the building along the A2 parking lot. Lately we have had front edge limestone pieces that are adhered on and a few are coming loose so the adhesive is failing. One piece was glued back on last week by Country Landscapes but in the process it cracked in a couple spots and they don't necessarily want to be fixing these moving forward. I was hoping we could get a couple of these pieces from Nelson Construction or somewhere else to match and that way we have a spare piece or two plus I would like to replace the one that is cracked now as it doesn't look great. Please call my cell to discuss further 540.682.3359. Thanks!
ALUMCTR-General-329316-Exterior Downspout Repair
Construction
Building: Alumni Center
Room: General
Request date: 12/5/2023
Requested by: Michael Kepler
Contact: Brady Streit
Construction start: 9/18/2024
Construction end: 3/19/2025
Description:
In the spring I would like to take a look at all of our downspouts coming off the roof of the boardroom and ballroom on the west side of the building. When I was cleaning them out this fall I noticed some joints where the caulking is wearing out or in some places completely gone and this might be contributing to some leaking we've had inside the building when we get hard rain. At least one drain is missing some metal flashing to direct the water away from the building that I would like to repair/replace as well.
**This can be on hold until Spring. I just wanted to get a project opened so we can get on it first thing after winter.**
Thanks!
ARMORY-0025-404531-Replace FCU
Schematic Design
Building: Armory
Room: 0025
Request date: 11/18/2024
Requested by: Justin Abbott
Contact: Brian Grove
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Replace FCU
ARMORY-0027-348494-Office Furniture
Construction
Building: Armory
Room: 0027
Request date: 3/7/2024
Requested by: Mishelle Franklin
Contact: Jennifer Warrick
Construction start: 7/26/2024
Construction end: 12/2/2024
Description:
I am inquiring as two staff members in our Parking office would like to switch to a stand-up desk set up.
ARMORY-General-371599-Signage
Project Initiation
Building: Armory
Room: General
Request date: 6/25/2024
Requested by: Susan Radke
Contact: Joseph Stoberl
Construction start: 10/4/2024
Construction end: 4/4/2025
Description:
signage - getting new faculty - dropped off examples with Duane
smaller office sign: LCDR T. L. Lawler
larger sign: LCDR T. L. LAWLER
(I need to keep those samples, thanks!!)
ARMORY-Room 0049-Lockers in Men's Locker Room
Project Closeout
Building: Armory
Room: 0049
Request date: 9/20/2021
Requested by: Maggie Sprecher
Contact: Alexa Peters
Construction start: 6/16/2023
Construction end: 1/25/2024
Description:
We need some new carpet/carpet runners installed in the PD men's locker room area. We would prefer a large rug/runners that would be easy to take out and clean and be very durable.
10/13/21
Change in Scope: Adding new lockers and benches to the space. Carpet runners are not really part of the project any more.
ASB-2175-324146-BSS Remodel
Project Closeout
Building: Administrative Services Building
Room: 2175
Request date: 11/21/2023
Requested by: Michael Newton
Contact: Melissa Warg
Construction start:
Construction end:
Description:
Remodel space (room 2175) for Building Security Services (BSS)
BSS is moving to ASB in 2024.
ASB-Risk Management Reconfigure Workspace
Construction
Building: Administrative Services Building
Room: General
Request date: 5/24/2021
Requested by: Susanne Johnson
Contact: Jennifer Warrick
Construction start: 8/1/2024
Construction end: 1/30/2025
Description:
Reconfigure Workspace
COST RANGE WILL BE PROVIDED
WE ARE LOOKING FOR OPTIONS TO ADD A WORKSPACE (FOR A NEW STAFF MEMBER) AND TRANSITION WHAT HAS BEEN "RECEPTION" SPACE TO INDIVIDUAL CUBICLE/WORKSPACE
LOCATION: NORTH END - OFFICE OF RISK MANAGEMENT AREA
KNOWN TIME CONSTRAINTS: NEW TEAM MEMBER TO START IN LATE JULY OR EARLY AUGUST. ALSO CURRENTLY WORKING THROUGH THE JULY 1 "RETURN TO CAMPUS" WORKSPACE PLANNING FOR OUR TEAM.
FUNDING CONTACT: JOHNSON, SUSANNE
ASC 1-0186-349824-Install Eye Wash Station
Cost Range Approval
Building: Applied Science Complex 1
Room: 0186
Request date: 3/26/2024
Requested by: Susan McBirnie
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
EH&S has requested an eye wash station be placed inside storage room 186 & 188 due to the type of chemicals stored in there. I turned this in as a service request and they let me know it was more than they could handle and suggested I turn it in through the project desk.
Could you please give us an estimate only on what this project will cost.
ASLC-GENERAL-355335-Remodel
Project Closeout
Building: Jeff & Deb Hansen Ag Stdnt Lrn Ctr
Room: General
Request date: 4/9/2024
Requested by: Cory Walker
Contact: Alexa Peters
Construction start: 6/24/2024
Construction end: 7/22/2024
Description:
Update main office and conference spaces with new carpet, seating and possibly tables.
ASLC-General-363671-Update Sign in Front of Building
Project Initiation
Building: Jeff & Deb Hansen Ag Stdnt Lrn Ctr
Room: General
Request date: 5/22/2024
Requested by: Lisa Peterson
Contact: Joseph Stoberl
Construction start: 8/30/2024
Construction end: 2/28/2025
Description:
Update the sign in front of the building. Letters are coming off and would like to change what the sign displays as well.
ASLC
Additional location information: Update sign in front of the building
Work tags to attach: PG102554
ATANSFF-0101-324116-Remodel
Project Closeout
Building: Atanasoff Hall
Room: 0101
Request date: 11/21/2023
Requested by: Lorrie Ludwig
Contact: Brady Streit
Construction start: 4/17/2024
Construction end: 11/13/2024
Description:
We are looking at possibly remodeling this office over winter break. Needs some new ceiling tiles and some painting. Need an idea if this can be done during the break along with a cost estimate.
ATANSFF-0203-362989-Office Furniture
Project Closeout
Building: Atanasoff Hall
Room: 0203
Request date: 5/17/2024
Requested by: Lorrie Ludwig
Contact: Brady Streit
Construction start: 9/10/2024
Construction end: 11/19/2024
Description:
Requestor is asking for new office furniture similar to the office remodels in rooms 204 and 205. Also needs to have shelving and bulletin board removed from walls. Patching and painting will need to be done as well. Deadline is August 1st. Brady Streit has met with Lorrie Ludwig at this space already.
ATANSFF-General-336641-Water Heater Study
Construction Documents
Building: Atanasoff Hall
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Brian Grove
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We would like to have the Engineering Team review the recently installed Water Heater for Code Compliance in the mechanical room and develop a detailed plan to correct any deficiencies found that could be shared with either a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
ATRB- GENERAL-272248-Exterior Furniture
Construction
Building: Advanced Teaching Research Building
Room: General
Request date: 4/3/2023
Requested by: Donna Moore
Contact: Eric Ohrt
Construction start: 7/27/2023
Construction end: 12/2/2024
Description:
Hi all, I would like to request an estimate for outdoor picnic tables similar to the black metal tables located on the west side of Kildee Hall by the food truck. We have a roof overhang and a wide sidewalk on the east side of our ATRB building that would be an ideal spot for some outdoor seating options for studying, lunch, or outdoor meetings. (Request does not need to specifically be those tables but some type of outdoor seating table option.) Thanks, Donna
ATRB-5209-355969-Faculty Remodel
Construction
Building: Advanced Teaching Research Building
Room: 5209
Request date: 4/16/2024
Requested by: Hanna Bates
Contact: Eric Ohrt
Construction start: 8/5/2024
Construction end: 2/3/2025
Description:
I am reaching out to explore options for a faculty member to convert a space to a computation lab for up to 4 students. We have three room options on 5th floor ATRB, but we don''t know which of the three options would best suit his needs.
Three options for the computation lab:
ATRB 5002
ATRB 5007
ATRB 5331
The faculty member's needs are:
Natural lighting as students would spend all of their working hours in the space
Access to power outlets for connecting power strips for up to a total of 10 monitors, 10 laptops, and other personal electronics
Flexible seating arrangements with legroom and some space in the middle of the room so that the others don't have to move as one gets up and walks out of the room
Reasonable access to the white board(s) on the wall
A view of a common wall with a projector/TV installed on it - for discussion of research
One common (<3ft height) storage unit for keeping supplies like - extra cables , and computer peripherals
4/22/2024 - They have chosen Room 5209
BCRF-1-General-343187-HWY 30 Signage
On Hold
Building: Bcrf-1 Biomass Processing Facility
Room: General
Request date: 2/20/2024
Requested by: Alison Doyle
Contact: Denise Wulf
Construction start:
Construction end:
Description:
Proceed with new BCRF signage on Hwy 30, and are committed to getting it done as soon as we can with a drop dead of Farm Progress—and I believe they’d also like to upgrade the signage at their entrance as well. The Farm Progress Show is August 27-29.
BDSHR-0210 & 0640-385831-Remodeling
Bidding
Building: Beardshear Hall
Room: 0210
Request date: 9/3/2024
Requested by: Patricia Kendall
Contact: Jennifer Warrick
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
Multiple areas. I would like the pamphlet display in the east side of the hallway of 0210 removed, the wall patched and painted as needed. 0460B Beardshear I would like to move the desk again the south wall into the 0640A office and remove the old desk on the south wall of 0640A and send to asset recovery. 0460B Beardshear I would like to move out the north desk to storage and remove the shelves and bins from the walls and patch and paint as needed. In 0460B purchase and install a large monitor on the north wall of the office. In 0460B price a meeting table that would fit the area for small work group meetings. In 0640 in the main room I would like to have the north wall patched and painted.
BDSHR-0210-368832-Update Doors
Construction
Building: Beardshear Hall
Room: 0210
Request date: 6/5/2024
Requested by: Patricia Kendall
Contact: Jennifer Warrick
Construction start: 7/30/2024
Construction end: 12/2/2024
Description:
Beardshear rooms 0210, 0280, 0410, 0460, 0570 and 0640. We would like to add two card readers to 0280 and 0570 and update all doors to be able to be locked from the inside. We previously received a quote for this but it took to long and crossed over funding years and we lost funding. The first request was 230652. We have been approved again for the next year so we would like to get an update bid.
BDSHR-0530-137262-Office Remodel/Swap
Cost Range Approval
Building: Beardshear Hall
Room: 0530
Request date: 11/3/2021
Requested by: Heather Paris
Contact: Scott Jasper
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
Tammy Hansen, Interim Accounts Receivable Director, has developed a proposal to move the ISU Card Office operations into the Accounts Receivable suite (0880 Beardshear) and repurpose the existing space in the ISU Card Office (0530 Beardshear) to provide two offices and hoteling space for the Accounts Receivable Accounting Team. This would align all student facing customer service positions within one shared space. Pam Cain and I are very supportive of this direction and would like to begin working to develop a project design plan, budget and timeline.
2/22/2024 Scope Update
This will be a move of the Treasurer Staff from BDSHR 0810 to 0530 and the Card Staff will be moved from 0530 to 0810. They will need new furniture and would like to look at the 0810 space to see if it can be redesigned for better use for the card office.
BDSHR-1350-310124-Hazardous material abatement and telecom expenses
Building: Beardshear Hall
Room: 1350
Request date: 9/15/2023
Requested by: Lisa Ristvedt
Contact: Hayley Sandholm
Construction start:
Construction end:
Description:
Hazardous material abatement and telecom expenses
BDSHR-1350-317538-Automation, design and printing
Building: Beardshear Hall
Room: 1350
Request date: 10/30/2023
Requested by: Haley Sandholm
Contact: Hayley Sandholm
Construction start:
Construction end:
Description:
DO NOT REASIGN THIS WORK ORDER: Beardshear 1350 - Automation, design and printing
BDSHR-1350K-390025-New Traditional Office Furniture
Bidding
Building: Beardshear Hall
Room: 1350K
Request date: 9/13/2024
Requested by: Sean Reeder
Contact: Jennifer Warrick
Construction start: 12/5/2024
Construction end: 6/5/2025
Description:
Please provide Dr. Sean Reeder, SVP with new traditional office furniture with new layout for functionality and privacy. Table and chairs for 4 people, likes the idea of the Tree Cycle program if possible. Also needs a conference table and chairs in Room 1350J.
BDSHR-2350-354970-Window Security Safety Film
Schematic Design
Building: Beardshear Hall
Room: 2350
Request date: 4/3/2024
Requested by: Rachel Boenigk
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Proceeding with the necessary modifications and installation of security/safety film for Windows in Beardshear Hall, Room 2350. This effort will require the technical expertise/assistance of a ballistics/security expert + developing a scope of work / associated cost to ensure clarity of expectations.
BDSHR-2350-399240- Window Treatments
Construction
Building: Beardshear Hall
Room: 2350D
Request date: 11/1/2024
Requested by: Rachel Boenigk
Contact: Mitchell Hlavacek
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
We need window film installed in 2 different offices in 2350 Beardshear to reduce glare on screens.
Moving into a project because Wes Gee stated that window film on the exterior windows would not be approved. He recommended looking into the second blackout shade or possibly the same colored shade that will allow less light through potentially. That way all the shades in the office suite will still match.
BDSHR-2350E-395900- Bookshelves
Construction
Building: Beardshear Hall
Room: 2350E
Request date: 10/2/2024
Requested by: Rachel Boenigk
Contact: Mitchell Hlavacek
Construction start: 10/8/2024
Construction end: 4/8/2025
Description:
Dr. Younger would like to get some shelves for the wall next to her table as well as a small (2-high) bookshelf for the space next to her desk.
BDSHR-2550-268415-Reconfiguration of Workstations
On Hold
Building: Beardshear Hall
Room: 2550
Request date: 3/30/2023
Requested by: Siti Sabtu-Schaper
Contact: Scott Jasper
Construction start: 10/8/2024
Construction end: 4/8/2025
Description:
We would like to move the existing workststation in 2550 front area to an area outside of 2550B. In addition, create two identical workstations in that space. We would like to reuse the existing panels if possible.
BDSHR-2680-390319-EO Office Relocating
Construction Documents
Building: Beardshear Hall
Room: 2680
Request date: 9/25/2024
Requested by: Suzanne Fisher
Contact: Stephanie Hosier
Construction start: 1/28/2025
Construction end: 7/29/2025
Description:
EO Office will be relocating from Beardshear 3410 to Beardshear 2680. Will need to relocate and/or reconfigure furniture for several areas within suites 2680 & 2750. Will likely need some new furniture. May need to be phased in over time due to budget.
Mary Sirna
PG102132
BDSHR-3150-183328-Conference Room Tables & Chairs
Project Closeout
Building: Beardshear Hall
Room: 3150
Request date: 4/25/2022
Requested by: Schyler Polaski
Contact: Jennifer Warrick
Construction start: 11/5/2024
Construction end: 11/26/2024
Description:
I would like to get an estimate for new tables and chairs in the Conference Room. Please have the interior designers contact me about the project.
10/25/2022 - Adding power to tables.
BDSHR-3590-239524-Conference Room Remodel
Project Closeout
Building: Beardshear Hall
Room: 3590
Request date: 11/16/2022
Requested by: Melanie Rogotzke
Contact: Jennifer Warrick
Construction start: 11/13/2023
Construction end: 6/24/2024
Description:
Quote on upgrading table and technology in conference room
BDSHR-3750-356850-Door Signage
Construction Documents
Building: Beardshear Hall
Room: 3750
Request date: 4/25/2024
Requested by: Emily Goodall
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We would like to change wording on our glass doors to correctly reflect occupants of each of the areas. This includes 3750, 3680, 3770, 3280, 3210, and 3810.
BDSHR-General-245705-Provost & SVP Office Remodels
Project Closeout
Building: Beardshear Hall
Room: 1550
Request date: 12/2/2022
Requested by: Siti Sabtu-Schaper
Contact: Jennifer Warrick
Construction start: 8/1/2024
Construction end: 9/19/2024
Description:
We would like to convert our current office desks/stations into adjustable height desks/workstations. This is going to be for all workstations in 0680 Beardshear, 1550 Beardshear and 2550 Beardshear. There isn't a section for worktag for me to enter. Please use PG103865 DD03454 for this.
BESSEY-0403-368581-Infrastructure Updates
Construction
Building: Bessey Hall
Room: 0403
Request date: 6/4/2024
Requested by: Jennifer Plagman-Galvin
Contact: Alexa Peters
Construction start: 10/28/2024
Construction end: 4/28/2025
Description:
Teaching lab needed cleaned (already completed) with minor updates to infrastructure to support teaching needs for Fall 2024.
BESSEY-General-316331-Furniture
Project Closeout
Building: Bessey Hall
Room: General
Request date: 10/11/2023
Requested by: William Crumpton
Contact: Eric Ohrt
Construction start: 1/25/2024
Construction end: 6/28/2024
Description:
We would like to order two round tables that seat 4. One is for room 201 Bessey Hall and one is for room 353 Bessey Hall.
I have attached a picture with an example of the size that we need. Saved in G drive and LX project folders.
Worktags:
50% PG101847 DD18105
50% PG101851 DD18105
BESSEY-General-336643-Water Heater Study
Cost Range Approval
Building: Bessey Hall
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
We would like to have the Engineering Team review the recently installed Water Heater for code compliance in the mechanical room and develop a detailed plan to correct any deficiencies found that could be shared with either a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
BEYER-1306-403587-Add chilled water to rooms 1306, 1308 and 1310
Schematic Design
Building: Beyer Hall
Room: 1306
Request date: 11/7/2024
Requested by: Garry Greenlee
Contact: Mike McCoy
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Rec Services would like to investigate the possibility and cost to provide chilled water AC to Beyer Hall Food Pantry (SHOP) rooms 1306, 1308 and meeting room 1310.
BEYER-1310-355046-Remodel
Construction
Building: Beyer Hall
Room: 1310
Request date: 4/4/2024
Requested by: Garry Greenlee
Contact: Brady Streit
Construction start: 8/14/2024
Construction end: 2/12/2025
Description:
Rec Services and Student Wellness would like to upgrade Beyer Hall room 1310. We would like a cost estimate on the following items: Painting the room, remove / replace carpet with carpet tiles, remove/replace floor tile with new floor tile, replace the seating (stadium seating), remove/replace ceiling tiles and lighting. I would like to meet in person at 1310 to discuss the scope when it is assigned to one of your staff. For funding I need to know what your charges would be to perform this cost estimate.
BEYER-1423-403590-Add chilled water to rooms 1423, 1423A, 1423B and 3430
Schematic Design
Building: Beyer Hall
Room: 1423
Request date: 11/7/2024
Requested by: Garry Greenlee
Contact: Mike McCoy
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Rec Services would like to explore the possibility of Beyer Hall Room 1423, 1423A, 1423B having chilled water AC in this space. Also, is this close enough to include room 3430 with he chilled water AC?
BEYER-2302-405380-Conference Room 2302 Furniture Project
Construction Documents
Building: Beyer Hall
Room: 2302
Request date: 12/2/2024
Requested by: Garry Greenlee
Contact: Rebecca Cantrall
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
Conference Room 2302 Furniture Project - This is split off from PR1253086
BEYER-2304-382923-Rec Services Office Space
Construction Documents
Building: Beyer Hall
Room: 2304
Request date: 8/13/2024
Requested by: Garry Greenlee
Contact: Steven Daniels
Construction start: 1/27/2025
Construction end: 7/28/2025
Description:
Rec Services needs to create office space in 2304, 2304a,2304b,2304c and 2302. This would include removing a closet that in not structural, designing two new offices in 2304 (glass walls), new office furniture, new conference room tables and chairs. Rec Service would like to meet and discuss our options so we are on the same page.
BEYER-2308-405215- Add second office
Schematic Design
Building: Beyer Hall
Room: 2308
Request date: 12/2/2024
Requested by: Garry Greenlee
Contact: Rebecca Cantrall
Construction start: 2/27/2025
Construction end: 8/28/2025
Description:
At Beyer Hall room 2308 has one office with glass walls. We need to add a second office with matching glass walls/door. Our preference would be directly south of office 2308A. If that is not possible then directly west of 2308A. Heating and cooling would need to be provided to this space from existing sources.
Black Engineering - Rm 1091 - 362236 - Fume Hood
Bidding
Building: Black Engineering Bldg
Room: 1091
Request date: 5/13/2024
Requested by: Sandy Sayer
Contact: Eric Ohrt
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
We are considering moving Todd Kingston into 1091 Black but he needs a fume hood. How much would it be to put a fume hood in 1091 Black?
BLACK-1095-362831-Demo Old Hoods, Add Fume Hood
Construction Documents
Building: Black Engineering Bldg
Room: 1095
Request date: 5/17/2024
Requested by: Sandy Sayer
Contact: Mike McCoy
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
purchase and install fume hood in 1095. Remove all existing exhaust hoods and replace with one fume hood. Adjust HVAC so the lab remains BSL2
BLACK-1104A-385638-Electrical Updates
Project Closeout
Building: Black Engineering Bldg
Room: 1104A
Request date: 9/17/2024
Requested by: James Dautremont
Contact: Eric Ohrt
Construction start:
Construction end:
Description:
Item 1 needs:
2 - 480 V, 30 A, 3 phase outlets & fused disconnect
1 - 208 V, 20 A, 1 phase outlet ( 6-20R )
Item 2 needs:
1 - 208 V, 50 A, 1 phase outlet ( 10-50R )
Estimate cost before proceeding.
Work tags to attach: GR-028404-00001
BLACK-2016-369838-Furniture
Construction
Building: Black Engineering Bldg
Room: 2016
Request date: 6/20/2024
Requested by: Ethan Secor
Contact: Eric Ohrt
Construction start: 8/28/2024
Construction end: 2/26/2025
Description:
I am interested in potentially getting new furniture for my office, Black Engineering 2016. One of my colleagues (Todd Kingston, Black Engineering 2036) recently worked with FP&M to get new furniture in his office, and I may be interested in simply duplicating the furniture selection that he made, depending on price and similar options.
BLACK-2022-322850-Office Furniture and Design
Project Closeout
Building: Black Engineering Bldg
Room: 2022
Request date: 11/3/2023
Requested by: Sougata Roy
Contact: Eric Ohrt
Construction start: 2/2/2024
Construction end: 11/12/2024
Description:
I would like to setup my office space with proper furniture and designs. It will be helpful if someone stop by my office to discuss and share their ideas for that. Thanks!
BLACK-2095-382536-Flooring
Construction
Building: Black Engineering Bldg
Room: 2095
Request date: 8/12/2024
Requested by: Sandy Sayer
Contact: Eric Ohrt
Construction start: 9/4/2024
Construction end: 3/5/2025
Description:
Please remove the floor tiles in this lab and polish and seal the concrete floor. I will have it emptied mid September.
BLACK-C0089-371403-Repair Leaks
Bidding
Building: Black Engineering Bldg
Room: C0089
Request date: 6/24/2024
Requested by: Andrew Laughlin
Contact: Amy Tremain
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
Multiple leaks in Hallway C0089, needs to be repaired.
BLACK-General-336419-Safety Showers
Construction
Building: Black Engineering Bldg
Room: General
Request date: 1/19/2024
Requested by: Sandy Sayer
Contact: Eric Ohrt
Construction start: 5/29/2024
Construction end: 12/2/2024
Description:
EHS has indicated multiple research labs on the first floor of Black require safety showers. 1116, 1095 and 1103
BLACK-GENERAL-337207-Third Floor Carpet Replacement
Budget Approval
Building: Black Engineering Bldg
Room: General
Request date: 1/25/2024
Requested by: Sandy Sayer
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
New carpet in all the offices and conference rooms on the third floor like what we have been installing on the second floor. When all the IMSE folks move out when their new building is done replace all the carpet on the third floor with the new carpet we are having installed on second.
BLACK-General-341774-2nd Floor Carpet Replacement
Construction
Building: Black Engineering Bldg
Room: General
Request date: 2/6/2024
Requested by: Sandy Sayer
Contact: Eric Ohrt
Construction start: 8/23/2024
Construction end: 2/21/2025
Description:
New carpet for the rest of the 2nd floor offices in 3 phases over summer
Phase 1: 2008, 2011, 2020, 2030, 2038, 2035, 2078, 2098
Phase 2: 2010, 2016, 2026, 2034, 2068, 2072, 2092, 2102
Phase 3: 2012, 2018, 2028, 2036, 2070, 2074, 2096
BLACK-General-356004-Repair-Replace Glass Block
Schematic Design
Building: Black Engineering Bldg
Room: General
Request date: 8/15/2024
Requested by: Shelley Anderson
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Outside of RM C3001 in the stairwell, there is water comin down the wall, possibly from the window.
The glass block is leaking and will need to be repaired/replaced.
BLACK-General-357837-New Carpet Rms 1012 & 0095
Construction
Building: Black Engineering Bldg
Room: General
Request date: 4/29/2024
Requested by: Sandy Sayer
Contact: Eric Ohrt
Construction start: 9/24/2024
Construction end: 3/25/2025
Description:
New carpet squares installed over raised floors in computer lab 1012 and a classroom 95E in Black. We prefer square tiles that can be carpet taped at the corners so we can still access the wiring underneath. Like the carpet in 1020 Black. There is a lot of foot traffic and rolling chairs so something that wears well.
BLACK-General-362574-Improve Exhaust Capacity
Construction Documents
Building: Black Engineering Bldg
Room: General
Request date: 5/13/2024
Requested by: Sandy Sayer
Contact: Mike McCoy
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Building wide HVAC study. We have been talking about this with Mike McCoy and Scott Jasper for some time and now we are ready to proceed in concurrence with the building plan for possible donor funded projects conducted by Sarah Lawrence and her team. It will be important to consider immediate needs while also thinking about possible future changes to the building.
