Facilities Design Manual
Current Version
Part 1 General Requirements | Part 1 Support Documents | Part 2 Design Criteria | Part 2 Support Documents | Part 2 Support Documents - Drawings |
Part 1 General Requirements
Section 00 - Introduction | |
---|---|
Section 01 - Working Relationships | |
Section 02 - Codes and Regulations | |
Section 03 - Space and Site Design | |
Section 04 - Not Used - Reserved for Future Expansion | |
Section 05 - Pre-Planning and Building Programming | |
Section 06 - Schematic Design Phase | |
Section 07 - Design Development Phase | |
Section 08 - Construction Document Phase | |
Section 09 - Bidding and Construction Phases |
Part 1 Support Documents
Building Program v2022.01 | docx |
---|---|
Door Numbering Standards | |
Fall Protection and Roof Safety Design Standards v5.0 | |
FICM Partial Chapter 4 | |
ISU NPDES DETAILS 01 13 | |
ISU SOP For Development Of NPDES Construction Permits | |
Landscape and Site Design Development Checklist | xls |
Min Req LEED Points For New Const CP Bldg Projects | xls |
Review Comments | xls |
Room Numbering Standards | |
Schedule of Values Workbook | xlsm |
Schematic Design Booklet (BOR) 07-09 | dotx |
Site Programming Review Development Discussion Guide |
Part 2 Design Criteria
Division 01 - General Requirements | |
---|---|
Division 02 - Existing Conditions | |
Division 03 - Concrete | |
Division