BLACK-Rms 2019A, 2019, 2019B, 2025, 2029-382537-New Carpet
Construction
Building: Black Engineering Bldg
Room: General
Request date: 8/12/2024
Requested by: Sandy Sayer
Contact: Eric Ohrt
Construction start: 11/8/2024
Construction end: 5/9/2025
Description:
New carpet like the carpet we just ordered for all the offices on 2nd floor Black installed in 2019A, 2019, 2019B, 2025 and 2029
BLACK-Room 2103-Fume Hood
Budget Approval
Building: Black Engineering Bldg
Room: 2103
Request date: 7/16/2021
Requested by: Sandy Sayer
Contact: Alexa Peters
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
Install new fume hood with acid and flammables base cabinet
BRL- General-300944-Lighting Standard Study
Schematic Design
Building: Biorenewables Research Laboratory
Room: General
Request date: 8/4/2023
Requested by: Eric Zierke
Contact: Steve Larson
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Lighting - much of the existing lighting at BRL uses Lutron ballasts. These are hard to find, very expensive, and we should be replacing them with something else. The existing lighting controller is very questionable. No one in the business wants to work on it and tech support over the phone for our staff is a joke. The shops would like the electrical engineering staff to take a look at the entire lighting system and decide how we want to replace failed components moving forward. Additional questions can be directed to Aaron Moses
BY-1-General-356724-Accessible Restroom
Construction
Building: By-1 Agronomy Field Center
Room: General
Request date: 4/25/2024
Requested by: Mark Licht
Contact: Brady Streit
Construction start: 8/14/2024
Construction end: 12/2/2024
Description:
We are looking to get a project request to address restroom accessibility and accessible parking. We want to ultimately get an estimate of three phases.
First phase being immediate needs for 1 accessible restrooms.
Second phase how to best reconfigure bathroom space quantity and distribution to meet space and accessibility needs.
Third phase is for accessibility parking and entry to the facility.
Wesley Gee did a preliminary walk through o 4-24-24 to point out things to give consideration too.
No building
Location type: none
Additional location information: Field Extension Education Laboratory
1928 240th Street, Boone, IA
This is a ISU Ag & Natural Resources and ISU Research Farm facility
Work tags to attach: not available
BY-1-General-365087-ADA Parking Pads
Construction
Building: By-1 Agronomy Field Center
Room: General
Request date: 5/30/2024
Requested by: Alan Parnell
Contact: Brady Streit
Construction start: 8/26/2024
Construction end: 2/24/2025
Description:
ADA parking pads (One outside main entry and one outside east end main entry) plus stoops and sidewalk. LED lighting (remove old fixtures and put in new fixtures).
BY-1-GENERAL-369328-Replace Roof
Construction
Building: By-1 Agronomy Field Center
Room: General
Request date: 6/12/2024
Requested by: Lewis Parnell
Contact: Brady Streit
Construction start: 10/29/2024
Construction end: 4/29/2025
Description:
Roof on Field Extension Education field laboratory and Machine shed
BY-1-GENERAL-369329-Replace Doors and Handles in Classroom Building
Budget Approval
Building: By-1 Agronomy Field Center
Room: General
Request date: 6/13/2024
Requested by: Lewis Parnell
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
Replace doors and handles in classroom building and key alike keys
CAMPANI-General-354890-Package Unit Replacement
Construction
Building: Campanile
Room: General
Request date: 4/3/2024
Requested by: Wendy Kisch
Contact: Jennifer Warrick
Construction start: 10/22/2024
Construction end: 4/22/2025
Description:
The package unit in the Campanile needs to be replaced. James Long with FPM has details if needed.
CAMPUS-General-329512-Iowa DOT Directional Signs
Construction Documents
Building: Campus Grounds
Room: General
Request date: 12/7/2023
Requested by: Christopher Strawhacker
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Iowa DOT
Hire sign contractor to update directional signs along University BLVD to add "Ames National Laboratory" per drawings provided to Joe Stoberl. Temporary signs should be installed while panels are being updated.
Project will also include Iowa DOT costs for temporary and permanent changes to I-35 and Hwy 30 signage to include Ames National Laboratory. Campus Planning will coordinate with Iowa DOT.
CAMPUS-General-355081-Central Campus Flagpole Sidewalk & Pad
Project Closeout
Building: Campus Grounds
Room: General
Request date: 4/5/2024
Requested by: Brandice Latterell
Contact: Brady Streit
Construction start: 5/7/2024
Construction end: 9/19/2024
Description:
Rhonda Martin is aware of a request to install a sidewalk to the central campus flagpole, as well as install a concrete pad for a new bench. Rhonda will coordinate the order for the bench.
CARVER- 0210 & 0218-260003-Reconfigure Space
On Hold
Building: Carver Hall
Room: 0210
Request date: 2/20/2023
Requested by: Kris Kilibarda
Contact: Scott Jasper
Construction start: 5/7/2024
Construction end: 9/19/2024
Description:
Need to restructure some spaces in Carver 210 and 218 to allow for additional staff members and student gathering space.
CARVER-0150E-362902-New Workstation
Project Closeout
Building: Carver Hall
Room: 0150E
Request date: 5/17/2024
Requested by: Tessa Brow
Contact: Jennifer Warrick
Construction start: 7/26/2024
Construction end: 10/30/2024
Description:
We need to order furniture for another workstation in order to subdivide the 150E office into 2 office spaces while we await a more permanent solution to our space crunch. Here is what we'll need, and the details I could find about our existing furniture.
2019 Remodel Project # (when we ordered our current furniture that we want to match): PR021869/CP002559
Work Surface Laminate: Wilsonart Standard Laminate, Canyon Zephyr 4842-60, matte finish
List of needed items (with photos of existing items to match attached + model number included if I could find a tag):
Desk Chair (model RL-MHW.2.0.L.TCM23.UR94)
Standing Desk, 54" x 29"
Stationary Desk (that file cabinets can tuck under), 48" x 24"
2 Drawer File Cabinet (x2 needed)
3 Drawer File Cabinet
CARVER-0232-350959-Classroom Signage
Budget Approval
Building: Carver Hall
Room: 0232
Request date: 3/29/2024
Requested by: Kathleen Baumgarn
Contact: Denise Wulf
Construction start: 2/24/2025
Construction end: 8/25/2025
Description:
We have a classroom that needs new signage outside of the classroom. The sign needs to have braille with the room number and the word Classroom, also in braille.
The sign would say:
0232
Classroom
CARVER-0449-335469-Remodel
Construction
Building: Carver Hall
Room: 0449
Request date: 1/10/2024
Requested by: Anthony Palaszewski
Contact: Jennifer Warrick
Construction start: 5/1/2024
Construction end: 12/2/2024
Description:
Carver 449 - as part of future planned remodels, we may need to remove a whiteboard from this space. We need to organize with Rusty from AVX and look into getting a quote for labor costs associated with this task. This is planned to be done with LASCASTLE funds. The quote is needed by February 1st, but no labor will need to be done until Summer 2024.
4/10/24-Added Scope
Entire room patched and painted and there could be a potential ADA compliance issue also after Will met with them today.
CATT-0147-375331-New Desk
Project Closeout
Building: Carrie Chapman Catt Hall
Room: 0147
Request date: 7/3/2024
Requested by: Jennifer Owens
Contact: Jennifer Warrick
Construction start: 10/9/2024
Construction end: 11/19/2024
Description:
New desk for Rm 147
CATT-0223-368825-Furniture and AV Feedback
Construction Documents
Building: Carrie Chapman Catt Hall
Room: 0223
Request date: 6/5/2024
Requested by: Monic Behnken
Contact: Judy Dugan
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We would like a consultation to convert the room from office space to a strategic planning epi-center. We would need furniture and AV feedback.
CATT-0233-375329-New Desk
Construction
Building: Carrie Chapman Catt Hall
Room: 0233
Request date: 7/3/2024
Requested by: Jennifer Owens
Contact: Jennifer Warrick
Construction start: 10/9/2024
Construction end: 4/9/2025
Description:
New desk for 233
CATT-General-357904-Paint First Floor Hallways
Project Closeout
Building: Carrie Chapman Catt Hall
Room: General
Request date: 5/2/2024
Requested by: Kathleen Houseman
Contact: Jennifer Warrick
Construction start: 8/20/2024
Construction end: 10/14/2024
Description:
Repainting the first floor hallways.
CATT floor 1
Additional location information: First Floor
Work tags to attach: PG100169
CF-31-General-384136- Cold Storage Addition
Cost Range Approval
Building: Cf-31 Corn Yield Test Bldg
Room: General
Request date: 8/23/2024
Requested by: Lisa Coffey
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
Adding exterior cold room to an existing building (concrete, additional power, cold room structure, shelving for interior of cold room). Storage will need both humidity and temperature control
Additionally consider relocation of a current exterior cold room.
So there is the possibility of adding *new* in addition to relocation of a current unit
CO-LAB-1025-397487-Under Cabinet Lighting
Construction
Building: Roy J. Carver Co-Laboratory
Room: 1025
Request date: 10/22/2024
Requested by: Peter Lelonek
Contact: Eric Ohrt
Construction start: 10/23/2024
Construction end: 4/23/2025
Description:
Add 6 - 4' T8 under cabinet lights in areas above benches that do not currently have them. Connect into the adjacent fixtures for power.
COOVER- General-260249-Desks Replacement
Project Closeout
Building: Coover Hall
Room: General
Request date: 2/21/2023
Requested by: Lynne Dubert
Contact: Alexa Peters
Construction start: 7/14/2023
Construction end: 4/17/2024
Description:
We would like to have someone come to Coover hall and look at some old desks as we would like to order some new ones for some staff members.
COOVER-1129-356126-Faculty Office Furniture
Project Closeout
Building: Coover Hall
Room: 1129
Request date: 4/17/2024
Requested by: Lynne Dubert
Contact: Jennifer Warrick
Construction start: 5/3/2024
Construction end: 6/26/2024
Description:
We would like to order a new desk for this faculty member/office. Similar to the ones we had delivered in December. We would like a file cabinet, wire manager, and perhaps computer arms for the desk.
COOVER-1331A-384133- add mini-split to room.
Cost Range Approval
Building: Coover Hall
Room: 1331A
Request date: 8/23/2024
Requested by: Jason Boyd
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
I would like an estimate for adding a mini-split AC to this room. There is a CRAC unit in there now. This would be a backup, but also may need to replace the CRAC unit in the future. Thanks.
COOVER-2014-404813-Replace Laminate flooring
Schematic Design
Building: Coover Hall
Room: 2014
Request date: 11/19/2024
Requested by: Matthew Post
Contact: Eric Ohrt
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Rough cost range estimate to replace the laminate and or floor tiles in Coover 2014.
COOVER-2126-364983-Air Unit Replacement
On Hold
Building: Coover Hall
Room: 2126
Request date: 5/29/2024
Requested by: Lynne Dubert
Contact: Denise Wulf
Construction start: 2/19/2025
Construction end: 8/20/2025
Description:
We would like to request a quote on a newer air unit for this office. The current one is very loud and the professor is unable to hold any meetings in this room.
The worktag to use is PG101925
COOVER-2130-364846-New Air Unit
On Hold
Building: Coover Hall
Room: 2130
Request date: 6/7/2024
Requested by: Lynne Dubert
Contact: Denise Wulf
Construction start: 2/19/2025
Construction end: 8/20/2025
Description:
We would like to request a quote on a newer air unit for this office. The current one is very loud and the professor is unable to hold any meetings in this room.
COOVER-3038-382827- Additional Cooling Needed in Room
Cost Range Approval
Building: Coover Hall
Room: 3038
Request date: 8/13/2024
Requested by: Jason Boyd
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
The ARA research project is continuously expanding and adding servers and equipment that need cooling. This room is one of the research labs that needs to handle more, but does not have enough cooling capability. The professor would like to get some cost estimates for the different options for additional cooling for this room please (in-room, split, etc.).
COOVER-3121-372547-New Air Unit
On Hold
Building: Coover Hall
Room: 3121
Request date: 6/27/2024
Requested by: Lynne Dubert
Contact: Denise Wulf
Construction start: 2/9/2025
Construction end: 8/10/2025
Description:
We would like to request a quote on a newer air unit for this office. The current one is very loud and the professor is unable to hold any meetings in this room. The worktag to use is PG101925
COOVER-3222-364847-New Air Unit
On Hold
Building: Coover Hall
Room: 3222
Request date: 6/7/2024
Requested by: Lynne Dubert
Contact: Denise Wulf
Construction start: 2/9/2025
Construction end: 8/10/2025
Description:
We would like to request a quote on a newer air unit for this office. The current one is very loud and the professor is unable to hold any meetings in this room.
COOVER-Room 1219-Create Three Offices
Budget Approval
Building: Coover Hall
Room: 1219
Request date: 8/13/2021
Requested by: Jeremy Bowker
Contact: Alexa Peters
Construction start: 12/2/2024
Construction end: 12/2/2024
Description:
My supervisor, Sara Harris, would like to schedule an in person meeting to discuss this room and sound proofing it. I think this is something they wanted to move quickly on.
You can reach Sara at 294-1097, or me at 294-2664.
Adding Scope: Creating Three offices in order to Soundproof
CURTISS-0020-382674-Window Washing
Project Closeout
Building: Curtiss Hall
Room: 0020
Request date: 8/13/2024
Requested by: Marcy Cheville
Contact: Amy Tremain
Construction start: 8/22/2024
Construction end: 9/4/2024
Description:
We have 7 windows in 20 Curtiss Hall and 1 window in 19 Curtiss Hall that need to cleaned on the inside, outside and screens as well before the Fall 24 semester starts. Please provide me with a quote for cleaning.
CURTISS-0020-385285-New Furniture for waiting area
Cost Range Approval
Building: Curtiss Hall
Room: 0020
Request date: 8/28/2024
Requested by: Marcy Cheville
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
Dean Carmen Bain would like to purchase new furniture in the waiting area for 20 Curtiss Hall. I need to be directed to a catalog to select the furniture we need as well as give us a quote for furniture and shipping.
CURTISS-0139-342765-Signage
Project Closeout
Building: Curtiss Hall
Room: 0139
Request date: 2/16/2024
Requested by: Alicia Hauser
Contact: Joseph Stoberl
Construction start:
Construction end:
Description:
The Office of Research and Discovery is moving offices and will need to adjust the signage for offices 139A and 139D.
We have an existing large sign that will need to be moved from 139A to 139D, and the updated to the below:
0139D
Associate Dean
Associate Director
Iowa Agriculture and Home Economics
Experiment Station
The new sign for 0139A should be a small one that just says 0139A. Please let me know if you have any questions or need anything - I have the proofs from the last time we updated these signs if needed.
CURTISS-0210-375584-Change Nameplate
Project Initiation
Building: Curtiss Hall
Room: 0210
Request date: 7/8/2024
Requested by: Theressa Cooper
Contact: Joseph Stoberl
Construction start: 11/19/2024
Construction end: 5/20/2025
Description:
Change the nameplate on the outside of Suite 210 to - The Office for Collaborative Initiatives. This should also include the braille lettering
CURTISS-0210B-375628-Change Door Signage
Project Initiation
Building: Curtiss Hall
Room: 0210B
Request date: 7/9/2024
Requested by: Theressa Cooper
Contact: Scott Jasper
Construction start: 10/22/2024
Construction end: 4/22/2025
Description:
Change door signage to -
Dr. Theressa Cooper
Assistant Dean, Collaborative Initiatives
Note: Please include braille lettering
CURTISS-0224-230387-Furniture
Project Closeout
Building: Curtiss Hall
Room: 0224
Request date: 10/5/2022
Requested by: Suzanne Showalter
Contact: Jennifer Warrick
Construction start: 8/11/2023
Construction end: 4/17/2024
Description:
Curtiss 224 is a department classroom in Agriculture Education and Studies and we want to replace the furniture and chairs that are currently in the room with similar furniture. Same number of tables and chairs, same style, but newer as they are showing wear. No schematic design needed. Timeline We'd like to have this ordered prior to Spring Term beginning, so before January 1. Thank you.
CURTISS-C0047-396143-Repair Damaged Railing
Construction Documents
Building: Curtiss Hall
Room: C0047
Request date: 10/9/2024
Requested by: Justin Abbott
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
The space chosen is the closet stairwell, however this is outside walking directly outside on ground floor. There is a railing that on both sides has rusted to the point it's not touching the ground. This could be a safety issue.
CURTISS-GENERAL-375566-Window Cleaning
Project Closeout
Building: Curtiss Hall
Room: General
Request date: 7/8/2024
Requested by: Marcy Cheville
Contact: Amy Tremain
Construction start: 7/24/2024
Construction end: 8/8/2024
Description:
I need 8 windows cleaned inside and outside in Curtiss Hall:
33 Curtiss Hall - 1 window - need an estimate first
18 Curtiss Hall- 5 windows - need an estimate first - please ask what worktag and DD to charge to
15 Curtiss Hall - 3 windows - need an estimate first - please ask what worktag and DD to charge to
DESIGN-0038-390204-Soda Kiln on the Patio
Construction Documents
Building: College Of Design
Room: 0038
Request date: 9/16/2024
Requested by: Michael Miller
Contact: Mitchell Hlavacek
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We would like to reopen the discussion about placing a soda kiln on the patio outside of room 0038 design. The kiln is here now so we have a better idea about what to expect. The user wants to re-iterate that this is a non-permanent structure. It is just needed to protect the kiln from the weather. A suitable pre-fabricated structure has been identified. Although Mike Miller will be the contact for the billing, I would like you to work directly with Professor Ingrid Lilligren (the ceramics instructor). She will have the best information about location and needs.
Thanks.
DESIGN-0054A-349881-Lighting and Wall Covering Improvements
Construction
Building: College Of Design
Room: 0054A
Request date: 3/26/2024
Requested by: Michael Miller
Contact: Mitchell Hlavacek
Construction start: 11/12/2024
Construction end: 12/2/2024
Description:
we would like to get shades for room 054A, replace some water damaged wall covering in 054A and add track lighting similar to 054B
DESIGN-0077-391332-FCU Noise Control
Schematic Design
Building: College Of Design
Room: 0077
Request date: 10/23/2024
Requested by: Jeremy Thurlby
Contact: Mike McCoy
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Last year the FCU in this room was replaced, since then faculty teaching have complained that the room is too loud to teach in. So the unit has been turned off. Is there a way to add a rheostat to the unit to make the blower less loud? Or is there an option to change the controls to have the unit cycle on and off with the thermostat?
DESIGN-0111-341921-Remodel
On Hold
Building: College Of Design
Room: 0111
Request date: 2/7/2024
Requested by: Robert Whitehead
Contact: Denise Wulf
Construction start: 2/19/2025
Construction end: 8/20/2025
Description:
College of Design Reading Room (111) and miscellaneous first floor office space (158, 158A)
In fall 2023, we had engaged the services of an architecture firm, DLR, to help us understand the potential scope of this project. This project scope is limited to interior remodeling on our first floor of the College of Design. In particular the scope includes the remodeling of critical spaces for our ongoing operations and course work. The biggest project is the remodeling the former "Reading Room" space (Parks Library is shutting down operations and moving stacks out of the space) into design studios/classrooms. The first phase of this project will not involve any major demolition, extensive interior partitions, or changes in lighting, electrical, HVAC, sprinkler, or plumbing. It will simply involve new furniture, finishes, and AV installations which we can accomplish working directly with FPM. Eventually, we may have more extensive remodeling, based on what we identify as our long term use needs for this space--again, with the assistance of an architectural firm.
There are other smaller miscellaneous interior remodeling projects to support our ongoing recruitment efforts (e.g., convert existing mailroom to open space space/waiting space for visitors, relocating mailroom elsewhere). Minimal changes in interior partitions and doors are necessary but not HVAC, electrical, sprinkler, etc. This will not require architectural services outside of the scope that FPM can provide.
Schedule Considerations
The ideal schedule for our Reading Room project m! ay not be possible--it depends, in part, on the timing of when Library will have all items moved out of our Reading room space (Room 111). Ideally if they move out by May, we can begin spending some of these funds towards the immediate reconfiguring of the space for our first phase of work. Similar timing for the mail room reconfiguration. Additional funds would be spent in Fall 2024 and Spring 2025 for architectural servi
DESIGN-0111-378452-Install Transition Strip
Project Closeout
Building: College Of Design
Room: 0111
Request date: 8/1/2024
Requested by: Mitchell Hlavacek
Contact: Mitchell Hlavacek
Construction start:
Construction end:
Description:
Please install transition strip at the two entrances into room 111 and between the carpet squares and polished concrete floor. Date of floor polishing is uncertain at this time, but this work will likely need to be completed towards the end of the week of August 14th or the week of August 19th. Thank you!
DESIGN-0211-397750-Purchase and Install 27 AMQ chairs
Construction Documents
Building: College Of Design
Room: 0211
Request date: 10/24/2024
Requested by: Michael Miller
Contact: Carrie Choudhury
Construction start: 1/2/2025
Construction end: 7/3/2025
Description:
In room 211 they would like to purchase and install
27 AMQ chairs
example: https://www.amqsolutions.com/tizu?Style=Mesh%20Back&Arms=Armless&Finish=White%20With%20White%20Base&Seat%20Cushion=5F16
and 1 rolling acoustic white board
example: https://www.steelcase.com/products/whiteboards-accessories/textura-mobile/
Then the would like to have INSTALLATION only for
Carpet (carpet, base and threshold have already been donated)
An 80" TV (already purchased and in the room)
A glass whiteboard from Workspace (already purchased, in the room)
Remaining wall panels from 216 project.
Drawings are attached to this request.
Carrie, Angela Koppes would like to work with you to finalize this estimate and get the right color of chair.
DESIGN-0216-356477-Improvements
Project Closeout
Building: College Of Design
Room: 0216
Request date: 4/23/2024
Requested by: Michael Miller
Contact: Jennifer Warrick
Construction start: 7/26/2024
Construction end: 10/24/2024
Description:
We would like to add the following items to room 216.
Acoufelt wall treatment (please see attached quote). This just needs to be ordered. We do not need to have it installed
Tuneable light for room 216A (please see attached quote). We will need to have this installed with electrical and a switch.
4'x6' floating glass board. Specification is Clarus Float Glass Board, magnetic. Color: CBC-506 with a box tray. No color drop option. No installation.
DESIGN-0303-357744-Pipe Repairs
Project Closeout
Building: College Of Design
Room: 0303
Request date: 4/29/2024
Requested by: Justin Abbott
Contact: Jennifer Warrick
Construction start: 8/5/2024
Construction end: 10/23/2024
Description:
Heating copper pipe and heating fins are exposed, safety concern needs covers.
This started in the shops (WO 296674) with Scott Nibe, and has requested FDC take over.
DESIGN-0307-210142-Remodel
Construction
Building: College Of Design
Room: 0307
Request date: 7/26/2022
Requested by: Paul Bruski
Contact: Jennifer Warrick
Construction start: 4/24/2024
Construction end: 12/2/2024
Description:
This project would involve making room 307 or 326 in the College of Design into something like 4128 in SICTR (team workstations). My desire would be to have this up and running by Spring 2023. My hope would be also look at how to upgrade the finishes of the room as well (wall colors, lighting, etc).
DESIGN-General-355034-Domestic Water Heater Study
Construction Documents
Building: College Of Design
Room: General
Request date: 4/4/2024
Requested by: John Netwal
Contact: Mike McCoy
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Engineering review of the Domestic Water Heater and associated piping in Design for Code Compliance and safety. Mike McCoy, is familiar with some of the issues and I would like to have him take a closer look, develop a scope of work and cost range to bring this system into code and safety compliance to ISU standards. Please let me know if you have any questions.
DESIGN-R0125-272542-Lactation Room & Gender Neutral Bathroom
Project Closeout
Building: College Of Design
Room: R0125
Request date: 4/6/2023
Requested by: Michael Miller
Contact: Jennifer Warrick
Construction start: 10/6/2023
Construction end: 7/1/2024
Description:
We would like to investigate converting the men's restroom on the first floor into a lactation space and the women's bathroom (R0175) into a family/gender neutral bathroom.
DESIGN-Replace Air Handling Unit
On Hold
Building: College Of Design
Room: General
Request date: 9/8/2021
Requested by: John Netwal
Contact: Scott Jasper
Construction start: 10/6/2023
Construction end: 7/1/2024
Description:
We would like to initiate a PIR to address the following:
Replace the buildings Lower Level abandoned Unit Ventilator System with a new AHU system to provide fresh and tempered air throughout the space to current code and air exchange rates.
This concept was thought to be investigated previously on PR020675, but should be reviewed with the following FP&M representatives for proof of concept and design:
Scott Anderson
Mike Hanson
Scott Jasper
Brian Dangelser
Andrew Mott
Additional Notes:
FP&M may have new fan coil units available that could possibly be repurposed to fit this application and could be confirmed by contacting Andrew Mott.
DESIGN-Rooms 181, 181-1, C0502-Lighting
Project Closeout
Building: College Of Design
Room: General
Request date: 2/5/2021
Requested by: Michael Miller
Contact: Jennifer Warrick
Construction start: 5/30/2021
Construction end: 2/28/2022
Description:
Rooms 181, 181-1, C0502 Lighting
COST RANGE WILL BE PROVIDED
I HAVE TWO LIGHTING REQUESTS.
1. WE WOULD LIKE TO REPLACE THE TRACK LIGHTING SYSTEM IN DESIGN 0181 AND 0181-1 WITH PROGRAMMABLE/REMOTE LIGHTS. THIS WILL HELP ENSURE SAFETY AND HELP SHOW STUDENTS IN LIGHTING CLASSES DIFFERENT OPTIONS.
2. WE WOULD LIKE TO HAVE SOME ADDITIONAL LIGHTS PLACED ON THE FIFTH FLOOR AT THE TOP OF THE STAIRS IN THE REVIEW SPACE (C0502). STUDENTS AND FACULTY CAN'T USE THIS SPACE AFTER IT GETS DARK.
DESIRED COMPLETION DATE:
KNOWN TIME CONSTRAINTS: SUMMER 2021
DESIRED PROJECT COST:
FUNDING CONTACT: MILLER, MICHAEL C
Design-Rooms 503, 507, 511, 516, and 516A-323907-Remodel
Construction
Building: College Of Design
Room: 0503
Request date: 11/17/2023
Requested by: Michael Miller
Contact: Jennifer Warrick
Construction start: 8/6/2024
Construction end: 2/4/2025
Description:
Design 5th floor Studio; rooms 503,507,511,516
Most important in order
Patched flooring (some tripping hazards)
Exit signage, lights and crashbars
Sprinkling (if required)
Headers rebuilt
Drywall patched
Cabinets replaced (may be able to cut down on the number of sinks and cabinets…add tub type sinks with traps)
This project began in Famis Classic under PR018876-Design 5th floor Studio
DURHAM-0073-383244-Knock Out Wall
Construction
Building: Durham Center For Computation & Com
Room: 0073
Request date: 8/16/2024
Requested by: Lorrie Ludwig
Contact: Eric Ohrt
Construction start: 9/4/2024
Construction end: 3/5/2025
Description:
We are wanting to have the wall knocked out in this room to make it bigger.
DURHAM-0089-383245-Convert to Lab
Construction
Building: Durham Center For Computation & Com
Room: 0089
Request date: 8/16/2024
Requested by: Lorrie Ludwig
Contact: Eric Ohrt
Construction start: 9/4/2024
Construction end: 3/5/2025
Description:
We would like to have this room made so it can be used as a lab
DURHAM-0095-344753-Add IT Pod
Project Closeout
Building: Durham Center For Computation & Com
Room: 0095
Request date: 3/1/2024
Requested by: Robert Hade
Contact: Eric Ohrt
Construction start: 8/23/2024
Construction end: 8/26/2024
Description:
Add a new IT “pod” that needs dedicated cooling.
Data center staff has designed a new pod layout to support high end research equipment. The pod will need a dedicated cooling system to manage the heat load created by the equipment. We need to install ACRC301S in row coolers that will connect back to the CDU. The CDU will need to be connected into the chilled water loops that support the data center.
The CDU will connect to the in row with PEX pipe.
Equipment has not been purchased yet as we need to confirm with the chilled water techs that we can install this system as we have designed.
Please contact me if you'd like me to set up a meeting with the engineers on the APC side.
DURHAM-0139-383243-Office Remodel
Cost Range Approval
Building: Durham Center For Computation & Com
Room: 0139
Request date: 8/16/2024
Requested by: Lorrie Ludwig
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
We would like to remodel this office to accommodate the staff in 123, 226, 226A, 226AA, and 227 from Atanasoff. Please provide us with drawings to look at. Thank you!
PG101473
DURHAM-General-336677-Heat Exchanger Study
Construction Documents
Building: Durham Center For Computation & Com
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Brian Grove
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We would like to have the Engineering Team review the recent installation of the Heat Exchanger for code compliance and safety in the mechanical room and develop a detailed plan to correct any deficiencies found that could be shared with a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
DURHAM-GENERAL-365145-Office Relocation
Construction
Building: Durham Center For Computation & Com
Room: General
Request date: 5/31/2024
Requested by: Suzanne Fisher
Contact: Eric Ohrt
Construction start: 11/19/2024
Construction end: 5/20/2025
Description:
COM S will have their front door moving from Atanasoff to Durham. We toured the space on 5/30 with Carrie and Eric. The department chair is compiling a spreadsheet for a people move. They are requesting 2 project estimates. One for an initial move and another with more complex update and/or renovations. This impacts first floor south and 2 rooms in the lower level.
DURHAM-Information Technology Services-Design Standards Update
Building: Durham Center For Computation & Com
Room: General
Request date: 9/10/2019
Requested by: Michael Lohrbach
Contact: Michael Murray
Construction start:
Construction end:
Description:
E HALL-0203D-378149-Remove Blackboard-Paint-Carpet
Construction
Building: East Hall
Room: 0203D
Request date: 7/29/2024
Requested by: Renea Miller
Contact: Jennifer Warrick
Construction start: 9/25/2024
Construction end: 3/26/2025
Description:
Remove blackboard and tack strip from wall. Patch and paint walls.
Remove old carpet.
Paint room, new carpet. (Ceiling paint comes down on wall like current)
We have 6 bookshelves that need to be installed. Three are in room 5 (approx. 7 ft, 5 in), and three are in room 303E (over 10 ft). Need installed east wall. Would like these the same size.
Work cannot be done during the semester because of classes.
Walls—Sherwin Williams Pavilion Beige SW 7512
Baseboards, trim, and door—Sherwin Williams Summer White SW 7557
Ceiling—Sherwin Williams Extra White SW 7006
Carpet—Interface carpet tile collection = Open Air 404 #1633302500, Color = Granite #106751, 50cm x 50cm, non-directional installation method
Worktag: PG104347
E HALL-0311-371616-Structural and Technology Modifications
Construction
Building: East Hall
Room: 0311
Request date: 6/25/2024
Requested by: Renea Miller
Contact: Jennifer Warrick
Construction start: 10/23/2024
Construction end: 4/23/2025
Description:
Room 311 East Hall modifications. Coordinate structural and technology modifications to room 311. Will be using CASTLE and department funds to use on new equipment. Also need to get an updated quote to trim the size of the two posts in the middle of the room and hardware mounted to one wall. We would like to work on getting this done the week of December 16, 2024.
WORKTAGS FOR PROJECT
PG100127 DD02177 - $17,339.36
PG104352 – up to $55k
SG2705165 – up to $5k
EHSSB-1113-397701-Create Student Desk Space
Budget Approval
Building: Environmental Health And Safety Ser
Room: 1113
Request date: 10/24/2024
Requested by: Rajean Birkestrand
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
We would like to create student desk space in this room. Space for 4-5 students using leftover furniture pieces that we have in storage.
EHSSB-1210-375685-Fume Hood Replacement
Construction
Building: Environmental Health And Safety Ser
Room: 1210
Request date: 7/9/2024
Requested by: Nicole Brandon
Contact: Eric Ohrt
Construction start: 10/30/2024
Construction end: 4/30/2025
Description:
Requesting a quote for replacement of old Siemans fume hood controls with Accutrol controls in EHSSB rooms 1210, 1306, and 1255. EH&S was working with Brian Dangelser who conducted an onsite inspection of the fume hood controls that need to be replaced.
EHSSB-1230-350866-Remodel
Construction
Building: Environmental Health And Safety Ser
Room: 1230
Request date: 3/28/2024
Requested by: Anthony Romero
Contact: Jennifer Warrick
Construction start: 8/12/2024
Construction end: 2/10/2025
Description:
Procure and install glass whiteboards in EHSSB Learning Center—paint walls prior to whiteboard installation.
Added Scope 4/5/24
Adding AudioVisual
EHSSB-1400-336611-Remodel
Project Closeout
Building: Environmental Health And Safety Ser
Room: 1400
Request date: 1/22/2024
Requested by: Rajean Birkestrand
Contact: Jennifer Warrick
Construction start: 4/16/2024
Construction end: 8/23/2024
Description:
We would like to reconfigure the desk area space to make it more user friendly and to comfortably accommodate two work stations.
Updated Scope 2/8/24
This is actually built-in millwork with chemical resistant tops – essentially lab stations – in their chemical recovery space. It’s not so much a desk reconfiguration as tearing out the existing millwork (possibly recovering/reusing some cupboards if possible) and building in new.
ELINGS-1320-375538-New Door Sign
Project Initiation
Building: Elings Hall
Room: 1320
Request date: 7/8/2024
Requested by: Cynthia Frame
Contact: Joseph Stoberl
Construction start: 9/29/2024
Construction end: 3/30/2025
Description:
New door sign for 1320/1330 Elings. It is 12x12. The plastic broke
ENRL_SC-0214-403438-Order Standing Desks
Construction Documents
Building: Enrollment Services Center
Room: 0214
Request date: 11/6/2024
Requested by: Amber Tiarks
Contact: Judy Dugan
Construction start: 1/15/2025
Construction end: 7/16/2025
Description:
The Office of the Registrar is requesting design and four standing desks to be split between 2nd floor Room 214 and Ground Floor Room 010. The Registrar has requested these two projects and space improvements advance together. Thank you!
ESTES-0156-315860-Sign Frames
Construction Documents
Building: Simon Estes Music Hall
Room: 0156
Request date: 10/5/2023
Requested by: Lawrence Curry
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Sign shop to make two sign frames (we will change content) and mount with screws to concrete block wall in and next to room 156. Sign frames to measure 12.5 x 12.5 with plastic surface protecting content message.
Please use worktag PG109575. Thank you.
EXT 4-H-1104-405067- Convert Space
Schematic Design
Building: Extension 4-H Youth Building
Room: 1104
Request date: 11/21/2024
Requested by: Jennifer Grundmeier
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
There is a section of 1104 that we may want to convert to a meeting space or conference room, we would like some design ideas and an estimate for doing that.
EXT 4-H-1110-323061-Remodel
On Hold
Building: Extension 4-H Youth Building
Room: 1110
Request date: 11/6/2023
Requested by: Linda Young
Contact: Denise Wulf
Construction start: 2/19/2025
Construction end: 8/20/2025
Description:
Requesting Estimate to remodeling NE corner of the 4-H space, 1104.
Area next to 1110.
Want to look at squaring up that space and creating new workspace for suite 1110.
Please contact: Linda Young, lindakay@iastate.edu, 294-5273 or 515-291-8018.
EXT 4-H-1110-364965-Updated Flag Sign
Project Closeout
Building: Extension 4-H Youth Building
Room: 1110
Request date: 5/29/2024
Requested by: Linda Young
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
Updated Flag Sign for Hallway Door to 1110. New one needs to be:
Operations
Advancement
Professional Development
Program Development & Evaluation
Black w/white letters.
Needs charged on FY24 Budget Year.
FAM_CTR-General-356589-Exterior Sign
Construction Documents
Building: Isu Family Resource Center
Room: General
Request date: 4/24/2024
Requested by: Cristina Broshar
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Address on exterior sign needs to be updated to 2623 Bruner Drive, per city of Ames fire inspector.
FIN SVC-0101-344323-Handicap Entrance
Schematic Design
Building: Financial Services Building
Room: 0101
Request date: 3/6/2024
Requested by: Jeremy Paul
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Have conducted a site survey and discussed with Justin Abbott. Require a ramp and handicap entrance (ADA accessible) to admin building.
FIN SVC-0101-371659-New Furniture
Project Closeout
Building: Financial Services Building
Room: 0101
Request date: 6/25/2024
Requested by: Justina Sheets
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
Our department is needing some new furniture after an office remodel. We'd like to make Rm 0101 into a waiting area for customers.
FOOD SC- M0570-251222-PRV Vent Repair
Construction Documents
Building: Food Sciences Building
Room: M0570
Request date: 1/4/2023
Requested by: John Netwal
Contact: Mike McCoy
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
PRV feeding small section of FoodSc has only one Armstrong valve and is not properly vented. We need an engineer to determine what changes are necessary to correct these deficiencies (Mike and Brian know about this project)
FOOD SC-1333-390288-Update Carpet and Paint
Budget Approval
Building: Food Sciences Building
Room: 1333
Request date: 9/17/2024
Requested by: Jennifer Plagman-Galvin
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
Update carpet and paint, minor shops work (tear-out and patch/paint build-in cabinet) for the 1331-1339 office suite and one faculty office on the second floor. This is part of the overall LeBaron project faculty/staff moves. Please direct this project ATTN: Brady Streit.
FOOD SC-2591-368918-Investigate Creamery Freezer Updates
Cost Range Approval
Building: Food Sciences Building
Room: 2591
Request date: 6/7/2024
Requested by: Sarah Canova
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
As discussed in visit on 6/5, provide estimates to convert FSB#2591, #2568, and #1626A to freezers that would maintain -20F. Ideally, we would use only #2591 & #2568 as creamery ice cream freezers, but we'd like estimates for all 3 please.
FOOD SC-C1500-396887-Window repairs or replacement
Schematic Design
Building: Food Sciences Building
Room: C1500
Request date: 10/15/2024
Requested by: Abbott, Justin
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Examine windows to Courtyard in corridors C1130 and C1500. There are 16 windows. The exterior sills and the lower jambs are rotting beyond repair. The glazing compound contains asbestos, and the paint will need to be tested for lead. This will need to be turned into a Project.
FOOD SC-General-389656-conservation of the History of Dairying fountainhead
Schematic Design
Building: Food Sciences Building
Room: General
Request date: 9/11/2024
Requested by: Sydney Marshall
Contact: Brady Streit
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
I'm not sure if I filled in the above part correctly, but I am looking for a project manager to be assigned and a project created for the conservation of the History of Dairying fountainhead. Preferably the project manager would be Brady Streit, as he has already helped with the project. I would need a Worktag assigned to the project, and the beginnings of a project for ongoing repair and reinstallation over the next year or so.
Please contact me with other questions.
FORKER-0142-349895-Remodel
Construction
Building: Barbara E Forker Building
Room: 0142
Request date: 3/28/2024
Requested by: David Wells
Contact: Mick McBride
Construction start: 9/3/2024
Construction end: 1/31/2025
Description:
Cabinet repairs or replacement, replace flooring and update lighting.
142 Cabinets:
I’d like to request a quote for the following repairs:
1.) Replace all base cabinet doors and drawers throughout Forker 142. Many are water-damaged and non-functional. OR replacing the entire cabinets pieces.
2.) Replace the wooden sliding-doors on the upper cabinets with tempered glass sliding-doors.
142 Floors:
I’d like to request a quote for replacing the flooring and vinyl wall base throughout the Forker 142 lab space. Similar tile flooring is preferred.
Lighting:
I’d like to request a quote from the lighting maintenance team on replacing/updating lighting in Forker 142. I’d like to replace the current fluorescent bulbs with LED bulbs (and compatible ballasts).
Please note: Forker 142 is an active lab with ongoing scheduled research so consideration will have to be given to scheduling work within the space to avoid disruption to research activities.
FORKER-0194-399031-Clean Ceiling Vents
Schematic Design
Building: Barbara E Forker Building
Room: 0194
Request date: 10/31/2024
Requested by: David Wells
Contact: Brady Streit
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
The ceiling vents in this space have accumulated a lot of dust. I submitted a request for cleaning through FPM Service Desk and they recommended submitted to Projects.
FORKER-S0312-398707-Repair water damage to exterior walls
Schematic Design
Building: Barbara E Forker Building
Room: S0312
Request date: 11/7/2024
Requested by: Abbott, Justin
Contact: Brady Streit
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
previous water damage in exterior wall
FRILEY-2413-390274-Marketing Tour Room
Project Closeout
Building: Friley Residence
Room: 2413
Request date: 9/18/2024
Requested by: Julie Hartl
Contact: Mitchell Hlavacek
Construction start: 11/15/2024
Construction end: 11/18/2024
Description:
ATTENTION: Campus architects - Wes Gee and Dan Sloan
The attached project has been requested by Department of Residence, in an effort to continually improve the student experience in our facilities.
With a limited amount of work involved, the DOR plans to transform a former office and storage room, into a new marketing tour room. This will provide prospective student residents with a hands on, to scale, approachable demonstration room.
The goal is to transform descripted, distant housing concepts, into a physical form, accessible for visitors who may respond more readily within a built environment no longer requiring their imagination.
The work involved requires demolition of a portion of wall, removal of some wall mount electrical, an addition of a fire safety device, one portion of wall and new paint & flooring. No electric added. No changes to plumbing or hvac systems.
Project Management will be provided by DOR from the facilities improvements team.
Timeline projected to be approximately 3 to 4 weeks to complete work.
Construction documents completed. FP&M to review and coordinate State approval.
GEN SVC- General-182825-Fire Alarm Reporting System
Schematic Design
Building: General Services Building
Room: General
Request date: 4/19/2022
Requested by: Robert Currie
Contact: Mike McCoy
Construction start: 3/21/2026
Construction end: 9/19/2026
Description:
Indefinite scope consultant for feasibility study. Identify a fire alarm reporting system to replace the function metasys is doing now. Troy Carey with EH S and Christine Maduro can provide details, help answer questions. Use Account PG100365.
GEN SVC-0064-383993-Repair or replace support grates for pit
Budget Approval
Building: General Services Building
Room: 0064
Request date: 8/22/2024
Requested by: Barbara Steiner
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
The support grates used in the vehicle pit are starting to bend and need to be repaired or replaced.
GEN SVC-0113-403843-Convert 0113 to Single-Use Restroom
Schematic Design
Building: General Services Building
Room: 0113
Request date: 11/18/2024
Requested by: Brandice Latterell
Contact: Steven Daniels
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Convert 0113 office to a single-use restroom. Visit with Brandi to explore alternate locations.
GEN SVC-0128-265811-Print Services for Office Walls
Construction Documents
Building: General Services Building
Room: 0128
Request date: 3/8/2023
Requested by: Scott Jasper
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Print Services for office walls
GEN SVC-0195-361994-Remodel
Cost Range Approval
Building: General Services Building
Room: 0195
Request date: 5/2/2024
Requested by: William Spratt
Contact: Denise Wulf
Construction start: 2/26/2025
Construction end: 8/27/2025
Description:
Relocate breakroom/conference room. Turn old breakroom into an office.
GERDIN- General-213979-West Walkway Repairs
Construction Documents
Building: Gerdin Business Building
Room: General
Request date: 8/2/2022
Requested by: Chris Joens
Contact: Joseph Stoberl
Construction start: 12/2/2024
Construction end: 12/2/2024
Description:
West Granite Walkway outside of 1155. Talked with Barb Steiner about this briefly. Would like to get a quote for removing and releveling the walk, repairing broken walkway blocks, making any repairs to the heating system below (if needed).
GERDIN- General-265706-Wayfinding Signage & Panel Undergrad Office
Construction Documents
Building: Gerdin Business Building
Room: General
Request date: 3/7/2023
Requested by: Chris Joens
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Attn Joe Stoberl: We are wanting to update wayfinding signage in Gerdin - add additional wayfinding in the new addition to help visitors and students navigate the building. Will attach a list that we have identified, and would like to set up a meeting to discuss parameters and if we can work with ISU Printing to produce the signage.
6/12/2023 - Adding Scope
Install large panel outside the undergraduate office in the Gerdin Business Building
GERDIN-0160-391352-Remove lockers and replace with seating.
Cost Range Approval
Building: Gerdin Business Building
Room: 0160
Request date: 9/26/2024
Requested by: Chris Joens
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
We would like to remove the lockers on Ground Floor Gerdin, and replace with bench seating
GERDIN-0330-350961-Classroom Signage
Construction Documents
Building: Gerdin Business Building
Room: 0330
Request date: 3/29/2024
Requested by: Kathleen Baumgarn
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We have a classroom in Gerdin that needs new signage outside of the classroom. There are two doors into the classroom, so we will need two signs. Following is the information that needs to be on these signs. Please include braille on the sign.
0330
Skinner Classroom
GERDIN-1122-382790-Student Study Space
Construction Documents
Building: Gerdin Business Building
Room: 1122
Request date: 8/13/2024
Requested by: Chris Joens
Contact: Steven Daniels
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We're envisioning a space that is 1/3 computer lab and the remainder to be study space dedicated to the students. Part of the project is to rehome the tall tables and chairs from the Kingland Hub (1450 Gerdin)to help save on some furniture costs, but we would be looking at a pretty large remodel here. New flooring, paint, (potentially) lighting, and new furniture aside from the items we repurpose from Kingland.
GERDIN-1360-343405-Furniture
Project Closeout
Building: Gerdin Business Building
Room: 1360
Request date: 2/23/2024
Requested by: Chris Joens
Contact: Jennifer Warrick
Construction start: 5/28/2024
Construction end: 7/30/2024
Description:
We would like to get some additional seating to match what was purchased in summer 2021 - trying to maximize number of seats in this space. We would also like to get a credenza or shelving to match the side tables.
GERDIN-1420-392457-Cubicle Remodel
Cost Range Approval
Building: Gerdin Business Building
Room: 1420
Request date: 10/1/2024
Requested by: Chris Joens
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
We would like to price out the following options for this space:
-Adding two additional cubicles in the south portion of the space & higher cubicle walls on existing Allsteel pieces
-Enclosing the kitchen space to create additional office space
-optimizing office/cubicle space to seat 10-12 occupants
GERDIN-2148-382780-Rolling White Boards-Sound Dampening Panels
Construction
Building: Gerdin Business Building
Room: 2148
Request date: 8/13/2024
Requested by: Chris Joens
Contact: Jennifer Warrick
Construction start: 10/24/2024
Construction end: 12/2/2024
Description:
We would like to get some rolling white boards/sound dampening panels for this space. We saw some in 199 Parks Library that would be like what we want for this space.
GERDIN-2200-252852-Reconfiguration of Cubicle Spaces
Project Closeout
Building: Gerdin Business Building
Room: 2200
Request date: 1/19/2023
Requested by: Chris Joens
Contact: Jennifer Warrick
Construction start: 4/16/2024
Construction end: 7/11/2024
Description:
We would like to get cost range estimates and schematics reconfiguration of admin cubicle spaces in the Dean's Suite.
GERDIN-2372-362452-Gunlocke or Similar Furniture
Construction
Building: Gerdin Business Building
Room: 2372
Request date: 5/13/2024
Requested by: Chris Joens
Contact: Jennifer Warrick
Construction start: 6/28/2024
Construction end: 12/2/2024
Description:
We would like to get a budget estimate to outfit this space with Gunlocke (or similar) furniture like what is in the Dean's offices (2205, 2209, 2211). We previously started a project for this room with Leigh Wiand, and then scrapped the plans.
GERDIN-3155, 3361-398866-Remove Roll Carpet and Replace with Carpet Squares
Construction
Building: Gerdin Business Building
Room: General
Request date: 10/30/2024
Requested by: Christian Joens
Contact: Mitchell Hlavacek
Construction start: 11/12/2024
Construction end: 5/13/2025
Description:
We have two offices on 3rd floor (3155 and 3361) that we would like to remove the roll carpet and baseboard, and replace with carpet squares and new cove base. We have plenty of squares and base on hand, but need a contractor to remove, install, and they would need to bring glue.
The occupants of these two offices are serving in interim roles, and have other offices to work from while this work is being completed.
GERDIN-GENERAL-377216-7ft Cubicle Walls & Locking Doors
Budget Approval
Building: Gerdin Business Building
Room: General
Request date: 7/25/2024
Requested by: Chris Joens
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
We would like to get costs and drawings to purchase 7ft cubicle walls + locking doors for the following spaces on 3rd floor Gerdin: 3151, 3252, 3324. Pre-addition, we had the same sort of set up in these locations, but took down the walls and they are being used elsewhere now.
GILMAN-0309-398967-Replace Chiller
Schematic Design
Building: Gilman Hall
Room: 0309
Request date: 10/31/2024
Requested by: Ryan Braga
Contact: Eric Ohrt
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
We want to check the possibility to replace a chiller with chilled water. I spoke to Eric Ohrt about this today. This is tied to worktag account FSU 0000496. We are attempting to collect information about the total heat to be dissipated by this system.
GILMAN-1608-391341-Standing Desks for 1608B & 1608C
Schematic Design
Building: Gilman Hall
Room: 1608C
Request date: 9/26/2024
Requested by: Lauren Ramos
Contact: Eric Ohrt
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Occupants are in need of standing desks - please help to purchase standing desks for the following rooms: 1608B & 1608C.
GILMAN-1702-392124-1. Install Air Compressor and Air Dryer
Schematic Design
Building: Gilman Hall
Room: 1702
Request date: 9/27/2024
Requested by: Sarah Cady
Contact: Eric Ohrt
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
1. We are hoping to have a small air compressor and air dryer installed in 0500 Office and Lab.
2. There are copper air lines from 0500 O&L into 1708 Gilman. There is currently nothing connected on either end.
3. I am hoping to extend the copper tubing from 1708 into 1702 to connect to an existing pressure manifold to service an instrument.
4. I have attached an approximate diagram. In addition to the extension, a hole may need to be punched or expanded in the wall between 1702&1708. There are existing holes to accommodate radiator plumbing and some other utilities.
5. There are large, unshielded superconducting magnets in these rooms, so minimal metal equipment can be present in some places close to the work sites, and FP&M staff will need to consult with CIF staff regarding laboratory/magnet safety requirements when completing the work. Metal tools and soldering/sweating equipment is ok to use, but must be carefully placed where it is not too close to strong magnetic fields.
GILMAN-2216-266810-Remodel
Project Closeout
Building: Gilman Hall
Room: 2216
Request date: 3/20/2023
Requested by: Jonathan Kelly
Contact: Eric Ohrt
Construction start: 4/24/2024
Construction end: 6/28/2024
Description:
I need an estimate for renovations and some light construction (open cubicles) for Gilman 2216 along with furniture for using that space as a lab. I can send a configuration and list of furniture. Worktag PG103909 DD10954.
GILMAN-4055-356235-Motors for AHU17
Construction
Building: Gilman Hall
Room: 4055
Request date: 4/19/2024
Requested by: Donald Gregory
Contact: Eric Ohrt
Construction start: 6/4/2024
Construction end: 12/3/2024
Description:
We need to figure out how to get 2 new 75HP (SFA17A and SFA17B) motors for AHU17 into mechanical room 4055. Scott Nibe and Don Gregory can install once motors are in the room and can take out old motors in pieces. These motors will weigh roughly 900lbs. We have one motor in Chem Waste Storage that will be used. The other motor needed can be supplied through Reese Electric. Please talk with Scott and Don about motor specs and ordering.
GILMAN-General-336630-South Steam Venting Study
Construction Documents
Building: Gilman Hall
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Brian Grove
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We would like to have the Engineering Team review the Steam Venting from the Condensate Tanks in the South Mechanical Rooms for Code Compliance and develop detailed a plan to correct the deficiencies found that could be shared with either a contractor and in-house staff. An engineering probable cost estimate would be appreciated.
HACH-0204-356387-Lab Equipment Relocation & Electric
Bidding
Building: Hach Hall
Room: 0204
Request date: 4/22/2024
Requested by: Theresa Windus
Contact: Eric Ohrt
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
Modifications to both the 3rd floor lab (minimal, if any) and the basement lab regarding equipment that needs to be relocated from one floor to another at Hach Hall. The basement lab room 0204 spare electrical circuit availability in panels R2BF and R2BF (sec2) is very limited (8 open circuits total) for future use.
HACH-General-335892-Flood Damage Repair
Project Closeout
Building: Hach Hall
Room: General
Request date: 1/16/2024
Requested by: Michelle Lenkaitis
Contact: Eric Ohrt
Construction start: 11/8/2024
Construction end: 11/8/2024
Description:
Flood Damage Repair
HAMILTN-0001-362937-Phase 1 Room 0001 & Hallway
Construction
Building: Hamilton Hall
Room: 0001
Request date: 5/17/2024
Requested by: Kristi Angaran
Contact: Jennifer Warrick
Construction start: 9/9/2024
Construction end: 3/10/2025
Description:
In room 0001, build a wall and insert interior window.
HAMILTN-0002-375702-Phase 2 Room 0002
Schematic Design
Building: Hamilton Hall
Room: 0002
Request date: 7/9/2024
Requested by: Kristi Angaran
Contact: Steven Daniels
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
In room 0002, insert interior windows.
HAMILTN-0007C-392128- Remodel room into Satellite Radio Station
Schematic Design
Building: Hamilton Hall
Room: 0007C
Request date: 9/27/2024
Requested by: Kristi Angaran
Contact: William Scheller
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Wondering the costs of turning 0007C-1 into a satellite radio station.
HAMILTN-0107-389716-Standing Desks for 0107 & 0109.
Cost Range Approval
Building: Hamilton Hall
Room: 0107
Request date: 9/11/2024
Requested by: Jessica Hansen-Moench
Contact: Denise Wulf
Construction start: 3/6/2025
Construction end: 9/4/2025
Description:
We would like to get a standing desks for Hamilton Hall 0107 and Hamilton Hall 0109 (will submit a second request since this one only lets me choose one office). I was given permission to get cost estimates to see what that would entail for both offices. However, we don't have final authority to get new desks until we get the costs back. This would be coming through LAS Advising budget.
HAMILTN-0141-403351-ADA Compliant Bathroom
Schematic Design
Building: Hamilton Hall
Room: 0141
Request date: 11/6/2024
Requested by: Kristi Angaran
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
We want to make the handicap bathroom totally ADA compliant
HAMILTN-0211D-382533-Replace Carpet
Project Closeout
Building: Hamilton Hall
Room: 0211D
Request date: 8/9/2024
Requested by: Kristi Angaran
Contact: Jennifer Warrick
Construction start: 9/17/2024
Construction end: 11/11/2024
Description:
Price to replace carpeting in office
HILTON-General-377042-Relocate Statue
Project Initiation
Building: Hilton Coliseum
Room: General
Request date: 7/23/2024
Requested by: Andrew Kautman
Contact: Brady Streit
Construction start: 10/15/2024
Construction end: 4/15/2025
Description:
To relocate the Johnny’s statue in Spring 2025. Location TBD by Athletics.
Attn: Jon Harvey and Steve Nelson as they have been involved in these discussions.
HILTON-General-389810-Evaluate for Additional Power Outlets
Project Closeout
Building: Hilton Coliseum
Room: General
Request date: 9/12/2024
Requested by: Andrew Kautman
Contact: Brady Streit
Construction start:
Construction end:
Description:
Can you submit a project request to FPM to evaluate addition of power outlets for additional ice cream machines on the concourse at Hilton.
HILTON-General-390128-South Exterior Stairwell of Hilton Coliseum
Project Initiation
Building: Hilton Coliseum
Room: General
Request date: 9/16/2024
Requested by: Andrew Kautman
Contact: Brady Streit
Construction start: 12/25/2024
Construction end: 6/25/2025
Description:
Can you please submit a capital project/service request to repair and/or replace the south exterior stairwell of Hilton Coliseum.
Please also request to close CP1195000
HILTON-General-397196-Investigate Hilton Concrete Floor Cracks
Budget Approval
Building: Hilton Coliseum
Room: General
Request date: 10/23/2024
Requested by: Andrew Kautman
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
ATTN BRADY STREIT:
PLEASE WORK WITH MILES PANKONEN TO INVESTIGATE HILTON CONCRETE FLOOR CRACKS ON SOUTH SIDE INNER AND OUTER CONCOURSE
HIXSON-1060-355151-Remodel
Construction
Building: Hixson-Lied Student Success Center
Room: 1060
Request date: 4/5/2024
Requested by: Josie Irwin
Contact: Jennifer Warrick
Construction start: 8/23/2024
Construction end: 2/21/2025
Description:
We are looking at updating our reception space in the main SAS office and wanted an opinion about what options there were for the space. Ideally, we would like to reuse most of the front desk, remove the unused section by the big windows, and add privacy pieces to the desk to hide the cords. We would also like to move the desk to the other side of the room, but it is a wired-in desk. We think the entire process would include repainting one of the walls, adding a decal to the wall, taking apart and moving the reception desk and wiring it in a different spot, getting additional privacy desk pieces, and potentially replacing the carpet as it may be unusable under the desk (but we are not sure).
HIXSON-1080A-362506-Reconfigure Office + Soft Seating
Project Closeout
Building: Hixson-Lied Student Success Center
Room: 1080A
Request date: 5/13/2024
Requested by: Allison Severson
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
Leah would like to re-configure office space to add some soft seating for students. We will need to have an estimate of cost before completing the work, though.
Work tags to attach: PG100063, DD02188
HOOVER- Room 2268-363548- Remodel
Project Closeout
Building: Hoover Hall
Room: 2268
Request date: 5/20/2024
Requested by: Ryan Braga
Contact: Eric Ohrt
Construction start:
Construction end:
Description:
I was asked to submit a project request to establish an estimate of cost, timeline and overall feasibility of requested project. The PI and Dept chair would like me to obtain even a broad estimate quickly in order to facilitate other discussions and planning related to the relocation of equipment. A brief discussion of this proposed project in the near term would help me greatly
Overview:
The MSE dept is attempting to bring together additive manufacturing and related equipment in a central lab space. The only area Engineering could offer us at this time is a computer classroom (Hoover 2268) located behind other computer labs. The room is a challenging space to convert into a lab space dealing with large laboratory and metal printing equipment, specific electrical demands and other utilities and supplies. The room access is also an issue as at least one of the pieces of equipment will require more than a normal door width. The stated required height of one of the instruments poses a further challenge.
Electrical requirements:
Freemelt – 3 phase, 16 Amp, 400 Volt, Transformer 15 kVA, 22A, 380V, Y (wye) configuration
Install document states the transformers that meet these requirements are ;
a. TEMco Euro Standard Transformer TT1021 – 15 kVA
b. Marcus Transformer MTH15H6-20
But that other transformers may be used as per install document
Additional connection details in install document.
Powder Bead Fusion system – single phase, 12.5 amp, 230volt
Other listed equipment at this time states 120v15A service but I am currently unsure of the total current requirements for the 120V service to the room.
Space requirements:
Most of the issues with the space requirements are tied to the Freemelt system. The size of the equipment is 6.1 ft deep by 7.38 ft wide by 9.28 ft tall. clearance for operation according to the install document is 21 ft long, and 12.79 ft tall for “Instillation Service.”
The ceiling is 9 ft 8 Inches
HOOVER-1203-371406-Urinal Issues
Construction
Building: Hoover Hall
Room: 1203
Request date: 6/24/2024
Requested by: Lyle Bishop
Contact: Eric Ohrt
Construction start: 10/25/2024
Construction end: 4/25/2025
Description:
Original WO#303474.
The 1st and 2nd-floor men's restrooms in Hoover have issues with the way the urinal plumbing is configured. If all three urinals are flushed at approximately the same time, the lowest urinal backs up due to water from the other two flowing downhill into that urinal. Basically the other two urinals have their output tied together, which connects to the output from the lowest urinal, and the combined flow is then wyed into the drain line. This configuration causes the lowest urinal to overflow each time this synchronized flushing occurs, and there is always water from the urinal on the floor in these two men's restrooms now that classes are in session. Rotorooting the lowest urinal has been the thing done in the past, but changing the plumbing so the higher two urinals don't feed together into the output from the lowest urinal would be the only permanent fix that I can see. If there were separate connections from the higher two urinals to the main drain line that were slightl!
y downstream from where the lowest urinal connects to the drainline, it should prevent the water from backflowing into the lowest urinal.
HOOVER-1233-282482-Furniture
On Hold
Building: Hoover Hall
Room: 1233
Request date: 5/30/2023
Requested by: Sandy Sayer
Contact: Scott Jasper
Construction start: 10/25/2024
Construction end: 4/25/2025
Description:
New furniture for graduate student space in half of 1233 Hoover Hall.
HOOVER-1233-378584-Central Lab Space
Construction Documents
Building: Hoover Hall
Room: 1233
Request date: 8/1/2024
Requested by: Ryan Braga
Contact: Steve Larson
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
The MSE dept is attempting to bring together additive manufacturing and related equipment in a central lab space. The Engineering in now offering Hoover 1233
The room will need a wider door access, we are suggesting the south door. Removal of carpet. No need for additional furniture
Electrical requirements: Freemelt – 3 phase, 16 Amp, 400 Volt, Transformer 15 kVA, 22A, 380V, Y (wye) configuration Install document states the transformers that meet these requirements are ; a. TEMco Euro Standard Transformer TT1021 – 15 kVA b. Marcus Transformer MTH15H6-20 But that other transformers may be used as per install document Additional connection details in install document.
Powder Bead Fusion system – single phase, 12.5 amp, 230volt
Other listed equipment 120v15A
Freemelt system. is 6.1 ft deep by 7.38 ft wide by 9.28 ft tall. clearance for operation according to the install document is 21 ft long, and 12.79 ft tall for “Instillation Service.” The stated required height of one of the instruments could be resolved by removing part of the suspended ceiling. This may not need to be left open after equipment install.
HOOVER-2255-383231-Purchase 40 Chairs
Cost Range Approval
Building: Hoover Hall
Room: 2255
Request date: 8/16/2024
Requested by: Benjamin Johns
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
I am looking to purchase additional chairs for Hoover 2255 and 2264. These chairs would be Hon Ignition chairs to match what exists in Hoover 2260 and 2268. We are looking for a cost estimate for 40 chairs. Thanks!
HOOVER-3344-385634-Extend Process Water Loop on South Wall
Construction Documents
Building: Hoover Hall
Room: 3344
Request date: 9/3/2024
Requested by: Thomas Ales
Contact: Eric Ohrt
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Would like the process water loop on the South Wall of 3344 to be extended into 3354. We would like a quote for the work prior to starting work.
HOOVER-3347-363637-electrical outlet added to ceiling near center of room.
Construction Documents
Building: Hoover Hall
Room: 3347
Request date: 5/21/2024
Requested by: Ryan Braga
Contact: Eric Ohrt
Construction start: 1/17/2025
Construction end: 7/18/2025
Description:
electrical outlet added to ceiling near center of room.
HOOVER-3362-362215-Relocate Electrical Outlet + Freemelt
Project Closeout
Building: Hoover Hall
Room: 3362
Request date: 5/13/2024
Requested by: Ryan Braga
Contact: Eric Ohrt
Construction start: 3/20/2025
Construction end: 10/17/2025
Description:
Installation of electrical hookup. relocation of electrical outlet.
Freemelt project requirement - 3 phase 16 amp 400volt transformer 15 kVA, 22A, 380V, Y (wye) configuration for as yet undetermined location near center of room
relocation of outlet next to hood moved to near southeast window. The old outlet can be left in place or a new wire can be run. destination should be near southeast window panel to the east of pillar
HORSE B- General-273201-Remodel into Breeding Area
On Hold
Building: Horse Barn And Machine Shed
Room: General
Request date: 4/14/2023
Requested by: Nicole Ferwerda
Contact: Scott Jasper
Construction start:
Construction end:
Description:
Request a meeting with someone to determine cost and structural feasibility of removal of west barn tie stalls to create room for a modern breeding area, connection of the west barn through overhead door to the machine shop, insulation and flooringdrains.
HOWE-0638-143899-Electrical & Air Connections
Construction
Building: Howe Hall
Room: 0638
Request date: 11/29/2021
Requested by: Carolyn Riedel
Contact: Eric Ohrt
Construction start: 5/18/2023
Construction end: 12/2/2024
Description:
The AERE E Composites Lab located in 0638 Howe Hall has ordered a new autoclave to be constructed. The company has sent preliminary design drawings. I would like to have someone look over the drawings to make sure the electrical and air connections as well as a possible route to the fume hood will work as is or if the drawing sent will need to be modify
HOWE-1200-363269-New Cubicles, Ceiling, Lighting
Project Closeout
Building: Howe Hall
Room: 1200
Request date: 5/19/2024
Requested by: Arlene Grebasch
Contact: Eric Ohrt
Construction start:
Construction end:
Description:
New cubicles, reconfigured for better appearance and usability. More welcoming upon entry with better separation to the back office. At least 2 fully enclosed cubes. Drop ceiling to be extended to outer walls, all new ceiling tiles and possibly new lighting included - Hoping this portion could be done this summer. with reconfigured cubes to follow as scheduling allows.
HOWE-1200A-341359-Office Furniture
Construction
Building: Howe Hall
Room: 1200A
Request date: 2/2/2024
Requested by: Arlene Grebasch
Contact: Eric Ohrt
Construction start: 5/13/2024
Construction end: 12/2/2024
Description:
The new chair will need updated furniture for his office. Wall of wooden shelves with a matching rectangular desk in front and a seating area. Please provide some options to share with him. Wayne Chen
HOWE-1226-348451-Door Sign Replacement
Construction Documents
Building: Howe Hall
Room: 1226
Request date: 3/7/2024
Requested by: James Wellman
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
The door sign has gone missing.
HOWE-1380-342860-Remodel
Project Closeout
Building: Howe Hall
Room: 1380
Request date: 2/16/2024
Requested by: Arlene Grebasch
Contact: Eric Ohrt
Construction start: 8/22/2024
Construction end: 10/17/2024
Description:
We need to clear space for construction in Howe 1380 for the NEWRITE project. See attached list of progression of items involved. Upgrading lab 0224 space to move senior design academic lab from 1365 to allow wind tunnels to be move to current academic lab space 1385 and prep 1380 WiST lab for construction of a prototype tornado simulator. It is important that we progress in the correct order and have a good plan of how things will work.
See G Drive Folders & LX Folders for details.
HOWE-2345-375823-Lessening Noise in Offices
Construction Documents
Building: Howe Hall
Room: 2345
Request date: 7/10/2024
Requested by: Arlene Grebasch
Contact: Mitchell Hlavacek
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We would like to conduct an experiment to lessen the noise between faculty offices. Before insulating all the offices, we'd like to insure this will fix the noise issue by having insulation blown in to 1 wall between office 2345 and 2343, If the holes are drilled near the ceiling, the insulation will be able to settle and still be a good barrier. Also, by making the holes up very high, less cosmetic work will be necessary due to existing drop ceiling. We are interested in the noise lessening but also doing this as economically as possible.
HOWE-2620F-396968-Order sitting standing desk
Project Initiation
Building: Howe Hall
Room: 2620F
Request date: 11/6/2024
Requested by: Alyssa Stafne
Contact: Eric Ohrt
Construction start: 2/14/2025
Construction end: 8/15/2025
Description:
Would like to order a sitting/standing desk for this office.
Additional location information: Jenn Good's office
Work tags to attach: PG103370
HOWE-2624-304030-Lighting and Furniture
Construction
Building: Howe Hall
Room: 2624
Request date: 8/25/2023
Requested by: Sara Marcketti
Contact: Eric Ohrt
Construction start: 4/26/2024
Construction end: 10/25/2024
Description:
We have worked with Leigh Wiand and Troy Bowers on additional lighting for our space post remodel. We would like to complete that additional lighting request at this time.
4/2/2024 - Added Scope
Please add Furniture to the project.
HOWE-GENERAL-385820-install an electrical outlet to be used for a bird repellent system
Construction Documents
Building: Howe Hall
Room: General
Request date: 9/3/2024
Requested by: Arlene Grebasch
Contact: Eric Ohrt
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We need to locate and get pricing to install an electrical outlet to be used for a bird repellent system from the east side of Howe Hall including the bridge between Howe and Hoover. We expect the best place would be on top of the walkway very close to Howe Hall.
HOWE-Room 1380A-Ice Tunnel Compressor Replacement
Construction
Building: Howe Hall
Room: 1380A
Request date: 10/26/2021
Requested by: James Benson
Contact: Eric Ohrt
Construction start: 8/26/2024
Construction end: 2/24/2025
Description:
Want to replace compressor and controls for icing tunnel
HOWE-Various Offices-363267-Furniture for Various Rooms
Construction
Building: Howe Hall
Room: 2247
Request date: 5/19/2024
Requested by: Arlene Grebasch
Contact: Eric Ohrt
Construction start: 8/23/2024
Construction end: 2/21/2025
Description:
I need to order furniture for the remaining aerospace academic offices. Following are the configurations by office based on the attached basic layout.
HOWE2355 Wayne Chen (chair) - U shape with Standing desk, pencil drawer and 2 storage peds (1 3 drawer, 1 2 drawer)
HOWE2231 Unoccupied - L shape (door opens Left), pencil drawer, 1 -3 drawer storage ped. no monitor arms no standing
HOWE2247 Unoccupied - L shape (door opens Left), pencil drawer, 1 - 3 drawer storage ped, no monitor arms no standing
HOWE2251 Unoccupied - L shape (door opens Left) pencil drawer, 1 - 2 drawer storage ped, no monitor arms no standing
HOWE2331 Stephen Holland - waffling - U shape, pencil drawer, no storage, no arms no standing
HOWE2339 Peter Sherman - U shape (door opens right), inc. pencil drawer and 2 storage peds with 2 drawers each - no monitor arms, no standing
HOWE2621 Tyler Hoenig - 2 monitor arms (1 set) only
HUB- General-245941-Bike Parking Replacement
Project Closeout
Building: Hub
Room: General
Request date: 12/6/2022
Requested by: Mark Miller
Contact: Jennifer Warrick
Construction start: 9/11/2023
Construction end: 8/20/2024
Description:
This project removes and replaces bike parking near the Hub.
HUB-A-378219-Roof Repairs Due to Tree Damage
Construction Documents
Building: Hub
Room: A
Request date: 7/30/2024
Requested by: Scott Jasper
Contact: Nathan Graves
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Roof repairs due to recent tree damage. Scope includes structural engineering.
Initially, Mark Huss and Nate Graves will be coordinating this work.
IM TWRS-General-377117-Tennis and Basketball Court Renovation Study
Schematic Design
Building: Intramural Storage - South Towers
Room: General
Request date: 7/25/2024
Requested by: Garry Greenlee
Contact: Joseph Stoberl
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Recreation Service would like a study conducted to renovate the Resident Hall TOWERS tennis and basketball courts. There are currently 3 abandon tennis courts and to the south were multiple basketball hoops. We are looking at both locations to renovate into tennis/pickleball and basketball. The surface needs to be examined to see if it is suitable to resurface or if a new surface would be required. Our hope is that they both can be used and resurfaced. Resurfacing needs to accommodate tennis/pickleball. The design needs to accommodate tennis first, then incorporate pickleball as much as possible into the design. As many pickleball courts as possible should be laid out. Basketball will be around the perimeter . Tennis nets/poles need to be included. Additional pickleball nets/poles may be needed. Adjustable basketball hoops need to add. The perimeter should be 15-20' high netting (NOT CHAIN LINK FENCE). Relocate LED lights (4 poles worth) from Forker Tennis to the north 3 tennis courts at the Towers location. Alternate 1 would be lights on the south Towers area. Include cost as an alternate to demo the current Forker Tennis courts and restore to a grass space.
IMODAL-General-317512-Update Exterior Monument Signs
Bidding
Building: Ames Intermodal Facility
Room: General
Request date: 10/26/2023
Requested by: Mark Miller
Contact: Joseph Stoberl
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
Please update two exterior monument signs at Ames Intermodal Facility. The revisions are: fabricate new sign panels, without “BURLINGTON TRAILWAYS”, and move “EXECUTIVE EXPRESS” up.
The signs are slightly different. One has push through lettering, the other does not. Both signs have cut out letters, are double sided and have lighting.
The Hayward Ave sign (main sign, photo below) – see attached shop drawing for this sign.
The aluminum panel is 94”W x 22”H x 0.125”
Paint: Matthews Satin Aluminum
4” letters cut out.
The Sheldon Ave sign – we do not have shop drawing for this sign, assume it’s the same text style and panel thickness as above.
The aluminum panel is 70”W x 18”H x 0.125”
Paint: Matthews Satin Aluminum
4” letters cut out.
KILDEE- General-208569-Condensate Evaluation and Reconfiguration
Cost Range Approval
Building: Kildee Hall
Room: General
Request date: 7/19/2022
Requested by: John Netwal
Contact: Scott Jasper
Construction start: 3/24/2025
Construction end: 9/22/2025
Description:
Kildee condensate system needs to be evlauated and redesigned. There are system failures caused by improper designinstallation.
KILDEE-0005-350757-Furniture and Access
Cost Range Approval
Building: Kildee Hall
Room: 0005
Request date: 3/27/2024
Requested by: Cory Walker
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
This project will remodel furniture and door access to existing Rm 0005.
Project scope revised 9/10/24 per Cory Walker.
KILDEE-0105-363155-Room Capacity Sign
Project Closeout
Building: Kildee Hall
Room: 0105
Request date: 5/19/2024
Requested by: Kathleen Baumgarn
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
A new room capacity sign needs to be made and installed in Kildee 0105. The room capacity is 58.
Thank you. Katie B.
KILDEE-1204-323008-Tables
Construction
Building: Kildee Hall
Room: 1204
Request date: 11/3/2023
Requested by: Cory Walker
Contact: Amy Tremain
Construction start: 8/21/2024
Construction end: 2/19/2025
Description:
Look at options for different tables. Current tables are 4' x 10' - Qty. 15. Looking at possible narrower tables to increase seating capacity. Not determined at this time if seating would be changed or not.
KILDEE-General-336651-PRV Study
Construction Documents
Building: Kildee Hall
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Brian Grove
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We would like to have the Engineering Team review the recently installed PRV for code compliance and safety in the mechanical room and develop a detailed plan to correct any deficiencies found that could be either shared with a contractors or in-house staff. An engineering probable cost estimated would be greatly appreciated.
KILDEE-M0026-293580-Concrete Floor Drain Repair
Construction Documents
Building: Kildee Hall
Room: M0026
Request date: 7/7/2023
Requested by: Brady Streit
Contact: Brian Grove
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
High Priority - This came from FPM Building Maintenance
Kildee Hall - Mechanical Room 0026 - Center floor drain is plugged and needs cleaned out with drain cleaning machine/snake.
Drain issue that needs to be turned into a project. We are unable to clear this drain and when we plunge it water comes up around electrical conduits in the vicinity. This leads us to believe that we have a deteriorated pipe under the concrete. This will require a plumbing contractor that has the capability to demo concrete, make the repairs, and replace the concrete. Ben Adams has extensive knowledge about this problem and claims that it has been turned in as a project before.
KILDEE-M0270-389941-Install water heater
Construction Documents
Building: Kildee Hall
Room: M0270
Request date: 9/13/2024
Requested by: Lyle Bishop
Contact: Brian Grove
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Install double wall water heater and separate the processed water from domestic water. See Brian Grove for further information.
KING PV-0735-390908- Make Windows operable.
Schematic Design
Building: King Pavilion
Room: 0735
Request date: 9/23/2024
Requested by: Jeremy Thurlby
Contact: Troy Bowers
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Sending to the Projects Desk - Beyond the scope of the Shops.
We would like have someone out to take a look at windows around the roof line. They use to be operated by a switch on the wall. The system had issues before and fpm took out the switch to control them. We are receiving complaints that kp is too now since we cant open them. So we would like to know what needs to happen to make them operational again.
KING PV-0756-245641-Remodel
On Hold
Building: King Pavilion
Room: 0756
Request date: 12/2/2022
Requested by: Michael Miller
Contact: Scott Jasper
Construction start: 2/19/2025
Construction end: 8/20/2025
Description:
We would like to replace desks and chairs in this room. Desks: 54"x30" height adjustable (manual) with butcher block tops. Chairs: height adjustable to desks, no arms
Review storage space in the current area. This will encompass the west side of the King Pavilion on the lower floor.
Will want to add monitors at some point so electrical plan needed also.
KINGLND-0234-376922-Strategic Relations and Communications
Construction
Building: Kingland Campus Properties, Llc.
Room: 0234
Request date: 7/23/2024
Requested by: Jacy Johnson
Contact: Jennifer Warrick
Construction start: 11/15/2024
Construction end: 5/16/2025
Description:
Please contact Jacy Johnson (515-294-5672) to discuss the following changes to the Strategic Relations and Communications space in the Kingland Building.
Room 234 - shift reception station closer to the main entrance; add 2 hoteling stations along the back wall
Room 225 - order new furniture to create a private office
Workspace 226 - Extend partitions to the ceiling; utilize existing furniture if possible
KINGLND-GENERAL-365141-Offices, Workstations, and Collaboration Space
On Hold
Building: Kingland Campus Properties, Llc.
Room: General
Request date: 5/31/2024
Requested by: Amber Miller
Contact: Denise Wulf
Construction start: 11/15/2024
Construction end: 5/16/2025
Description:
General breakdown of needs for 20 estimated staff:
- 2 to shared private office (current conference room 0238)
- 3 to manager workstations, add doors if possible
- 15 remaining open office, if allocated by percentage, 10 in office workstations and 5 remote/hotel type?
- The open nook as collaboration space, assuming that there will be a hard wall built to enclose (w/a glass door or semi glass door)?
KS DINE-General-342212-Exterior Building Signage
Construction Documents
Building: Knapp-Storms Dining Complex
Room: General
Request date: 2/10/2024
Requested by: Michael Harwood
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Please remove "Dining" from Knapp Storms Dining Complex to Knapp Storms Building. Chris Strawhacker has information on this.
We would appreciate the final invoice once the work is complete.
Please use: PG109797
L A- General-289829-2nd Floor Lighting
On Hold
Building: Landscape Architecture
Room: General
Request date: 6/26/2023
Requested by: Tony Thrush
Contact: Scott Jasper
Construction start: 12/26/2024
Construction end: 6/26/2025
Description:
Install Carpet on the first floor plus in the following rooms 0204, C0100, C0200, and C0210.
4/22/2024 - Change in Scope
Tony with the Daily is not going to do this carpet project any more but is going to switch gears and consider new lighting. ISU Daily 2nd floor Open office lighting - switch ceiling mounted light fixtures to low profile led fixtures.
L A-General-338224-Fire Escape Repairs
Construction Documents
Building: Landscape Architecture
Room: General
Request date: 1/30/2024
Requested by: John Netwal
Contact: John Byerly
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Fire Escape Repairs - The Inspection Report is in the LX Folder and G Drive folder.
L A-General-376777-Vinyl Window Graphics
Project Closeout
Building: Landscape Architecture
Room: General
Request date: 7/19/2024
Requested by: Tony Thrush
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
Print and install vinyl window graphics for Iowa State Daily and Model Farm - place adhesive vinyl at each of the three doors to the building (south, west and north).
L MECH-0305-381926-Repair Walls
Construction
Building: Laboratory Of Mechanics
Room: 0305
Request date: 8/14/2024
Requested by: Sandy Sayer
Contact: Eric Ohrt
Construction start: 9/25/2024
Construction end: 3/26/2025
Description:
I am going to attach some pictures of the wall that is crumbling and cracked in this office. The current faculty member is leaving the university August 15. The office will be cleared out right after. That would be a good time to get it repaired before the next faculty person moves in.
LAGOMAR-0201-318381-Remodel into Grad Spaces
Project Closeout
Building: Lagomarcino Hall
Room: 0201
Request date: 10/30/2023
Requested by: Jennifer Plagman-Galvin
Contact: Alexa Peters
Construction start:
Construction end:
Description:
ATTN: Leigh Wiand and Stephanie Hosier
Transition 172 and 201 Lago into grad student spaces for HDFS, SOE and other CHS departments. Some patch/paint and desk layout. Reuse/purchasing of panels may be needed as well.
LAGOMAR-0530-404954-New Furniture
Schematic Design
Building: Lagomarcino Hall
Room: 0530
Request date: 11/20/2024
Requested by: Heather Rouse
Contact: Carrie Choudhury
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
we want to order new furniture for our office suite
Work tags to attach: PG102675 DD02043 Salary Savings General Use Assignee: Heather Rouse.
LAGOMAR-0760-349930-Classroom Furniture
Cost Range Approval
Building: Lagomarcino Hall
Room: 0760
Request date: 3/26/2024
Requested by: Rashele Johnson
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
Estimate/options to purchase tables for classroom to be able to have 8 tables/pods for 4 students per table/pod. Not sure this will be purchased, want to get estimate to present to Department for possible purchase. Worktag provided is for design estimate costs - purchase worktag will be provided if decide to purchase.
LAGOMAR-1432-383609-Replace carpet in rooms 1432, 2331, 2446
Project Closeout
Building: Lagomarcino Hall
Room: 1432
Request date: 8/20/2024
Requested by: Jennifer Gentile
Contact: Brady Streit
Construction start: 9/25/2024
Construction end: 11/13/2024
Description:
Replace carpet in rooms 1432, 2331, and 2446.
The worktags for the Psychology carpeting projects are:
50% PG103907 DD19742
50% PG100170 DD19742
LAGOMAR-1465-389130-Remodel to Lab Space
Construction Documents
Building: Lagomarcino Hall
Room: 1465
Request date: 9/5/2024
Requested by: Jennifer Gentile
Contact: Steven Daniels
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
I am resubmitting this office suite in Lago 1465 to remodel as a lab space for a new faculty member, Han Na Lee. This was previously included in another estimate and had been put on a brief hold. We would like to move forward with discussing the estimate sent with the Lighting Option A to see where some costs may be reduced.
I don't seem able to add the start up account under the worktag section - please use Han Na Lee's startup : FSU_0000465
LAGOMAR-2347-384429-Patch and paint walls of 2347 Lago
Project Closeout
Building: Lagomarcino Hall
Room: 2347
Request date: 8/28/2024
Requested by: Jennifer Gentile
Contact: Alexa Peters
Construction start: 9/20/2024
Construction end: 10/1/2024
Description:
Patch and paint walls of 2347 Lagomarcino
50% PG103907 DD19800
50% PG100170 DD19800
LAGOMAR-2441-362378-Chalkboard to Whiteboard
Project Closeout
Building: Lagomarcino Hall
Room: 2441
Request date: 5/13/2024
Requested by: Kathleen Baumgarn
Contact: Alexa Peters
Construction start: 6/6/2024
Construction end: 9/16/2024
Description:
We would like to cover the chalkboard in Lagomarcino 2441 with Whiteboard material. Gary Puls in the shops will be doing the installation. We are needing help with the selection and ordering of the material. Gary has offered to go to the classroom and measure the chalkboard so this can be ordered soon. Actual installation will occur in late June.
Please let me know if you have any questions.
Thank you. Katie B.
LAGOMAR-GENERAL-343310-Braille Sign Replacements
Construction Documents
Building: Lagomarcino Hall
Room: General
Request date: 2/23/2024
Requested by: Clara Hernandez
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
A student submitted a report to our office about incorrect braille signs in Lagomarchino. She shared that the floor signs have inaccurate braille on them and included a photo of the first floor sign. I do not have further information or knowledge about whether there were concerns about other signs or where exactly this sign is located in Lagomarcino.
LAGOMAR-Room 2311-350929-Remodel
Project Closeout
Building: Lagomarcino Hall
Room: General
Request date: 3/29/2024
Requested by: Jennifer Gentile
Contact: Brady Streit
Construction start: 9/10/2024
Construction end: 11/8/2024
Description:
We have a new faculty member, Han Na Lee, starting in Psychology this fall and we would like estimates to update/renovate a room in Lagomarcino Hall. Han Na will be in town on May 6 and available any time that day to be present for looking at spaces. The room to be updated is Lago 2311 (Office space).
LIBRARY-0002-302202-Skylight or Foundation Repairs
Schematic Design
Building: Parks Library
Room: 0002
Request date: 8/15/2023
Requested by: Justin Nolting
Contact: Jennifer Warrick
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
FPM, Brandon Bartleson worked on this in Mid July and patched the exterior wall but this is still leaking. 293958 was the original work request that has already been closed out. Please look into this farther.
Below the two large skylights in the SE corner of 002, and in the SE corner of the study rooms 003 and 004 after a rain the carpet is always wet from the wall to about 2' out. The wall is not visibly wet or dripping when this happens. We have had issue before judging by the peeling paint and multiple caulking jobs to the glass. This seems to be a foundation issue that needs to be addressed. Area is close to storm drain that has issues holding water or being clogged. See Justin Nolting or Shane Baumler for more information.
LIBRARY-0005-371531-Film Vault Upgrades
Construction Documents
Building: Parks Library
Room: 0005
Request date: 6/25/2024
Requested by: Justin Nolting
Contact: Mike McCoy
Construction start: 2/4/2025
Construction end: 8/5/2025
Description:
Please start a project request for the room 005. We are looking to add to or upgrade exiting equipment to bring down the temperature and humidity in the room to preservation standards. Please give to Mike McCoy as he is familiar with this request and has surveyed the space already. See Justin Nolting for more info.
LIBRARY-0033A-348328-ITS Sign Replacement
Construction Documents
Building: Parks Library
Room: 0033A
Request date: 3/6/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Please remove the "Library IT Support" wall sign outside room 0074. Please make new sign that reads "Library IT Support" and hang sign outside 0033A. Use PG103216 for worktag. See Justin Nolting or Shane Baumler for more detail.
LIBRARY-0084-343476-ADA Sign
Construction Documents
Building: Parks Library
Room: 0084
Request date: 2/23/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Please make ADA sign for Room 084. Standard size will work great. Use PG103216 for work tag. See Justin or Shane for more info.
LIBRARY-0106-349576-Room Sign
Construction Documents
Building: Parks Library
Room: 0106
Request date: 3/22/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Please make ADA sign for room 106. The sign will probably need to be stuck on the glass by the door entry. Use work-tag PG103216 if necessary. See Justin or Shane for more details.
LIBRARY-0140-382728-Phase 3 - New Furniture
Project Closeout
Building: Parks Library
Room: 0140
Request date: 8/13/2024
Requested by: Justin Nolting
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
We would like a cost range estimate when we are ready for new furniture for room 140. This will be the third phase of the project and we will let you know when when the two phases are complete to move to phase three. Judy Dugan and Jenny Warrick are aware of this request and this can be put on the back burner for now. We would like to use muted colors that fall within the second color palette for furniture. We know which furniture we would like we just need color options. See Justin Nolting or Kurt Garretson for more detail. Please use PG103217 for worktag.
LIBRARY-0198-315915-Improvements
Construction
Building: Parks Library
Room: 0198
Request date: 10/5/2023
Requested by: Justin Nolting
Contact: Jennifer Warrick
Construction start: 9/6/2024
Construction end: 12/2/2024
Description:
Please start a project request to add sound dampening acoustic panels to room 198. This is the original building and would be attaching to original plaster. Please consult with university architect as well making sure these changes are approved. Use PG103216 for worktag for project.
Scope Increase:
Paint & Carpet
LIBRARY-0298-383052-Carpet-Paint-Furniture
Schematic Design
Building: Parks Library
Room: 0298
Request date: 8/14/2024
Requested by: Justin Nolting
Contact: Steven Daniels
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Please start a project request for Parks Library. Please include Dan Sloan on the project as well. We would like the following for rooms 298,294, and 292.
-New carpet
-New paint - with some light remodel work to patch the cracks in the plaster on the walls
-New furniture - Stack-able chairs and fold-able/rolling tables
-Make power available to all tables.
-Same amount of current seating or more
Ideally project would be completed by fall semester of 2025. Please use PG103217 as work-tag.
LIBRARY-0373-341952-Sign Replacement
Construction Documents
Building: Parks Library
Room: 0373
Request date: 2/8/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Please make new ADA sign for room 373 that reads:
0373
Human Resources
Please remove old sign and replace with new.
Work tags to attach: PG103216
LIBRARY-0374-341951-Sign Replacement
Construction Documents
Building: Parks Library
Room: 0374
Request date: 2/8/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Please make new ADA sign for room 374 that reads:
0374
Student Success & Retention
Office of the Senior Vice President & Provost
Please remove old sign and replace with new.
Work tags to attach: PG113128, DD03056
LIBRARY-0375-341950-Sign Replacement
Construction Documents
Building: Parks Library
Room: 0375
Request date: 2/7/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Please make new ADA sign for room 375 that reads:
0375
Student Success & Retention
Office of the Senior Vice President & Provost
Please remove old sign and replace with new.
Work tags to attach: PG113128, DD03056
LIBRARY-0375-362451-ADA Sign
Project Initiation
Building: Parks Library
Room: 0375
Request date: 5/13/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 8/5/2024
Construction end: 2/3/2025
Description:
Please make an ADA sign for room "0375". Use PG1032126 for worktag. See Justin Nolting if more info is needed.
LIBRARY-General-315981-Tiers Carrel Lighting and Receptacle
Schematic Design
Building: Parks Library
Room: General
Request date: 10/6/2023
Requested by: Justin Nolting
Contact: Steve Larson
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Please start a project request for all 7 tiers in Parks library. We would like the lighting in the carrels updated to LED and also an electrical surface mounted outlet with USB-C capability. There is roughly 29 carrels per level. Please use PG103216 for worktag. Jenny Warrick - Project Manager and Troy Bowers - Electrical Engineer are to be on the project.
LIBRARY-GENERAL-342470-Test Program Amobi Desk
Construction
Building: Parks Library
Room: General
Request date: 2/14/2024
Requested by: Justin Nolting
Contact: Jennifer Warrick
Construction start: 4/24/2024
Construction end: 12/2/2024
Description:
Please direct this project directly to Judy Dugan. We would like to use the Amobi pilot program to place an "Amobi Desk" and "Amobi Team" in the NW corner of 2nd floor "RM240" and the NW corner of 3rd floor "RM350". This is a test program and there should be no cost to the Library associated with this. See Brent Swanson, Shane Baumler, or Justin Nolting for more detail.
LIBRARY-M0092C-341506-Hydraulic Calculation Plate
Construction Documents
Building: Parks Library
Room: M0092C
Request date: 4/19/2024
Requested by: Alex Wiley
Contact: Brian Grove
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Parks Library
Rm M0092C
Provide hydraulic calculation plate for west riser (1980s) design area at the bottom of the riser in room M0092C.
This is a result of 2024 Fire Marshall Inspection
LIBRARY-M0092C-341507-Riser Control Valve Labeling
Schematic Design
Building: Parks Library
Room: M0092C
Request date: 4/19/2024
Requested by: Alex Wiley
Contact: Brian Grove
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Parks Library, Rm M0092C
Riser control valve labeling needs to be adjusted to reflect sprinkler system changes. Some of the building wet zones are now on the Tiers Riser, so "Tiers" and "Main Building" tables are no longer accurate. Labeling should be as clear an unambiguous possible.
LIED- General-267041-Foundation Study
Construction
Building: Lied Recreation Athletic Center
Room: General
Request date: 3/22/2023
Requested by: Garry Greenlee
Contact: Eric Ohrt
Construction start: 6/7/2023
Construction end: 12/2/2024
Description:
Bruce Bonestroo and John Byerly are familiar with this request. Lied Rec Center has foundation settling issues an they have reoccurred. Rec Services needs to have this reviewed and determine a corrective course of action. This will involve structures engineers and possibly civil engineers for the study.
LIED_FIELD-General-392184- Retro Fit Lied Field Lights
Project Closeout
Building: Lied Recreation Fields
Room: General
Request date: 10/2/2024
Requested by: Brent Cunningham
Contact: Mitchell Hlavacek
Construction start:
Construction end:
Description:
Rec Services would like to retro fit the current Lied field lights which are metal halide to LED. We want the same MUSCO fixtures and components that we currently have at MWL and SE Rec Complex along with Control Link associated with it. This will allow all our outdoor fields to be on the same program and have the same lighting attributes. See attached documents from MUSCO.
LIED_FIELD-MWL Rec Fields-363174-Relocate Scoreboards
Project Closeout
Building: Lied Recreation Fields
Room: General
Request date: 5/19/2024
Requested by: Brent Cunningham
Contact: Brady Streit
Construction start: 10/15/2024
Construction end: 10/30/2024
Description:
Relocate the two far east scoreboards at the MWL Rec fields to the Lied Soccer fields. (North End) Run electrical to the scoreboards that got relocated. I have quotes for the relocation and the demo from NGE. See attached. We would like this done by fall.
Any questions contact Brent at 294-4247.
LIED-GENERAL-399237-Exterior repair and replacement
Schematic Design
Building: Lied Recreation Athletic Center
Room: General
Request date: 11/6/2024
Requested by: Garry Greenlee
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Dan Sloan and Brandi Latterell are familiar with this request. Exterior repair/replacement are needed to minimize foundation issues at the Lied Recreation Athletics Center. 1. Repair/replacement of the DMU infill and flashing a the top of the exterior wall on the west sided of the training room. 2. Trees need to be removed and replaced with lesser invasive vegetation to minimize roots from removing moisture from under the foundation.
LIED-GENERAL-399245-Replace doors and frames
Schematic Design
Building: Lied Recreation Athletic Center
Room: General
Request date: 11/6/2024
Requested by: Garry Greenlee
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Dan Sloan and Brandi Latterell are familiar with this request. Interior of Lied Recreation Athletic Center multiple doors and frames need replaced. Frames must be able to withstand slab movement without affecting the function of the doors. Block walls need to be replaced with light weight metal framing and wallboard. All work must be done from May 15-August 15. It is possible to split into phase if needed. See attachment on specific locations, doors, and walls.
LIED-M0307A-396685- Lighting Repairs
Construction
Building: Lied Recreation Athletic Center
Room: M0307A
Request date: 10/11/2024
Requested by: Casey Bubke
Contact: Mitchell Hlavacek
Construction start: 11/4/2024
Construction end: 5/5/2025
Description:
Converting to Lx Project.
Lights will not turn off. Watt Stopper Lighting Panel: RU-SW fed from Electrical Panel: LSW, CIR: 26. All lighting fed from RU-SW will not turn off with light switch nor manually with any switches inside of panel RU-SW. RU-SW has appropriate voltage and circuit board LED shows power is on. After cycling power off/on to RU-SW problem persists with no changes.
LIED-M0389-405391-ATTN: Steve Larson. As per Garry Greenlee's request: Please install network cab
Building: Lied Recreation Athletic Center
Room: M0389
Request date: 12/2/2024
Requested by: Casey Bubke
Contact: Mitchell Hlavacek
Construction start:
Construction end:
Description:
ATTN: Steve Larson. As per Garry Greenlee's request: Please install network cable and any other hardware needed for remote access to the newly installed Watt Stopper segment manager in order to view the software and on/off lighting schedules at Lied Rec. Recreation Services also has their own IT support technician, Scott George, who can help with the installation if necessary. Thank you.
LLOYD- General-266504-Signage
Construction
Building: Lloyd Veterinary Medical Center
Room: General
Request date: 3/15/2023
Requested by: Marc Kinsley
Contact: Joseph Stoberl
Construction start: 7/31/2024
Construction end: 12/2/2024
Description:
Improving signage for the Lloyd veterinary medical center
1. the signs along the right hand side of Riverside Drive-the first sign displaying where to turn for small animal hospital is located too close to the entry of the employee parking lot leading to a number of client complaints that the signs are not clear - is it possible to move this sign further up riverside drive closer to the turn to enter the main small animal entrance/client parking?
2. I would like to add a lighted sign to the canopy over the entrance to the small animal hospital. The lighted sign would be similar to the lighted red and white plus sign on S. 16th Street. It would be a square, lighted with the red Plus and white background to better identify for owners in an emergency situation where to go.
LLOYD- General-287308-Paddock Fencing
On Hold
Building: Lloyd Veterinary Medical Center
Room: General
Request date: 6/15/2023
Requested by: Marc Kinsley
Contact: Scott Jasper
Construction start: 7/31/2024
Construction end: 12/1/2024
Description:
I would like to evaluate the placement of paddock fencing for housing teaching horses in the grassy area between the highway and vet med. would need to separate into 2-3 pastures, have auto waterer access if possible. Would need help in the design/layout
LLOYD-1120-399333-Extend Track from 1210 to 1120
Schematic Design
Building: Lloyd Veterinary Medical Center
Room: 1120
Request date: 11/6/2024
Requested by: Megan Anderson
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Good afternoon. Seeking a quote on extending the track from 1210 (equine surgery) across to 1120 (food animal) to accommodate a hoist for moving patients under anesthesia. Use account SG2255912 for project.
LLOYD-1273-315704-Replace Water Heater
Project Closeout
Building: Lloyd Veterinary Medical Center
Room: 1273
Request date: 10/4/2023
Requested by: John Netwal
Contact: Amy Tremain
Construction start: 1/25/2024
Construction end: 10/18/2024
Description:
Replace Leaking Hot Water Heater
LLOYD-1300-385304- Equine Hoist System in Isolation Unit
Construction Documents
Building: Lloyd Veterinary Medical Center
Room: 1300
Request date: 8/28/2024
Requested by: Megan Anderson
Contact: John Byerly
Construction start: 1/17/2025
Construction end: 7/18/2025
Description:
We would like to get an estimate to install a hoist system in the equine isolation unit. An I beam with capacity to lift 2000 plus pounds will need to be installed within an existing stall. Please use PG105149 DD02447. Call with any questions and I can walk you through the design. Wanting a quote to see if the project is monetarily feasible.
**** I am trying to send but it wants an account. I do not know how to do the bottom portion. Use the account listed above to fund this quote.
LLOYD-1304-290612-Temperature Regulation
On Hold
Building: Lloyd Veterinary Medical Center
Room: 1304
Request date: 6/29/2023
Requested by: Amy Tremain
Contact: Scott Jasper
Construction start: 1/17/2025
Construction end: 7/18/2025
Description:
Too Hot in Isolation Stall 3
Attn Mike McCoy - sent from FPM shops
LLOYD-1521-396675-Ordering replacement furniture.
Project Closeout
Building: Lloyd Veterinary Medical Center
Room: 1521
Request date: 10/16/2024
Requested by: Brian Adams
Contact: Amy Tremain
Construction start:
Construction end:
Description:
Ordering replacement furniture.
Tables and chairs for Lloyd 1521 conference room. Scott Jasper, Tisha Campbell and Rebecca Cantrall are aware of this order.
Details of the furniture have been established. flipping and nesting tables.
LLOYD-1521-403396-Ordering Replacement Furniture
Construction
Building: Lloyd Veterinary Medical Center
Room: 1521
Request date: 10/16/2024
Requested by: Brian Adams
Contact: Amy Tremain
Construction start: 11/19/2024
Construction end: 5/20/2025
Description:
Ordering replacement furniture.
Tables and chairs for Lloyd 1521 conference room. Scott Jasper, Tisha Campbell and Rebecca Cantrall are aware of this order.
Details of the furniture have been established. flipping and nesting tables.
LLOYD-1884 &1880 -383999-Remodel
Construction Documents
Building: Lloyd Veterinary Medical Center
Room: General
Request date: 8/22/2024
Requested by: Carrie Schwake
Contact: Steven Daniels
Construction start: 1/14/2025
Construction end: 7/15/2025
Description:
We would like to have rooms 1884 and 1880 evaluated to modify the spaces into one room to house a resident blood donor cat colony.
There are requirements to have a certain level of ventilation, at least one large viewing window (preferably 2) and a door to an ante room prior to entering a door into the housing area to prevent escape. In the ante room we would like to have cabinets (hopefully reuse the ones currently in the area) and a sink.
I can attach pictures of the current area to this request.
LLOYD-2424-348692-Grad Office Remodel
Project Closeout
Building: Lloyd Veterinary Medical Center
Room: 2424
Request date: 3/11/2024
Requested by: Jennifer Faber
Contact: Alexa Peters
Construction start: 5/9/2024
Construction end: 8/27/2024
Description:
Due to the increased demand for desk space for VDPAM graduate assistants we would like to convert 2424 Lloyd from a single faculty office to a graduate office with 5 desk spaces. This office will be configured/set up like our previous project in 2428 Lloyd.
LOT 5-General-363305-Update Parking Lot Signage
Schematic Design
Building: Parking Lot 5
Room: General
Request date: 5/20/2024
Requested by: Xuejie Wu
Contact: Joseph Stoberl
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
The entrance signs at some of the parking lots that are starting to look ratty need a redo and the texts need to be made bigger so easier to read. We do know lot 5 and lot 45 need update. Joe Stoberl is in contact with the Parking Director and will do an inventory for Parking on which entrance signs need updates. I don't know if the sub type I chose is correct, but let me know if it needs to be the other one. Thanks.
MACKAY-0101-279382-Relocate DATS Lab
Project Closeout
Building: Mackay Hall
Room: 0101
Request date: 5/3/2023
Requested by: Jennifer Plagman-Galvin
Contact: Alexa Peters
Construction start: 10/18/2023
Construction end: 6/11/2024
Description:
Move DATS Lab and The Meeting Room from LeBaron (105210551057) to 101 MacKay.
MACKAY-0200-355426-Floor Replacement
Project Closeout
Building: Mackay Hall
Room: 0200
Request date: 4/10/2024
Requested by: Erica Beirman
Contact: Eric Ohrt
Construction start: 6/3/2024
Construction end: 9/16/2024
Description:
Room 200 floor replacement---we would like to have an estimate if the terrazzo is able to be refinished in that lab. If not we would like estimate to replace with the flooring that was used last summer in teh floor for room 210 lab. Would like the project finished before August 1st if possible.
MACKAY-General-335463-College of Human Sciences Space Planning
On Hold
Building: Mackay Hall
Room: General
Request date: 1/11/2024
Requested by: Jennifer Plagman-Galvin
Contact: Denise Wulf
Construction start: 6/3/2024
Construction end: 9/16/2024
Description:
CHS Post-LeBaron space planning including use of space in MacKay, HNSB, FSB and Forker. Corinne Good should be lead on this project.
MAHLSTE-General-369100-New Roof on Mahlstede Center
Project Closeout
Building: Reiman Gardens Mahlstede Center
Room: General
Request date: 6/10/2024
Requested by: Nathan Brockman
Contact: Eric Ohrt
Construction start: 8/26/2024
Construction end: 10/17/2024
Description:
We don't need drawling we don't need construction documents. Reiman needs a new roof on Mahlstede building at Reiman Gardens. We already got some quotes from contractors we can't afford redoing in Cedar again. Metal Roof is also to expensive for us at this time. Looks like we are going with a standard asphalt shingle nothing fancy. I sent some of the quote I acquitted along to Eric Ohrt.
MARSTON- General-300366-Drainage Improvements
Schematic Design
Building: Marston Hall
Room: General
Request date: 8/1/2023
Requested by: John Netwal
Contact: Joseph Stoberl
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Pearson & Marston: Various Drainage Improvements
MIC Approved $65,000 FY24
MARSTON-1300-341347-Couch and Artwork
Project Closeout
Building: Marston Hall
Room: 1300
Request date: 2/2/2024
Requested by: Lori Bushore
Contact: Jennifer Warrick
Construction start: 2/20/2024
Construction end: 6/25/2024
Description:
We are interested in purchasing a couch for our main office reception area. We are also interested in artwork above the couch.
MARSTON-3300-377085-Computer Classroom
On Hold
Building: Marston Hall
Room: 3300
Request date: 7/25/2024
Requested by: Benjamin Johns
Contact: Denise Wulf
Construction start: 2/20/2024
Construction end: 6/25/2024
Description:
We are looking to repurpose Marston 3300 into a computer classroom. I would love to get some floorplans with possible seating arrangements for this space with priority on maximum seating capacity. My rough estimate would be to have 3-4 rows of tables with computers facing the two exit doors. There is no power/network in the center of the room however, so that will need to be added somehow. Thanks for your input!
MARSTON-4100C-363256-Office Signage
Construction Documents
Building: Marston Hall
Room: 4100C
Request date: 5/19/2024
Requested by: Jean Dubberke
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
office signage
MARSTON-GENERAL-368768-Wayfinding Signage
Schematic Design
Building: Marston Hall
Room: General
Request date: 6/5/2024
Requested by: Kate Cossa
Contact: Joseph Stoberl
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Wayfinding signage hung from the ceiling to direct to various rooms on our floor. What are the next steps?
MEATS L-0194-381622-Order Chairs from Previous Project
Project Closeout
Building: Meats Laboratory (New)
Room: 0194
Request date: 8/8/2024
Requested by: Matthew Wenger
Contact: Amy Tremain
Construction start: 9/6/2024
Construction end: 11/1/2024
Description:
Need to order additional chairs that match those purchased for 191 Meat Lab during 2019/2020 project. 4 without casters and 3 with carpet casters
MEM UN-0333-369617-Structural Beam Repairs
Schematic Design
Building: Memorial Union
Room: 0333
Request date: 6/21/2024
Requested by: Bradley Hill
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
We have some concrete issues with spalling and some falling off a structural beam in one of the Mechanical Rooms of the Memorial Union. Can I please ask that we have someone come over and complete a structural engineering/observation/recommendation report on how to correct the deficiency? The room is Room 0333 of the Memorial Union. Please contact Mario Filippelli (MU Maintenance Manager) for access and more details.
Phone number: 5152942301
MEM UN-1150-251475-Expanding Retail Footprint
Construction
Building: Memorial Union
Room: 1150
Request date: 1/6/2023
Requested by: Rita Phillips
Contact: Jennifer Warrick
Construction start: 10/14/2024
Construction end: 4/14/2025
Description:
Textbook retail space: looking at options for either expanding retail footprint or creating a storage location which would eliminate product storage at off site location. The bookstore reserves the right to hire a third party retail consultant for a greater understanding to the lay out of the space and potential new lines that could be considered. Would like a potential completion by May 31, 2024 prior to 2024 Summer Orientation in June.
MEM UN-1580J-397481-New Furniture for Campus Organizations Accounting Office
Schematic Design
Building: Memorial Union
Room: 1580J
Request date: 10/23/2024
Requested by: Rachel Boenigk
Contact: Rebecca Cantrall
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
We'd like to get new furniture spec'd for the Campus Organizations Accounting Office
MEM UN-General-325465-Bike Station Replacement
Project Closeout
Building: Memorial Union
Room: General
Request date: 12/1/2023
Requested by: Bradley Hill
Contact: Jennifer Warrick
Construction start: 8/2/2024
Construction end: 10/15/2024
Description:
Bike Maintenance Station Replacement
MEM UN-GENERAL-354892-Rm 4530-Remodel
Construction
Building: Memorial Union
Room: General
Request date: 4/3/2024
Requested by: Tracy Borts
Contact: Jennifer Warrick
Construction start: 9/12/2024
Construction end: 12/12/2024
Description:
Rm 4530 - Install cubicle walls for two staff desks located in central/open area. One may just need privacy screens.
Rm 4530 - Central/open area will be used as graduate student work spaces. We want to explore alternative arrangement for the existing furniture, addition of desk privacy panels and rolling drawers/file cabinets.
Rm 4558 - This is currently a space for multiple grad students. It needs to be converted into a staff office. Desk needs to be extension to match other staff L-shaped desks.
Rm 4567E - Additional locked cabinets are needed to store documents. Cabinets may not be located in this area but need to be easily accessible for staff and students working at the front desk.
MEM UN-General-383627-Table and Storage
Project Closeout
Building: Memorial Union
Room: General
Request date: 8/20/2024
Requested by: Bradley Hill
Contact: Mitchell Hlavacek
Construction start: 9/12/2024
Construction end: 12/2/2024
Description:
Table for room 3644B and storage for room 1560.
MOL-BIO- General-280710-Signage
Construction Documents
Building: Molecular Biology
Room: General
Request date: 5/16/2023
Requested by: Peter Lelonek
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Make and install approximately 17 new or update some existing gray plastic signs with white lettering to improve way finding of Biotech Facilities on ground and first floor. Sign locations and wording is already determined. I need a cost estimate before proceeding.
MOL-BIO-4132-397232-Flooring
Construction
Building: Molecular Biology
Room: 4132
Request date: 10/22/2024
Requested by: Peter Lelonek
Contact: Eric Ohrt
Construction start: 10/23/2024
Construction end: 4/23/2025
Description:
4132 and 4188 MBB - Project to remove tile floor, polish concrete and seal
MORRILL-1017-350766-Gallery Floors Refinished
Budget Approval
Building: Morrill Hall
Room: 1017
Request date: 4/16/2024
Requested by: Alison Ranniger
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
Floors in the gallery need to be either buffed and waxed or refinished. They have only been buffed once in the past 17 years and need to be addressed. Please contact Alison Ranniger to schedule a walk through to discuss options and a timeline,
PALMER- GENERAL-273801-Playground Improvements
Project Closeout
Building: Palmer Human Development & Family S
Room: General
Request date: 4/21/2023
Requested by: Jennifer Plagman-Galvin
Contact: Jennifer Warrick
Construction start: 8/29/2023
Construction end: 8/14/2024
Description:
The Lab School in the Palmer Building has several facility related needs.
1) Exterior work to tree roots and sidewalks on the playground which have become tripping hazards.
2) Increased need for security through alarm sensor and key code access.
3) Light construction for a ramp in one of the classrooms.
4) Updating some plumbing fixtures and countertop/cabinetry in the kitchen area.
7/27/2023 - adding scope
Remove the outside drinking fountains at the Lab School.
PALMER-0363-302548-Kitchen Remodel
On Hold
Building: Palmer Human Development & Family S
Room: 0363
Request date: 8/17/2023
Requested by: Jennifer Van Ryswyk
Contact: Scott Jasper
Construction start: 8/29/2023
Construction end: 8/14/2024
Description:
Updating some plumbing fixtures and countertop/cabinetry in the kitchen area
PALMER-Rooms 1334 & 1338-397143-Paint & New Furniture
Cost Range Approval
Building: Palmer Human Development & Family S
Room: 1334
Request date: 10/23/2024
Requested by: Mary Mccunn
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
We need a quote to present to the Deans CASTLE Committee for the Health and Human Services Department. We would like someone to come and look at rooms 1334 and 1338 in Palmer for paint, possibly new furniture, new neutral colored curtain to mimic an actual financial counseling or planning space. We will be using Student CASTLE funds for this project and it will be voted on from the Dean's CASTLE committee. The funds have to be used to benefit the students.
Parking Lots-Pavement Management Plan
Building: Campus Grounds
Room: General
Request date: 1/24/2023
Requested by: Angela Solberg
Contact: Angela Solberg
Construction start:
Construction end:
Description:
Parking Lots-Pavement Management Plan-Multi-Year
PATTRSN- General-289964-Monument Sign
Construction Documents
Building: Patterson Hall
Room: General
Request date: 6/27/2023
Requested by: Brian Adams
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Sign shop to update the Monument sign for Veterinary Medicine building to Update the building being renamed. Chris Strawhacker has details.
PATTRSN-1008-384196-Air Handling
Project Closeout
Building: Patterson Hall
Room: 1008
Request date: 8/23/2024
Requested by: William Robertson
Contact: Amy Tremain
Construction start: 11/1/2024
Construction end: 11/13/2024
Description:
Please provide a cost range estimate to make the air handling in room 1008 positive with respect to room 1010.
Donna Imhoff has the details
PATTRSN-1054 & 1058-376900-Suspended Ceiling and Lights
On Hold
Building: Patterson Hall
Room: 1054
Request date: 7/23/2024
Requested by: William Robertson
Contact: Denise Wulf
Construction start: 11/1/2024
Construction end: 11/13/2024
Description:
Please provide a Cost Range Estimate to install a suspended ceiling and lights in rooms 1054 and 1058.
PATTRSN-1074-311908-Casework Replacement
Construction
Building: Patterson Hall
Room: 1074
Request date: 9/28/2023
Requested by: William Robertson
Contact: Amy Tremain
Construction start: 9/9/2024
Construction end: 3/10/2025
Description:
Please estimate the cost of replacing the casework in this laboratory.
PATTRSN-1127-224249-Ungrounded Electrical Circuits
Budget Approval
Building: Patterson Hall
Room: 1127
Request date: 9/15/2022
Requested by: Brian Adams
Contact: Scott Jasper
Construction start: 12/21/2024
Construction end: 6/21/2025
Description:
Remove the existing non grounded power system and install a traditional non surgical electrical panels to feed the labs. Troy Bowers is aware of the situation.
PATTRSN-1140-334995-Remodel
Project Closeout
Building: Patterson Hall
Room: 1140
Request date: 1/5/2024
Requested by: Brian Adams
Contact: Amy Tremain
Construction start: 3/20/2025
Construction end: 10/17/2025
Description:
Patterson hall rooms 1140, 1142, 1146 and 1150 are rooms under consideration for remodeling and updating for a new hire for a new lab. Only (3) rooms are anticipated to be used for the new person and these are the choices we are considering. Replace flooring, cabinetry, lights and paint including sinks and eyewashes'.
1/10/2024 Adding Scope
we would like to include rooms 1142 and 1144 in this project.
PATTRSN-1218F-309396-Remodel
On Hold
Building: Patterson Hall
Room: 1218F
Request date: 9/8/2023
Requested by: William Robertson
Contact: Scott Jasper
Construction start: 3/20/2025
Construction end: 10/17/2025
Description:
Renovate rooms 1218E & 1218F, including new ceiling, light fixtures, casework, floor tiles, etc.
PATTRSN-1222B-341842-Casework Replacement
Project Closeout
Building: Patterson Hall
Room: 1222B
Request date: 2/6/2024
Requested by: William Robertson
Contact: Amy Tremain
Construction start: 7/11/2024
Construction end: 9/6/2024
Description:
Replace base cabinets, benchtop, sink and faucet.
Steve Daniels has the details.
PATTRSN-1674-354801-Hoist System Extension
On Hold
Building: Patterson Hall
Room: 1674
Request date: 4/2/2024
Requested by: Supun Dissanayake
Contact: Denise Wulf
Construction start: 7/11/2024
Construction end: 9/6/2024
Description:
This is a request for an extension of the current hoist system track from the ceiling in the loading dock (Rm. 1674). The extension would be from the current end point of the track in the dock, extending out an extra ~10ft. towards the garage door to allow for proper coverage of roll off containers during body disposal.
PATTRSN-2038-404059-Workstation for office
Schematic Design
Building: Patterson Hall
Room: 2038
Request date: 11/18/2024
Requested by: Shivani Choudhary
Contact: Carrie Choudhury
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
I would like to get workstation for my office.
Work tags to attach: FSU_0000457
PATTRSN-2052-362512-Office Furnishings
Project Closeout
Building: Patterson Hall
Room: 2052
Request date: 5/13/2024
Requested by: William Robertson
Contact: Amy Tremain
Construction start: 11/4/2024
Construction end: 11/4/2024
Description:
Please contact Dr. Greg Martin about office furnishings.
Martin, Greg [B M S] martingm@iastate.edu
PATTRSN-2060-384017-Replace Ceiling, Lights and Carpet
Construction
Building: Patterson Hall
Room: 2060
Request date: 8/22/2024
Requested by: William Robertson
Contact: Amy Tremain
Construction start: 11/12/2024
Construction end: 5/13/2025
Description:
Please provide a cost range estimate to replace the existing suspended ceiling, and fluorescent lights.
PATTRSN-2111-334993-Fume Hood Repair & Lighting
Construction
Building: Patterson Hall
Room: 2111
Request date: 1/5/2024
Requested by: Brian Adams
Contact: Eric Ohrt
Construction start: 7/15/2024
Construction end: 1/13/2025
Description:
Fume hood was damaged in a sprinkler discharge. Can it be repaired, or does it need replaced? What is the estimate to get a working fume hood?
1/29/24 - Added Scope
Light Replacement added.
PATTRSN-2111D-396306-Electrical Upgrades
Project Closeout
Building: Patterson Hall
Room: 2111D
Request date: 10/9/2024
Requested by: Britta Rued
Contact: Amy Tremain
Construction start:
Construction end:
Description:
Bringing in lab equip: Mass Spec/HPLC system. Requesting electrical upgrade: 208-volt, 30-amp twist-lock outlet installed. It also needs:
-230 V AC, 50/60 Hz, single phase outlet for the mass spec and forepump portions
-The manual state that line voltages can vary between 207 AC – 253 AC, and that the power cord of the instrument needs to be connected to a wall receptacle that’s fused with 15 A or 16 A.
-There’s a note in the manual about customers in North America that recommends that a buck/boost transformer be used to ensure that the power is in the right parameters at all times, and state that it needs a dedicated single phase 30 amp 208V AC power line with a good earth ground that terminates in a NEMA L6-30R receptacle within 6 feet of the instrument location.
-The mass spec and vacuum/forepump need to be connected by a large tube 2” in diameter to get the right vacuum, and it needs to be under the mass spec location.
The LC is easier, it needs 230 V AC or 120 V AC, 50/60 Hz.
EDIT: another side note: the mass spec’s forepump needs to be connected to a fume exhaust system with some specific connections:
-The exhaust port of the rotary pump needs to be connected to an exhaust gas line leading out of the building OR exhaust system.
-The inner diameter of the pipe should be at least 1 in. An exhaust hose for connecting the forepump to the exhaust system comes with the system and is 16 ft long. It has dimensions of ½ in ID and 25/32 in OD. The exhaust system for the forepump must be able to accommodate an initial inrush flow rate of 3 L/min, and a continuous flow rate of 1 L/min.
-The exhaust tubing should not be routed from the pump vertically towards the ceiling, the tubing needs to be routed from the exhaust port down the floor.
-The exhaust hose should travel at floor level for 78.5 in before it reaches the external exhaust system. The tubing acts as a trap for exhaust fumes that would otherwise recondense in the forepump oil.
Other notes to add:
-They recommends connecting it to a UPS if power supply is unstable
PATTRSN-2220-336675-Heat Exchanger Study
Construction Documents
Building: Patterson Hall
Room: 2220
Request date: 1/22/2024
Requested by: John Netwal
Contact: Donna Imhoff
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We would like to have the Engineering Team review the recent Heat Exchanger Installation for code compliance and safety in the mechanical room M2220 and develop a detailed plan to correct any deficiencies found that could be shared with either a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
PATTRSN-2280-348176-Furniture Replacement
Construction Documents
Building: Patterson Hall
Room: 2280
Request date: 3/5/2024
Requested by: Justin Nolting
Contact: Rebecca Cantrall
Construction start: 12/10/2024
Construction end: 6/10/2025
Description:
Please start a project request for Vet Med Library. 2280 Patterson Hall, 1800 Christensen Dr, Ames, IA 50010. We would like to have some old furniture removed and replaced with 4 new powered Allsteel stride tables with individual partitions or similar to what is at Parks Library room 130. Along with 3 Brody chairs w/ power. Use PG103217 for worktag.
PATTRSN-2531-396671- Remove Doors to 2531 Hallway
Bidding
Building: Patterson Hall
Room: 2531
Request date: 10/11/2024
Requested by: Brian Adams
Contact: Amy Tremain
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
Remove both doors to 2531 hallway and the walls they are in; creating a wider more obvious flow of traffic. One wall, near the receptionist, is drywall. It has a blank cover plate over what might have been a light switch on the reception side. The door is in drywall with 3" on the hinge side and 18" on the latch side to be removed from the floor up to the ceiling so their is no bulkhead. Floor patch required. The other end of this short hallway is a block wall. remove the block and install bull nose bock on both left and right edges. The block will have to be removed all the way to deck above as there is a jog in the wall that is being removed. That is the 18" wide side of the door. The other side of the door that portion is the correct location. A drywall bulkhead may be necessary here due to the ceilings and the jog in the wall being removed. This will also require floor patching. There is a light switch in the block wall on the interior of the hallway that can be relocated to the adjacent drywall. surface.
PATTRSN-2703-349888-Lab Emergency Power
Project Closeout
Building: Patterson Hall
Room: 2703
Request date: 3/26/2024
Requested by: Supun Dissanayake
Contact: Amy Tremain
Construction start: 8/28/2024
Construction end: 10/30/2024
Description:
We are trying to get an emergency power outlet for our Histology lab. I am checking with you to see if you will be able to help with checking the available generator capacity.
Thank you for your assistance!
PATTRSN-2726-375626-New Filing Cabinet
Project Closeout
Building: Patterson Hall
Room: 2726
Request date: 7/9/2024
Requested by: Supun Dissanayake
Contact: Amy Tremain
Construction start:
Construction end:
Description:
Dr. Lisa Uhl joined the VPTH department as a new faculty member, and she would like to order a filing cabinet for her office space. She had tried looking in CyBuy, but they are all restricted access. She prefers to have something like below;
https://www.amazon.com/Scranton-Co-Drawer-Cabinet-Assembled/dp/B07YG2GBF5/ref=sr_1_8?dib=eyJ2IjoiMSJ9.Yb4qh-oPUpSA07zK27_ajfMT9Npq-MSFDFW9LQMJnoZ_7Jzv-4oletpyTxOGdqDDwNVuAZsKqMWBntNPfUvEX23WlHGFNBG2pMsYLapJhK2tCux72iDXLKvzOf8FRmbBHy04baFGE6ABjBNxNbbsWXu9-DLEOR-ouXERcfNHmKAiKQr9RUnJUrLmjL3thX8siP8GP8QMi9iTJS7cTFYA4gUEYctUGosWfdry1Wg36xUsL8lVZHPHoL1MMOmZveo8c6aagzockWh-BQQMDKI6uI4QPHNjob04gQ4JknknRv0.iwSAL7rkjWWrBSqnU3dmT0fFe0Tl6usikf6GngoEoDc&dib_tag=se&keywords=5+drawer+gray+file+cabinet&qid=1720469314&sr=8-8
I appreciate it if we can get some help ordering this filing cabinet.
PATTRSN-Emergency Circuits
Construction
Building: Patterson Hall
Room: General
Request date: 8/31/2020
Requested by: William Robertson
Contact: Amy Tremain
Construction start: 11/19/2024
Construction end: 5/20/2025
Description:
Emergency Circuits
PATTRSN-General-315924-Room Signage
Project Closeout
Building: Patterson Hall
Room: General
Request date: 10/6/2023
Requested by: Brian Adams
Contact: Amy Tremain
Construction start: 7/26/2024
Construction end: 7/26/2024
Description:
Room signage, black frame, clear removable lens, numbers and braille on the sign. Signs to be mechanically fastened to the walls since the double sided tape does not seem to last. List of rooms is in uploaded attachment.
PATTRSN-General-330452-Cage Washer Installation
Schematic Design
Building: Patterson Hall
Room: General
Request date: 12/18/2023
Requested by: Dean Isaacson
Contact: Mike McCoy
Construction start: 11/25/2025
Construction end: 5/26/2026
Description:
This project is going to encompass the entire demolition of the old cage washers in VMRI 40 and Patterson Hall and install of the new cage washers in both buildings. (separate projects per building)
PR1223962-VMRI 40-329818-Cage Washer Installation
PR1226578-PATTRSN-General-330452-Cage Washer Installation
PATTRSN-General-356062-Chair Cylinder Replacement
Budget Approval
Building: Patterson Hall
Room: General
Request date: 4/16/2024
Requested by: Brian Adams
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
This started as a possible warranty request, but ended up no longer being on warranty. I’ve requested a revised quote with just the part (replacement chair cylinder) and any shipping as Brian Adams at PATTRSN will be receiving & installing the new part.
PATTRSN-GENERAL-368954-Room Signs
Project Initiation
Building: Patterson Hall
Room: General
Request date: 6/7/2024
Requested by: Brian Adams
Contact: Joseph Stoberl
Construction start: 10/4/2024
Construction end: 4/4/2025
Description:
Room signs, 8x8, black frame, removable clear lens, only the # and braille on the sign.
1310, 1312, 1316, 1365, 1375
PATTRSN-GENERAL-403515-Balance BEF 27 & AHU6 for room 1626.
Schematic Design
Building: Patterson Hall
Room: General
Request date: 11/18/2024
Requested by: Justin Abbott
Contact: Donna Imhoff
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Balance (BEF 27)exhaust fan and air handler(AHU6) for room 1626 this needs to be turned into a project for Donna Imhoff.
PATTRSN-Rooms 2025 & C2087-362603-Remodel to Enlarge Both Rooms
On Hold
Building: Patterson Hall
Room: 2025
Request date: 5/17/2024
Requested by: Brian Adams
Contact: Denise Wulf
Construction start: 12/16/2024
Construction end: 6/16/2025
Description:
Remodel room 2025 to make it larger by incorporating room#s 2087E, 2087D, 2087A.
Also remodel C2087 to be a large room including 2087F, 2087G, 2087H, 2087J and 2091.
PEARSON- General-300386-Plaza Repair
Construction Documents
Building: Pearson Hall
Room: General
Request date: 8/1/2023
Requested by: John Netwal
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Pearson/Student Services: Plaza Repair
MIC Approved
$10,000 FY23
$60,750 FY25
PEARSON-1137Y (cubicle)-368908-Order Furniture
Project Closeout
Building: Pearson Hall
Room: 1137
Request date: 6/6/2024
Requested by:
Contact: Jennifer Warrick
Construction start: 8/5/2024
Construction end: 10/14/2024
Description:
Order furniture to configure 1137Y for two full time staff. Could not access Famis360 in Okta.
Additional location information: 1137Y (cubicle)
Work tags to attach: PG102501
PEARSON-1156 & 1114-342328-Door Signs
Construction Documents
Building: Pearson Hall
Room: 1156
Request date: 2/12/2024
Requested by: Alberto Lara
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We are needing a new door sign for Pearson 1156 that says "McNair Program"
We are wanting to order a new door sign for Pearson 1114 that says, "Preparing Future Faculty".
Would it be possible to have it changed to read:
1114
Preparing
Future
Faculty
PEARSON-3102B & 3102D-356496-Furniture and Lighting
Project Closeout
Building: Pearson Hall
Room: 3102B
Request date: 4/24/2024
Requested by: Megan Myers
Contact: Jennifer Warrick
Construction start: 8/2/2024
Construction end: 9/19/2024
Description:
cost range estimate for two sitting chairs for Department Chair office in Pearson 3102B (more comfortable chair type as opposed to chairs that sit up next to a table, etc.) AND for large table and chairs for departmental meeting room/copy room, Pearson 3102D (where people might sit to collaborate/eat lunch, drink coffee, etc.; should comfortable seat 6-8 but not be a huge table). I would also like to see a cost range for new lighting, blinds, and clock in the Chair office (Pearson 3102B). Thank you!
PHYSICS-0038-268579-General University Classroom Remodel
Cost Range Approval
Building: Physics Hall
Room: 0038
Request date: 3/31/2023
Requested by: Suzanne Fisher
Contact: Scott Jasper
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
Renovation of this general university classroom to become an Active Learning Classroom. This would include moveable tables and chairs, supplemental writing surfaces around the perimeter of the room and well as supplemental monitors. We are aware that with two walls of window the supplemental writing surface and monitors may not be possible. Would like to have this be as active of a learning space as possible and we are just needing cost estimates at this time. It would be good to include the AVXT group on this project. Thank you. Katie Bl
PHYSICS-B0057-317040-Gate Improvements
Construction
Building: Physics Hall
Room: B0057
Request date: 10/23/2023
Requested by: Travis Applegate
Contact: Eric Ohrt
Construction start: 4/25/2024
Construction end: 12/2/2024
Description:
We were informed that the gate in this room cannot be locked for fire safety. We propose removing the lock into 57A, placing a lock on the gate, and updating the exit sign to point someone who got locked in to use the planetarium back exit. This would prevent the possibility of being locked into that area.
PRINT-0102-376500-Clean Air Duct System
Construction Documents
Building: Printing Building
Room: 0102
Request date: 7/17/2024
Requested by: Nathan Thole
Contact: Brian Grove
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Please provide an estimate to have the air duct system cleaned at the Printing Building.
PRINT-General-356815-Signage
Project Closeout
Building: Printing Building
Room: General
Request date: 4/25/2024
Requested by: Chris Johnsen
Contact: Joseph Stoberl
Construction start:
Construction end:
Description:
After an on-site review of our rooms with Wesley Gee, I would like to request having three ADA compliant room signage lenses manufactured. The clear room signage lenses should display the room numbers of 0119, 0122, and 0122A. Please see attached FP&M blueprint with corresponding plat numbers and approximate location of each room sign. Grey 8"x8" frames are already on-site, no additional frames are necessary. This is just for the ADA lenses with raise lettering and accompanying Braille.
ROSS H-0212-341913-Conference Room Signage
Construction Documents
Building: Ross Hall
Room: 0212
Request date: 2/7/2024
Requested by: Candice Miller
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
I was not sure if this would be considered a project? We need two new signs for each side of our Ross 212 Conference Room. The current signs are 14"L x 5"H. Black background with white lettering (I'll attach a photo to this request).
They currently say:
Department of English
Faculty-Graduate Student
Lounge & Reading Room
We would like new signs (same size to avoid wall repair) that say:
Department of English
Conference Room
ROSS H-0218-342683-Remodel
Project Closeout
Building: Ross Hall
Room: 0218
Request date: 2/16/2024
Requested by: Candice Miller
Contact: Jennifer Warrick
Construction start: 5/17/2024
Construction end: 9/17/2024
Description:
218 Ross Hall is currently more of a storage room right now, but we do keep a lot of DVD's stored in there for our Film Studies course instructor, among other miscellaneous items such as a couple of old desks, wheeled carts, etc. We are working on relocating the DVD's, and we can either Surplus some of the rest of the items, or move them to our other storage room, 318.
We are interested in converting 218 to a dining type area for people to use for lunch or breaks. We will not have any appliances or countertop electrical items, we mainly just want some tables and chairs to make it a nice space in which to eat or gather.
ROSS H-0218-350788-Lunchroom Sign
Construction Documents
Building: Ross Hall
Room: 0218
Request date: 3/27/2024
Requested by: Candice Miller
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Duane Strah stopped by today in reference to Request number 341913 which was for new signs needed for Ross 212. We talked with him about making a another new sign for what is going to be our new Lunchroom, 218 Ross. It will be exactly like the sign that hangs from the ceiling directing people to our mailroom, but it will say "Lunchroom", with arrows on each side pointing to the room. Duane suggested I put in this ticket.
ROSS H-0529-375579-New Office Furniture
Construction
Building: Ross Hall
Room: 0529
Request date: 7/9/2024
Requested by:
Contact: Jennifer Warrick
Construction start: 9/4/2024
Construction end: 12/2/2024
Description:
Filip Viskupic in the Political Science department would like to purchase furniture for his office. He would like to see what furniture is available, specifically rugs, bookshelves, and a printer stand.
ROSS H-GENERAL-342099-Wall Monitor Display Case
Project Closeout
Building: Ross Hall
Room: General
Request date: 2/9/2024
Requested by: Candice Miller
Contact: Jennifer Warrick
Construction start: 3/20/2024
Construction end: 6/13/2024
Description:
We have a 65" monitor that we would like to have mounted on the 2nd floor in the hallway, south wall, immediately preceding the 212 Ross Conference Room. We will need you to purchase the mount for the monitor.
There is an electrical outlet on that wall toward the ground that will need to be relocated so it sits behind the monitor.
Lastly, we would like to know an estimate on either purchasing a pre-made "box" to surround the monitor on each side to protect it from possible damage (if someone should accidentally catch their bookbag on it while walking through the hall, or other similar scenario), or if Carpentry could possibly make such a box.
ROSS H-General-383462- Signage Updates and Wayfinding Signage
Construction Documents
Building: Ross Hall
Room: General
Request date: 8/19/2024
Requested by: Kathleen Houseman
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Would like to replicate the signage in the stairwell for floors 2, 3, and 4 for floors 5 & 6. Also, curious about possible wayfinding options for the daily campus visitors and how to best direct them to the elevator if they enter the building though the NW door--the one looking towards the honors building.
Additional location information: Stairwell for floors 5 & 6. Wayfinding options on first floor to direct people to the elevator.
Work tags to attach: PG 100152
Ross-0201-389303-Add Modesty Panel to Desk
Cost Range Approval
Building: Ross Hall
Room: 0201
Request date: 9/5/2024
Requested by: Julia Hutchcroft
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
Add modesty panel to motorized standing desk.
SCHEMAN-M0020-293816-Water Pump Repair
Construction Documents
Building: Scheman Building
Room: M0020
Request date: 7/11/2023
Requested by: Eric Zierke
Contact: Brian Grove
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Equipment room M020 heating water pump #12 is leaking. Repair\Replace. Confirm Scott Nibe. This has not been completed per Don Gregory - it is running on a drop cord. It has been turned in to have the electric updated and hooked to system controls.
This project was sent from FPM Building Maintenance - Scott Nibe did some pump installation work and the last he knew the project was on hold until an electrical and Metasys solution for controlling the pumps can be found. So far the trades involved include, Facilities Mechanic, Electrician, Controls, Insulation. Please turn into a small project.
SCI 2- General-216813-Exit Sign Emergency Lighting
On Hold
Building: Science Hall Addition No. 2
Room: General
Request date: 8/22/2022
Requested by: Tamara Porter
Contact: Scott Jasper
Construction start: 12/26/2024
Construction end: 6/26/2025
Description:
Per the Safety Inspection Report rooms in Science II may need an exit sign emergency lighting include 502, 504, 514, 515, 517, 523, 526, 602, 608, 615, 619, 623, 637, and 706. Dr. Craig Abel could use a second opinion from somebody knowledgeable at ISU about this kind of thing. Then have the work completed. These are all USDA Labs.
SCI 2-0006-376376-Graduate Assistant Offices Furniture
Construction
Building: Science Hall Addition No. 2
Room: 0006
Request date: 7/16/2024
Requested by: Sandra Schroeder
Contact: Mitchell Hlavacek
Construction start: 10/9/2024
Construction end: 4/9/2025
Description:
I simply want to order approximately 40 office chairs and desks for our Graduate Assistant offices. We would like for the chairs to be adjustable height, on wheels/rollers, and have adjustable arms rests. The desks should be approximately 5 ft. x 2 1/2 ft. and have one set of drawers on the side. I'd like to see quotes with both the drawers attached to the desk and a 2-3 free standing/movable drawers that fit under the desks. Our budget is around $60K give or take. We currently have a hodge podge of chairs and desks in the Grad Assistant offices and will need help removing (surplusing) old desks and installing new. Thanks!
Additional location information: 0009, 0033, 0035, 0038, 0039, 0043, 0045, 0424
Work tags to attach: PG110409, DD00243
SCI 2-0333-310139-Conference Room Furniture
Project Closeout
Building: Science Hall Addition No. 2
Room: 0333
Request date: 9/15/2023
Requested by: Jennifer McGill
Contact: Jennifer Warrick
Construction start: 2/21/2024
Construction end: 5/24/2024
Description:
NREM would like to replace the existing conference tables with something comparable because they are showing wear and tear, and possibly the chairs too, depending on cost.
SCI 2-0440-361985-Carpet and Paint
Project Closeout
Building: Science Hall Addition No. 2
Room: 0440
Request date: 5/2/2024
Requested by: Asrun Kristmundsdottir
Contact: Scott Jasper
Construction start: 6/13/2024
Construction end: 11/12/2024
Description:
I don't know if I selected the correct sub type. I am looking for an estimate of how much it would cost to put a carpet in this office and paint the walls and how much does it cost to get an estimate like that done?
SCI 2-0612-403547- Update Infrastructure
Schematic Design
Building: Science Hall Addition No. 2
Room: 0612
Request date: 11/6/2024
Requested by: Jennifer McGill
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Craig Abel and Keith Bidne with the USDA/ARS are looking to replace the cage washer that is currently in 612 Science 2. They have a couple of questions about the existing infrastructure before they actually get the new (custom) one ordered.
1. It looks like the current electrical system is set up for 220v, but the new one requires 480v. Can FP&M install that in Science 2? What would that take?
2. The new washer will need 60# of steam pressure to operate. Science 2 is currently set at 30#. Can we safely boost the current setting to 60#?
3. Is it possible to get the floor cleaned and an epoxy coating put in before the new installation? Is that something FP&M does?
4. Does FP&M check the existing vent, damper, and motor for the exhaust? It has not been operational for quite some time.
5. Is there a schematic of the room somewhere to forward to the company ? (electrical, plumbing, etc.)
6. Can we have the drain pipes and floor drains inspected/repaired?
7. Where would we put the old pieces of the washer after demo while we are waiting on the new one? The old one will be picked up the same day the new one is delivered for installation, and there will likely be some lag time due to repairs/upgrades in the space.
They would like an estimate of any costs for changes to the room. For example, if bringing 480V/3 phase to the room is expensive, they may go back to the company building the cage washer to see if 240V is possible, etc. etc.
Thanks
SCI 2-General-378469-Investigate Leaks
Schematic Design
Building: Science Hall Addition No. 2
Room: General
Request date: 8/5/2024
Requested by: Justin Abbott
Contact: Brian Grove
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Investigate and make necessary repairs to radiant and reheat plumbing throughout building. Multiple Leaks throughout building.
SCIENCE-0177-368955-Renovations to Teaching Lab
Construction Documents
Building: Science Hall
Room: 0177
Request date: 6/7/2024
Requested by: Suzanne Ankerstjerne
Contact: Steven Daniels
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
The department would like to do some renovations to the teaching lab including new work station desks, instructor station/table with updated wiring to new flat screen display, moving existing projector screen, supplying power to the workstations either via conduit or from drop down outlets, and removing built-in drawers and counter on the west side of the room, leaving the sink in place. We have a rough design of the preferred layout. We need to source and install the desks, flat screen display, and instructor podium/table.
SCIENCE-0223-349073-HVAC Replacement
Project Closeout
Building: Science Hall
Room: 0223
Request date: 3/18/2024
Requested by: Ann Laws
Contact: Eric Ohrt
Construction start: 6/13/2024
Construction end: 9/25/2024
Description:
New HVAC with cost share between Dept. and FPM.
25% (LAS)
25% (Psych)
50% (FPM)
SCIENCE-0359-368956-Convert to Multi-Purpose Space
On Hold
Building: Science Hall
Room: 0359
Request date: 6/7/2024
Requested by: Suzanne Ankerstjerne
Contact: Denise Wulf
Construction start: 6/13/2024
Construction end: 9/25/2024
Description:
The department would like to convert this space into a multi-purpose conference/meeting/gathering space. The non-functioning hood, half walls, built in cabinetry needs to be removed. We would like help designing this space to optimize the space and be an attractive and functional meeting/conference space.
SCIENCE-0379-355331-AC Repairs or Replacement
Project Closeout
Building: Science Hall
Room: 0379
Request date: 4/9/2024
Requested by: Suzanne Ankerstjerne
Contact: Eric Ohrt
Construction start: 11/8/2024
Construction end: 11/12/2024
Description:
The ongoing problem with the ceiling AC unit needs to be elevated to a project. Year after year the occupants of this space have to deal with various leaks from an AC unit that was poorly installed and constantly leaks. It seems it is not possible to properly repair this unit so it may be time to replace it.
SCIENCE-0475BA-363884-Remodel
Project Closeout
Building: Science Hall
Room: 0475BA
Request date: 5/23/2024
Requested by: Jennifer Gentile
Contact: Alexa Peters
Construction start: 8/14/2024
Construction end: 10/15/2024
Description:
We have a faculty member moving into a recently vacated office. He would like an estimate on updating the carpet to match what was just put into the 4th floor hallway, updating the blinds to the newer shade style, and get prices for newer lighting, cleaning the ceiling heat vents, and painting (or maybe just patch painting some scuffed places). He would also like to discuss putting something over an unused doorway so that a TV can be mounted - possible removal of the door, and putting a sturdy paneling on both sides of the door frame - if that can be a thing?
SCIENCE-0485-369625-Lab Renovation
Construction
Building: Science Hall
Room: General
Request date: 6/17/2024
Requested by: Jennifer Gentile
Contact: Brady Streit
Construction start: 10/28/2024
Construction end: 4/28/2025
Description:
We have a new faculty member, Maria Schweer-Collins, starting in our department this fall and we would like to discuss renovating her space. She will be moving into Science 085 (lab). She will be visiting Ames and ISU on June 26, so it would be ideal if we could get a time to look at those spaces that afternoon. 2 or 3pm would be preferred.
SCIENCE-0487B-369624-Office Updates
Schematic Design
Building: Science Hall
Room: 0487B
Request date: 6/17/2024
Requested by: Jennifer Gentile
Contact: Carrie Choudhury
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Faculty member is moving into a soon to be vacated office and would like like to discuss having the office updated and new furniture ordered. Please use her startup account worktag: fsu_0000418. I can't get this account to work in the worktag boxes below.
SCIENCE-0492-372558-OFFICE - Paint, Carpet, Furniture, Shades
Construction
Building: Science Hall
Room: 0492
Request date: 6/27/2024
Requested by: Jennifer Gentile
Contact: Brady Streit
Construction start: 10/28/2024
Construction end: 4/28/2025
Description:
OFFICE - We have a new faculty member, Maria Schweer-Collins, starting in our department this fall and we would like to discuss renovating her spaces. She will be moving into Science 0492 (office).
SCIENCE-GENERAL-324081-Remodel
Budget Approval
Building: Science Hall
Room: General
Request date: 11/21/2023
Requested by: Jennifer Gentile
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
We are looking for estimates to renovate the 486/488 Science Hall suite. This may become a shared lab space between faculty members Tess Neal and Chris Meissner.
SCIENCE-General-331117-Wayfinding and Signage Improvements
Bidding
Building: Science Hall
Room: General
Request date: 12/20/2023
Requested by: Suzanne Ankerstjerne
Contact: Joseph Stoberl
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
This project includes the evaluation of existing signage, room numbering, and space allocations, and preparation of design and documentation to install new university standard accessible signage and new wayfinding signage in Science Hall.
SCIENCE-General-336656-PRV Study
Construction Documents
Building: Science Hall
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Donna Imhoff
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We would like to have the Engineering Team review the recently installed PRV for code compliance and safety in the mechanical room and develop a detailed plan for correcting any deficiencies found that could be either shared with a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
SCIENCE-General-336663-Water Heater Study
Cost Range Approval
Building: Science Hall
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
We would like to have the Engineering Team review the recent Water Heater Installation for code compliance and safety in the mechanical room and develop a detailed plan to correct any deficiencies found that could be shared with either a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
SCIENCE-GENERAL-341457-Student Lockers
On Hold
Building: Science Hall
Room: General
Request date: 2/3/2024
Requested by: Claudia Manahl
Contact: Scott Jasper
Construction start: 12/16/2024
Construction end: 6/16/2025
Description:
I would like to get some estimates and options for student lockers to be put in the hallways outside of the teaching laboratories in Science 1. The students can not bring coats into the lab and the lockers we currently have are very small and do not accommodate backpacks or big coats. I would also like the lockers to possibly have a key code for users to use for locking items. I need to know an estimate of this project and if it is feasible for us to move forward, what the time frame would be, etc..
SCIENCE-General-355027-PRV 4 Repairs
Construction
Building: Science Hall
Room: General
Request date: 4/4/2024
Requested by: John Netwal
Contact: Eric Ohrt
Construction start: 4/30/2024
Construction end: 12/2/2024
Description:
PRV 4 Repairs - Reference Project PR1231363 for findings.
Cost Range Estimate $26,000-$29,000
SE_REC_CX-General-381275-Dangerous Weather Detection System
Project Closeout
Building: Southeast Recreation Complex
Room: General
Request date: 8/5/2024
Requested by: Garry Greenlee
Contact: Brady Streit
Construction start: 11/7/2024
Construction end: 11/7/2024
Description:
Attention Wes Gee. Rec Services wants to install a lighting detection system at our outdoor field areas to notify users of dangerous weather. The three locations are SE Complex, SW Complex and Lied Rec Outdoor Field. The company Perry Weather will do the installation. We know where the locations would be for best coverage.
SEED-0121-376347-Purchase and Install Backup Generator
Project Closeout
Building: Seed Science
Room: 0121
Request date: 7/16/2024
Requested by: Steven Harris
Contact: Alexa Peters
Construction start:
Construction end:
Description:
Obtain an estimate for the purchase and installation of a backup generator for the Seed Science Center cold storage room.
SEED-0128-405081-Germination Lab Desks
Schematic Design
Building: Seed Science
Room: 0128
Request date: 11/22/2024
Requested by: Jessica Blake
Contact: Rebecca Cantrall
Construction start: 2/21/2025
Construction end: 8/22/2025
Description:
Create a separate request for the 128 Lab Desks Project.
SEED-0128A-382440- Furniture
Cost Range Approval
Building: Seed Science
Room: 0128A
Request date: 8/9/2024
Requested by: Jessica Blake
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
Request a new Desk and appropriate office furniture for 128A.
SEED-0178-362072-Casework
Construction
Building: Seed Science
Room: 0178
Request date: 5/3/2024
Requested by: Derrick Mayfield
Contact: Amy Tremain
Construction start: 10/29/2024
Construction end: 4/29/2025
Description:
Update cabinetry to support molecular testing.
SEED-GENERAL-323193-Room Signage
Project Closeout
Building: Seed Science
Room: General
Request date: 11/7/2023
Requested by: Derrick Mayfield
Contact: Joseph Stoberl
Construction start:
Construction end:
Description:
Adding and changing room signs to list room number only in Seed Science building, see below. Contact Derrick Mayfield for details (damayfie@iastate.edu, cell: 574-220-2593).
Room number Update
129 Room has no door signage, add sign listing number only
102AA Room has no door signage, add sign listing number only
189 Room has no door signage, add sign listing number only
188 Room has no door signage, add sign listing number only
174BB Room has no door signage, add sign listing number only
174BA Room has no door signage, add sign listing number only
183DA Room has no door signage, add sign listing number only
158 Room has no south door signage, add sign listing number only
196 Room has a sign with wrong identifier, change sign to list room number only
195E Room has a sign with wrong identifier, change sign to list room number only
185 Room has a sign with wrong identifier, change sign to list room number only
166 Room has a sign with wrong identifier, change sign to list room number only
164 Room has a sign with wrong identifier, change sign to list room number only
162 Room has a sign with wrong identifier, change sign to list room number only
110 Room has a sign with wrong identifier, change sign to list room number only
105A Room has a sign with wrong identifier, change sign to list room number only
SEED-Rooms 183D, 194 & 195E-396170-Interior Design & Furniture
Schematic Design
Building: Seed Science
Room: General
Request date: 10/9/2024
Requested by: Teresa Howard
Contact: Rebecca Cantrall
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
We have 3 rooms maybe 4 in the Seed Science Center that we want to make sure we are using the space in the best possible way. Our space is at a premium in the building and for now we are just looking to get some ideas and thoughts how we can improve the use of our space.
SICTR-0010-403773-Permanent building lighting
Schematic Design
Building: Student Innovation Center
Room: 0010
Request date: 11/18/2024
Requested by: Michael Rich
Contact: Troy Bowers
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
We would like to add permanent building lighting under the central staircase SICTR 0201 in the basement atrium, SICTR 0010, to better light the area directly under the staircase. This should be similar to what lighting was added under the Stepitorium stairs on first floor. Please provide a cost range estimate we can present to our Executive Director for approval. Thank you!
SICTR-1133-294083-Noise Reducing of Air Ducts
Construction Documents
Building: Student Innovation Center
Room: 1133
Request date: 7/13/2023
Requested by: Michael Rich
Contact: Brian Grove
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We have had multiple complaints of excessive noise from the air ducts in both room 1133 and 1118 in SICTR. Both rooms can get noisy enough people cannot hear each other without yelling when the air is flowing. Neither room has a false ceiling and if a wrap or padding added to the ducts in the rooms would not mitigate the noise level, it will likely require a barrier be added between the occupied area of the room and the duct work above.
Drawing in G drive and Lx Folder
SICTR-2222C-334767-Move Furniture from Mackay and LeBaron
Project Closeout
Building: Student Innovation Center
Room: 2222C
Request date: 1/3/2024
Requested by: Jennifer Plagman-Galvin
Contact: Eric Ohrt
Construction start: 4/26/2024
Construction end: 11/8/2024
Description:
Move furniture from Mackay and LeBaron hall to space.
We also need to have EE look at load requirements and determine if we have enough power for what we want to do in there. We have been working with Leigh Wiand and Will Scheller on the other Mackay projects so far; we would like to remain consistent on this as it is part of those larger projects.
SICTR-2239-342440-Student Lockers
Construction
Building: Student Innovation Center
Room: 2239
Request date: 2/13/2024
Requested by: Lili Sivils
Contact: Jennifer Warrick
Construction start: 8/9/2024
Construction end: 2/7/2025
Description:
Purchase student lockers for Apparel program/courses (AESHM Dept) offered in SICTR.
SICTR-3121-350082-Lockable Entry Door
Construction
Building: Student Innovation Center
Room: 3121
Request date: 2/11/2022
Requested by: Jim Oliver
Contact: Eric Ohrt
Construction start: 5/23/2024
Construction end: 12/2/2024
Description:
Need to design and install doors similar to SICTR 4222. Please contact Jennifer Frisvold and Wendy Kisch for further information.
03/26/2024 - Project Re-Opened with New Scope
The Student Innovation Center would like to resurrect the project listed in the subject line.
The previous estimated cost was $32,050. The bids came in under budget and was awarded to Bergstrom Construction. At that time, we ended up canceling the project because the needs changed.
Now they have a new, exciting use for the space, and they need a lockable door installed. Per the Provost’s direction, they are creating an Artificial Intelligence Innovation Studio for the university. Please plan to fast track this project, so they can get this studio up and running to meet the university’s needs.
Please reach out to Jim Oliver, Dani Orris, and Abram Anders if you have any questions. They may want a quick discussion in case they need any changes from what was previously designed.
SICTR-3121-392156-SICTR 3121 AI Innovation Studio
Construction Documents
Building: Student Innovation Center
Room: 3121
Request date: 10/1/2024
Requested by: Michael Rich
Contact: John Byerly
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
SICTR 3121 open study space is currently getting a door installed and will be re-designated 3112 AI Innovation Studio. This new AI Makerspace will have up to 8 computer work stations with a beefy server, and a fleet of small cameras, 1 wall mounted large digital TV display with solstice capability, and a mobile digital TV display. We need to make sure we have the electrical circuits and receptacles installed where we need them, as well as the data run for the computer workstations and wall mounted display, in order to run this new studio.
Attached is a mock up drawing of the initial plan layout of the equipment listed above, a screen shot of the Data Jack map, as well as the plan sheets and record drawings of the space provided to us by Steve Larson. Attn: Mike McCoy
SICTR-3133-344777-Faculty Office Renovation
Project Closeout
Building: Student Innovation Center
Room: 3133
Request date: 3/1/2024
Requested by: Julie Palmer
Contact: Jennifer Warrick
Construction start: 4/17/2024
Construction end: 7/1/2024
Description:
Senior Vice President and Provost Jonathan Wickert will be returning to faculty on June 30, 2024. His new office space has been identified as 3133 Student Innovation Center. This space is not currently a faculty office. This request is for design and furnishing as well as tech needs for this space for Provost Wickert. This space would need to be completed by the end of June.
SICTR-4220A-280141-Sparks Cafe Conduit
Project Closeout
Building: Student Innovation Center
Room: 4220A
Request date: 5/11/2023
Requested by: Benjamin Lutgens
Contact: Jennifer Warrick
Construction start: 2/9/2024
Construction end: 8/20/2024
Description:
Sparks Cafe area on 4th floor
1) Short term need: 3 pc's located behind menu displays need to be removed from wall and made accessible for repair
2) Project need: recommendation and price quote to have display cabling routed from TVs to a termination at ground level.
Potential options include terminating at prep counter area, or through wall to dry good storage area. Final cable termination point will need network/data access.
Preference towards lowest-cost and least invasive solution, and willing to consider in wall or out of wall runs or conduit to solve.
Looking for a price quote ONLY to approve/decline before work would begin. IT can be on site during survey to provide further details
SICTR-4220A-309716-Security Curtain Replacement
Construction
Building: Student Innovation Center
Room: 4220A
Request date: 9/13/2023
Requested by: Michael Rich
Contact: Brady Streit
Construction start: 2/9/2024
Construction end: 12/2/2024
Description:
Remove existing 4th floor security grille and replace existing security curtain with a manually operated system. The new system would keep existing structural track with minimal lock down posts (5) to be operated outside of grille. The work costs includes modifications to pocket with support of modified track.
SICTR-4227-382678-Window Washing
Project Closeout
Building: Student Innovation Center
Room: 4227
Request date: 8/13/2024
Requested by: Marcy Cheville
Contact: Amy Tremain
Construction start: 8/27/2024
Construction end: 9/12/2024
Description:
This is for rooms SICTR 4227 & 4229. Each room has a floor to ceiling window. I need both of these windows cleaned inside and outside.
SICTR-4227-384020-Clean Art
Budget Approval
Building: Student Innovation Center
Room: 4227
Request date: 8/22/2024
Requested by: Marcy Cheville
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
We have two new art pieces on the 4th floor of the Student Innovation Center outside of our CALS rooms SICTR 4227 & 4229 that need to be cleaned once every Fall and Spring semester, for a total of twice a year. The art pieces include: a wall mural outside of these rooms and a been/pollen ceiling pendant light fixture around the corner of these rooms. This would be a lifetime on going project for these two artowrk pieces to be cleaned.
Please clean the surface using a lint-free cloth to avoid scratches. A non-ammonia-based cleaner, such as Sprayway, is ideal for removing dirt and grime without damaging the finish. If only dust is observed, a handheld lint-free microfiber duster can be used with care to gently remove it, especially between the layers of the mural
where dust may accumulate. Regular inspections can help determine the need for additional cleaning. These maintenance steps will help ensure the mural remains a vibrant centerpiece for years to come.
I need an estimate of cleaning these artwork pieces twice a year.
Please charge to SG2705946, DD07867, Line memo: On going cleaning and maintenance of the CALS Innovation Inspiration Artwork pieces in SICTR 4227 and 4229. Wall mural and bee/pollen ceiling light pendant.
SLOSS H-0101-342669-Furniture
Project Closeout
Building: Sloss House
Room: 0101
Request date: 2/16/2024
Requested by: Sara Schmidgall-Kellogg
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
We are looking for soft-sided furniture for the Margaret Sloss Center front lounge space where the 'kid's corner' is located. This furniture would be appropriate for the kids that come into the space, but also is sufficient to support adults, during times when the space is busier with students and no children are present. Specifically, we are looking at the soft-sided furniture from the Steelcase B-Free lounge series, with 2 or 3 small cubes (in yellow) surrounding the red Alight round ottoman.
ST GYM- General-296665-Pool Condensation Investigation
Construction
Building: State Gymnasium
Room: General
Request date: 7/27/2023
Requested by: Garry Greenlee
Contact: Brady Streit
Construction start: 3/5/2024
Construction end: 12/2/2024
Description:
John Byerly is familiar with this request. At the State Gym expansion there is what we believe is a condensation/freezing issue where the pool ceiling/roof meets the dry part of the building. This results in a "leak" when the frozen condensation melts and it is a significant amount. Part of this may involve removing some of the wall panels, looking at insulation, roofing and air flow.
ST GYM-0180A-403557-Convert or replace desktop
Budget Approval
Building: State Gymnasium
Room: 0180A
Request date: 11/7/2024
Requested by: Garry Greenlee
Contact: Denise Wulf
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
State Gym office 0180B needs their desk top to converted or replaced with an elevating desk top.
ST GYM-0220AA-404955-CO2 Tank for Pool Filter Room
Schematic Design
Building: State Gymnasium
Room: 0220AA
Request date: 11/21/2024
Requested by: Casey Bubke
Contact: Mike McCoy
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
CO2 Tank. I would like to get an estimate for installing and permanent CO2 tank in the State Gym pool filter room like what is currently being used for Beyer Pool for the purpose of balancing water chemistry. Ideally the tank would go into 0220AA which formerly held acid barrels. Penetrations in the ceiling of 0220AA leading to the former fill port on the exterior west side of building still exist.
ST GYM-1209-350864-Sprinkler System Repairs
Construction
Building: State Gymnasium
Room: 1209
Request date: 3/28/2024
Requested by: Casey Bubke
Contact: Brady Streit
Construction start: 7/17/2024
Construction end: 1/15/2025
Description:
Sprinkler System. Rooms: 1201 & 1209. Please get estimate for a dry control valve serving sprinkler heads in vestibules, room numbers: 1201 and 1209. Current sprinkler line is charged "wet "and is prone to freezing, vestibule heaters are undersized for amount of traffic. Need pricing for dry valve to mitigate frozen heads.
ST GYM-2129-403555-Purchase new desk
Construction Documents
Building: State Gymnasium
Room: 2129
Request date: 11/7/2024
Requested by: Garry Greenlee
Contact: Rebecca Cantrall
Construction start: 1/16/2025
Construction end: 7/17/2025
Description:
State Gym office 1180K we are relocating some desk pieces to another office area. I need to replace like for like in this office.
Updating to room 2129.
STADIUM- General-309051-Paint North Scoreboard
Project Initiation
Building: Jack Trice Stadium
Room: General
Request date: 9/6/2023
Requested by: Andrew Kautman
Contact: Jonathan Harvey
Construction start: 2/14/2024
Construction end: 8/14/2024
Description:
Attn: Jon Harvey - Can you submit a service request to have FPM review the paint on the Jack Trice north end zone scoreboard structure? I noticed some areas that may need to be repainted to prevent corrosion.
STADIUM-General-383772-Replace Northside East and West Roll-Up Gates
Schematic Design
Building: Jack Trice Stadium
Room: General
Request date: 8/20/2024
Requested by: Andrew Kautman
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
REPLACE THE NORTHSIDE EAST AND WEST ROLL-UP GATES LEADING DOWN TO THE FOOTBALL FIELD
STATE O-GENERAL-362655-17 Cubicle Name Plates
Project Closeout
Building: State Avenue Office Building
Room: General
Request date: 5/13/2024
Requested by: Linda Young
Contact: Joseph Stoberl
Construction start:
Construction end:
Description:
Please order 17 of the 4x8 inch Cubicle Name Plates in Black.
Deliver to Linda Young, Extension 4-H Youth #1110. We will install ourselves.
Thank you!
Need billed in FY24.
STD HTH-1305A-382382- Updating Air Flow in 1305A
Construction
Building: Thielen Student Health Center
Room: 1305A
Request date: 8/8/2024
Requested by: Robin Greenlee
Contact: Eric Ohrt
Construction start: 8/28/2024
Construction end: 2/26/2025
Description:
The external air conditioner in lab is not working properly. Parts were replaced last year but it is continuing to have issues.
Service Request 348771 being converted to a project for Engineering to look at increasing air flow to this area so that a mini-split unit is not needed.
STD SER- General-252672-Move Pressure Reducing Valve
Construction Documents
Building: Student Services Building
Room: General
Request date: 1/18/2023
Requested by: John Netwal
Contact: Mike McCoy
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Please put together a project to move the PRV in this building from its current location. It is currently in a crawlspace under the building where there is no floor (dirtmud only) making repairs, adjustments, etc. difficultdangerous. I will need a scope and cost for this project only.
STD SER-3rd Floor-362763-Flooring and Painting
On Hold
Building: Student Services Building
Room: General
Request date: 5/17/2024
Requested by: Marcie Cleland
Contact: Denise Wulf
Construction start: 12/26/2024
Construction end: 6/26/2025
Description:
Hello, I work at Student Counseling Services and we are wanting to get estimates done and figure out what the process would look like for us to complete the following projects.
1. Changing flooring throughout the entire 3rd floor of Student Services. We are wanting to know what the cost would be if we got carpet everywhere compared to the price of having certain areas tiled as well. We are wanting to match the style of the first floor of Student Services if possible.
2. Patching and painting the entire 3rd floor of Student Services.
STD SER-General-338221-Fire Escape Repairs
Construction Documents
Building: Student Services Building
Room: General
Request date: 1/30/2024
Requested by: John Netwal
Contact: John Byerly
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Fire Escape Repairs - Fire Escape Inspection Report in the LX folder and G Drive folder.
Bricks appear to be coming loose below the third-floor landing where the fire escape attaches to the exterior of the building. Have the fire escape inspected by a registered design professional and place particular emphasis on this area. By section 1104.16.5.1 this should be repeated every 5 years.
STD SER-General-385450- Air duct, Vent Cleaning on Various Floors
Bidding
Building: Student Services Building
Room: General
Request date: 8/28/2024
Requested by: Heather Shafer
Contact: Eric Ohrt
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
Good morning! We need a QUOTE for cleaning the air vents in the Student Services building. The third floor has already had theirs cleaned recently. We would like a quote on cleaning the vents in these areas: East Basement, First floor, Second floor. We are ONLY looking for a quote at this time. Please break the quote up by floor. Thank you!
STEPHEN- General-273433-Ticket Office Structural Repairs
Project Closeout
Building: Stephens Auditorium
Room: General
Request date: 4/18/2023
Requested by: John Netwal
Contact: Alexa Peters
Construction start:
Construction end:
Description:
Curtain wall around ticket office; the support on the bottom has rust through. Requesting structural engineering support and estimate for repairs.
5/16/2023 - Andrew Mott
I would to explore putting a storefront window system in the ticket office.
STEPHEN- General-279324-Exterior Steps Repair
Construction Documents
Building: Stephens Auditorium
Room: General
Request date: 5/2/2023
Requested by: John Netwal
Contact: Joseph Stoberl
Construction start: 12/28/2024
Construction end: 6/28/2025
Description:
estimate to repairs exteriors steps on East side of Stephens North parking lot headed to Harvester Plaza
STEPHEN- General-279416-Remove Sanitary Drain from Storm Sewer
Project Closeout
Building: Stephens Auditorium
Room: General
Request date: 5/3/2023
Requested by:
Contact: Eric Ohrt
Construction start:
Construction end:
Description:
Need to remove sanitary drains from storm sewer (Note: The Iowa DNR calls this an "illicit discharge" in their report to EHS).
1. A transformer vault on the SW corner contains a floor drain to storm sewer. Should this transformer fail, oil could feasibly reach the sewer.
2. A mechanical room on the SW corner contains an air handling unit drained to storm. This is located on the floor above the basement.
3. Two mechanical rooms contain floor drains to the storm sewer.
EH&S needs for action plan by the end of May.
STEPHEN- General-304753-Stair Lighting
Construction Documents
Building: Stephens Auditorium
Room: General
Request date: 8/28/2023
Requested by: Andrew Kautman
Contact: Mike McCoy
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Investigate the cost of installing new stair lights at CY Stephens. This is a 50/50 cost share with FPM and Athletics.
STEPHEN-0001-381518-Install Coils on AHUs
Schematic Design
Building: Stephens Auditorium
Room: 0001
Request date: 8/6/2024
Requested by: Lyle Bishop
Contact: Mike McCoy
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Install 4 coils (2 for each) AHU4 and AHU2. Coils have been patched to make it through cooling season but need replacement. New coils are being stored at the South Campus Storage Facility until needed. Coils were ordered by Eric Zierke on WO# 368679.
STEPHEN-0035-389032- Replace Glass and repair steel support on large window
Construction Documents
Building: Stephens Auditorium
Room: 0035
Request date: 9/3/2024
Requested by: James Bohl
Contact: John Byerly
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Replace glass on the window on ground floor vestibule on the west side of the ticket office. Also repair steel support under the window as well.
SUKUP-0205-381321-Replace Door Sign
Project Initiation
Building: Sukup Hall And Atrium
Room: 0205
Request date: 8/5/2024
Requested by: Cindy Frame
Contact: Joseph Stoberl
Construction start: 10/27/2024
Construction end: 4/27/2025
Description:
the door sign has fallen off. We would like a new sign that is just the room number 0205 - no wording. It is the small sign.
SUKUP-0209-294005-Eyewash Station Repair
Construction Documents
Building: Sukup Hall And Atrium
Room: 0209
Request date: 7/13/2023
Requested by: Cindy Frame
Contact: Mike McCoy
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Eyewash station in 0209 Sukup needs attention. It takes abnormally long to clear rust particles during the monthly flushing. It is getting worse overtime. At its current condition, it probably requires daily flushing to keep the water clear of contaminants. I believe we need to install a water filter for that specific station. That station situates at the bottom of a straight pipe that connect eyewash stations on the upper floors. Sediments settle to the bottom which is the inlet for that particular station. Frequent flushing is not a long term solution. We need FP M help to install the filter or discuss options to fix the problem.
SUKUP-1218-383230-Install Amp Outlet
Budget Approval
Building: Sukup Hall And Atrium
Room: 1218
Request date: 8/16/2024
Requested by: John Sheriff
Contact: Denise Wulf
Construction start: 12/17/2024
Construction end: 6/17/2025
Description:
I need to have a 208V ~40 amp outlet installed for soil bin to power a frequency drive that runs a tiller motor.
If needed for timing reason we could use Jaspering Electric (let me know if that would be okay)
Ideally getting this done before the semester start is rather a tight timeline!
SUKUP-4204AA-405101-Percival Unit Solution
Schematic Design
Building: Sukup Hall And Atrium
Room: 4204AA
Request date: 11/21/2024
Requested by: Justin Abbott
Contact: Brian Grove
Construction start: 2/21/2025
Construction end: 8/22/2025
Description:
Percival came in a few years ago and converted it from Bio-cold to a new Percival controller and ever since we have had consistent issues with the room not defrosting properly and causing ice buildup that is damaging the equipment and the research stored inside. We need a different solution than just defrosting it and replacing the drain pan once or twice a year. Percival has been back multiple times and the situation has not changed.
SW Rec Complex-SWCLBST-Cap Timm Field-388953-Replace Fence & Poles
Construction Documents
Building: SW Rec Complex Sports Club Storage
Room: General
Request date: 9/3/2024
Requested by: Brent Cunningham
Contact: Brady Streit
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Replace entire fence and foul poles at Cap Timm BB field. See attached quotes from Door and Fence Store and Thrive Fencing. Inc
Contact Brent at 515-451-7280 with questions
SW_REC_CX-General-376210-Relocate Scoreboards
Schematic Design
Building: SW Recreation Complex
Room: General
Request date: 7/15/2024
Requested by: Brent Cunningham
Contact: Troy Bowers
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Relocate the two scoreboards on the west side of MWL playfields out to the SW complex. One to the softball field and one to the baseball field. Also include the demo of the 2 existing big scoreboards currently out at the SW Complex. This will be similar to the project Brady Streit is working on for the MWL/Lied play fields. I will work with NGE on quotes. I will need an estimate for the electrical hookup for the relocated scoreboards.
Any questions contact Brent@ 515451-7280
SWEENEY- General-287742-Generator Study
Cost Range Approval
Building: Sweeney Hall
Room: General
Request date: 6/21/2023
Requested by: Michelle Stotts
Contact: Scott Jasper
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
Request 141566 from Nov 18, 2021 was marked as completed by the FPM team, but I don't recall receiving answers to all of our questions. In particular,
1) what is hooked to the generator
2) would it be possible to add other items to the generator, such as the walk in cooler in 2024 and the -80 freezer in 2058
3) what are the pros and cons of doing that.
Original Request: Since the derecho we have had several questions about the Sweeney Hall generator(s) and would like someone to help us with our questions such as
1) do we have one or two generators for Sweeney (there is one north of the building and one on the roof of the new wing)
2) what is hooked to the generator
3) would it be possible to add other items to the generator, such as the walk in cooler in 2024 and the -80 freezer in 2058
4) what are the pros and cons to doing that.
Type Electrical | Generators Assigned To Todd Kelley Closing Comments closing out old work orders, if have questions contact Service Center Status has been changed to Closed.
Sending Request to FDC from FPM Building Maintenance -
We would like an electrical engineer to determine if this work is possible.
SWEENEY-General-336665-PRV Study
Construction Documents
Building: Sweeney Hall
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Mike McCoy
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We would like to have the Engineering Team review the recent PRV installation for code compliance and safety in the mechanical room and develop a detailed plan to correct any deficiencies found that could be either be shared with a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
Town - Rm 0387 - 398897 - Provide 3 Independent Circuits and Temperature Control
Schematic Design
Building: Town Engineering Building
Room: General
Request date: 10/30/2024
Requested by: Nancy Qvale
Contact: William Scheller
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
Provide a cost range estimate to provide the following features in room 0387. Provide a separate estimate for each room as we use the estimates to select the best path forward.
--Provide 3 independent, isolated circuits, such that 3 computers could be hosted on each circuit
--Provide temperature control. The room will need to be able to be cooled, as the computers will generate heat.
TOWN-0074-362380-Replace Emergency Power Generator
Construction
Building: Town Engineering Building
Room: 0074
Request date: 5/13/2024
Requested by: Scott Jasper
Contact: Eric Ohrt
Construction start: 11/8/2024
Construction end: 5/9/2025
Description:
Replace emergency power generator with abandoned generator from Gerdin
TOWN-0130-376731-Overhead Door North Structures Lab
Construction
Building: Town Engineering Building
Room: 0130
Request date: 7/23/2024
Requested by: Nancy Qvale
Contact: Eric Ohrt
Construction start: 11/8/2024
Construction end: 5/9/2025
Description:
Provide cost analysis and possible solutions for overhead door issues in the north structures lab, room 130
Wooden overhead door -- the north door on the west side: Door is in bad condition and is not used because of this. Provide estimate to infill.
West side, south door: Provide estimate to upgrade the seal package to reduce excessive infiltration and rodents through gaps. Provide estimate to replace door with one that fits better for improved energy efficiency.
Photos attached
Work tags to attach: SG0518112
TOWN-0134-382561-Repurpose Office Space
Cost Range Approval
Building: Town Engineering Building
Room: 0134
Request date: 8/9/2024
Requested by: Nancy Qvale
Contact: Denise Wulf
Construction start: 2/10/2025
Construction end: 8/11/2025
Description:
Repurpose Town 134 into graduate student office space.
TOWN-0178-343193-New Diffusers
Project Closeout
Building: Town Engineering Building
Room: 0178
Request date: 2/20/2024
Requested by: Nancy Qvale
Contact: Eric Ohrt
Construction start: 3/13/2024
Construction end: 3/28/2024
Description:
The new diffusers in room 0178.
TOWN-0179 & 0180-356586-Furniture
Project Closeout
Building: Town Engineering Building
Room: 0179
Request date: 4/28/2024
Requested by: Nancy Qvale
Contact: Eric Ohrt
Construction start: 6/13/2024
Construction end: 10/18/2024
Description:
Purchase and install 3 height adjustable desks, 4 chairs, 5 ped files, and one short cabinet for storage and printer. Work will be approved, please proceed with final design.
Worktags to attach: SG0500055
TOWN-0210-335116-Furniture Replacement
Construction
Building: Town Engineering Building
Room: 0210
Request date: 1/8/2024
Requested by: Nancy Qvale
Contact: Eric Ohrt
Construction start: 6/4/2024
Construction end: 12/3/2024
Description:
Please provide a plan and detailed estimate for new furniture in Town 210. I had briefly discussed this with Rebecca but I don’t think we ever got to the point of a drawing. Maybe we did and I just don’t remember it.
TOWN-0220-335117-Chairs Replacement
Bidding
Building: Town Engineering Building
Room: 0220
Request date: 1/8/2024
Requested by: Nancy Qvale
Contact: Eric Ohrt
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
Provide detailed estimate to replace the chairs in Town 220.
TOWN-0474-350890-Furniture
Project Closeout
Building: Town Engineering Building
Room: 0474
Request date: 3/28/2024
Requested by: Nancy Qvale
Contact: Jennifer Warrick
Construction start: 7/10/2024
Construction end: 9/19/2024
Description:
Discuss, purchase, and install furniture for new Assistant Professor.
Department account (PG101370) for design services; Startup (provided later) for purchase and install.
Work tags to attach: PG101370
4/11/24 - Adding Scope
have a TV display in her office (0474) like in the office next door (0458)
TOWN-C0124-397165-Paint Sections of Hallway
Bidding
Building: Town Engineering Building
Room: C0124
Request date: 10/23/2024
Requested by: Nancy Qvale
Contact: Eric Ohrt
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
Paint sections of hallway C0124 outside of 0130 and 0164 gray to match the gray found on 2nd floor. See Nancy Qvale for exact locations to be painted.
TOWN-General-330464-Electronic Schedulers
Project Closeout
Building: Town Engineering Building
Room: General
Request date: 12/18/2023
Requested by: Nancy Qvale
Contact: Eric Ohrt
Construction start: 4/1/2024
Construction end: 6/13/2024
Description:
Electronic schedules for classrooms and conference rooms: Please proceed with planning and a detailed estimate. The rooms we are interested in including at this time are 106, 178, 196, 210, 220, 310, 316, 322, 388.
________________________________________________________________________________________________
Separated into Individual Projects 1/8/2024
Rough estimates for planning purposes only. No details necessary. Please provide by December 31 if at all possible. After receiving these ballpark numbers, we will discuss and submit additional service requests for more detailed estimates.
1) PR1226781-TOWN-General-330464-Electronic Schedulers: Electronic schedules for classrooms and conference rooms that could be available at the door. Similar to what is on the first floor of the Library. Cost per door will suffice at this time.
2) PR1229910-TOWN-0134-335113-Carpet Replacement: Replace carpet in Town 134, ~1011 square feet
3) PR1229912-TOWN-General-335115-Hallway Furniture Replacement: Replace furniture and add outlets in the north-south hallway on the west side of Town Engineering
4) This is being added to a larger Capital Project: Replace cabinetry in Town 160; replace or update the flooring in this room
5) PR1229911-TOWN-0178-335114-Acoustic Panels: Acoustic panels in Town 178
6) PR1229913-TOWN-0210-335116-Furniture Replacement: Please provide a plan and detailed estimate for new furniture in Town 210. I had briefly discussed this with Rebecca, but I don’t think we ever got to the point of a drawing. Maybe we did and I just don’t remember it.
7) PR1229914-TOWN-0220-335117-Chairs Replacement: Provide a detailed estimate to replace the chairs in Town 220.
TOWN-General-336671-Heat Exchanger Study
Construction Documents
Building: Town Engineering Building
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Mike McCoy
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
We would like to have the Engineering Team review the recently replaced Heat Exchanger for code compliance and safety in the mechanical room and develop a detailed plan to correct any deficiencies found that could be shared with either a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
TOWN-General-355438-Exterior Building Signs
Bidding
Building: Town Engineering Building
Room: General
Request date: 4/10/2024
Requested by: Nancy Qvale
Contact: Joseph Stoberl
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
ATTN: Joe Stoberl
Relocate Town Engineering Building sign on east side of building to the south, just south of the bike racks, between the two trees near the diagonal walk.
Install a second Town Engineering Building sign on the north side of the building.
Project and both locations have been discussed with Joe.
TOWN
Additional location information: North and east side of building; exterior
Work tags to attach: PG101370
TOWN-Room C0124-335115-Furniture Replacement
Construction
Building: Town Engineering Building
Room: C0124
Request date: 1/8/2024
Requested by: Nancy Qvale
Contact: Eric Ohrt
Construction start: 7/9/2024
Construction end: 1/7/2025
Description:
Replace furniture in the north-south hallway on the west side of the building: Please proceed with planning and a detailed estimate.
TRAN SR-General-343618-New Exterior Building Sign
Construction Documents
Building: Transportation Services
Room: General
Request date: 2/26/2024
Requested by: Jeremy Paul
Contact: Joseph Stoberl
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
New Exterior Building Sign at Transportation Services
TROXEL-1010-357962-Reupholstery Chairs
Bidding
Building: Troxel Hall
Room: 1010
Request date: 5/2/2024
Requested by: Suzanne Fisher
Contact: Jennifer Warrick
Construction start: 12/11/2024
Construction end: 6/11/2025
Description:
The upholstery on the backs of the chairs in the lobby has become very worn. The new upholstery - fabric or vinyl, needs to be very durable. Material with a variety of color would be nice. There are 24 seat backs that are in need of re-upholstery. I have visited with Rebecca about this project and am okay with the Intern working on this request, as I know how busy everyone is and this is not a rush project. Thank you! Katie B.
TROXEL-General-355031-Domestic Water Heater Study
Construction Documents
Building: Troxel Hall
Room: General
Request date: 4/4/2024
Requested by: John Netwal
Contact: Mike McCoy
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Engineering review of the Domestic Water Heater and associated piping in Troxel for Code Compliance and safety. Mike McCoy, is familiar with some of the issues and I would like to have him take a closer look, develop a scope of work and cost range to bring this system into code and safety compliance to ISU standards. Please let me know if you have any questions.
VARIOUS- General-274845-Tree Campus USA 2023
Construction
Building: Various Building Locations
Room: General
Request date: 4/26/2023
Requested by: Rhonda Martin
Contact: Rhonda Martin
Construction start: 5/23/2023
Construction end: 12/2/2024
Description:
Tree Campus USA 2023
VARIOUS- General-289006-FY24 Campus Beautification and Memorial Support
Construction
Building: Various Building Locations
Room: General
Request date: 6/26/2023
Requested by: FPM Service Desk
Contact: Rhonda Martin
Construction start: 7/12/2023
Construction end: 12/2/2024
Description:
FY24 Campus Beautification and Memorial Support
VARIOUS- General-295336-Various Classroom Furniture Moving FY24
Bidding
Building: Various Building Locations
Room: General
Request date: 7/20/2023
Requested by: Kathleen Baumgarn
Contact: Eric Ohrt
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
Various Classroom Furniture Moving FY24
VARIOUS- General-295342-Various Classroom Improvements FY24
Bidding
Building: Various Building Locations
Room: General
Request date: 7/20/2023
Requested by: Kathleen Baumgarn
Contact: Eric Ohrt
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
Various Classroom Improvements FY24
VARIOUS- General-300369-Welch Road Pedestrian Bridge Study
Construction
Building: Various Building Locations
Room: General
Request date: 8/1/2023
Requested by: John Netwal
Contact: Eric Ohrt
Construction start: 3/28/2024
Construction end: 12/2/2024
Description:
Welch Road Pedestrian Bridge Engineering Study
MIC Approved $45,000 FY24
VARIOUS-Emergency Power Improvements- Music, Carver, Enrl
Construction Documents
Building: Various Building Locations
Room: General
Request date: 3/15/2021
Requested by: John Netwal
Contact: Eric Ohrt
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Emergency Power Improvements- Music, Carver, Enrl
VMRI 01-S0007-267208-Building Leaking Condensate
Project Closeout
Building: Vet Research Main Laboratory#1
Room: S0007
Request date: 3/23/2023
Requested by: John Netwal
Contact: Scott Jasper
Construction start: 5/18/2023
Construction end: 11/13/2024
Description:
We have a leaking steam condensate line leaking inside a concrete foundation wall that needs to be repaired.
See picture in G Drive and Lx Folder
VMRI 02-0105-325225-Air Handler Repairs
Construction
Building: Vet Research Laboratory #2
Room: 0105
Request date: 11/30/2023
Requested by: Eric Zierke
Contact: Eric Ohrt
Construction start: 7/12/2024
Construction end: 1/10/2025
Description:
The air handler in VMRI 02 has a broken steam coil for heating. This repair will also likely require the removal of duct work and steam piping. Mike Moore and Eric Zierke have more information if needed. This was originally a shop's work order 323485.
Attention: Eric Ohrt
VMRI 12-GENERAL-396144-Replace plywood around window a.c. units
Construction Documents
Building: Vet Research Laboratory #12
Room: General
Request date: 10/9/2024
Requested by: Justin Abbott
Contact: Steven Daniels
Construction start: 12/27/2024
Construction end: 6/27/2025
Description:
Please replace plywood around window air units
If possible use treated wood.
Need to keep birds out
VMRI 12 looks like all units and 1 window
See Original Shops request: 368995
VMRI 40- General-206049-Estimate for Generator Replacement
Schematic Design
Building: Vet Res Animal Holding #40
Room: General
Request date: 7/11/2022
Requested by: John Netwal
Contact: Mike McCoy
Construction start: 6/20/2026
Construction end: 12/19/2026
Description:
Estimate to replace generator for VMRI 40. This unit is an old International model with no support for replacement parts. Also the size of the generator should be checked, this one could be undersized. NTE $5000
VMRI 40-General-329818-Cage Washer Installation
Schematic Design
Building: Vet Res Animal Holding #40
Room: General
Request date: 12/12/2023
Requested by: Dean Isaacson
Contact: John Byerly
Construction start: 2/20/2025
Construction end: 8/21/2025
Description:
This request is for concrete floor and wall modifications to the LAR Building 40 and LAR Central animal facility cage washer rooms to install a new cage washer in each facility. We have accepted the purchase bid for the cage washers and ASAP we need to have a contractor assess the concrete work needed done to accommodate the installation of larger replacement cage washer units. I recommend that we contact Story Construction for this assessment, estimate, and work. One of the cage washer vendors, that did not receive our bid, had Story Construction do this assessment and cost estimate for them as part of their bid so I know that Story Construction is familiar with what will need done and is capable of performing the work. Please give me a call if questions. PLEASE USE WORKTAG SG0735162 Thanks - Dean
Scope Update:
This project is now going to encompass the entire demolition of the old cage washers in VMRI 40 and Patterson Hall and install of the new cage washers in both buildings.
(Separate projects per building)
PR1223962-VMRI 40-General-329818-Cage Washer Installation
PR1226578-PATTRSN-General-330452-Cage Washer Installation
WILLOW-General-341826-Replace "W" in Willow Sign
Project Closeout
Building: Willow Hall
Room: General
Request date: 2/6/2024
Requested by: Cynthia Manning
Contact: Joseph Stoberl
Construction start:
Construction end:
Description:
The "W" in Willow is broken on the exterior of the catwalk to Willow Hall. Pictures will be attached. Attention Joe Stoberl.
ZAFFRNO-A0005-362091-Raising the Ceiling
Project Closeout
Building: Zaffarano Physics Addition
Room: A0005
Request date: 5/3/2024
Requested by: Leigh Wiand
Contact: Denise Wulf
Construction start: 10/18/2024
Construction end: 10/18/2024
Description:
After speaking with Eric Ohrt, we would like to have an architect come out and meet with our carpenter to discuss the need to open up a ceiling in this space to make room for lab equipment that needs connection tubing to go into the top of the unit that is taller than the current ceiling allows. Our carpenter has an idea that he would like to discuss with the ISU architect. This does not affect the floor above in anyway.
ZAFFRNO-A0006-392766-Replace Helium Bag
Construction
Building: Zaffarano Physics Addition
Room: A0006
Request date: 10/1/2024
Requested by: Josef Biechler
Contact: Amy Tremain
Construction start: 10/29/2024
Construction end: 12/2/2024
Description:
I need project coordination help with ISU FPM for replacing the Helium bag in the basement of Zaffarano for Ames Lab.
Project includes soldering and brazing, so we will need help getting hot work permits and fire alarm shutdowns
ZAFFRNO-A0102-362061-Doorway Modifications
Construction
Building: Zaffarano Physics Addition
Room: A0102
Request date: 5/2/2024
Requested by: Payton Crilly
Contact: Eric Ohrt
Construction start: 11/8/2024
Construction end: 5/9/2025
Description:
The Ames Laboratory is installing a new liquefiere in the Low Temperature Lab in Zaffarano A0102. We will have to widen the doorway between A0108 and A0102 to install this new equipment. I would like to work with FPM Projects and Design team on this. We have met with Eric Ohrt and Travis Applegate on this recently. This project is urgent. A top priority for the laboratory.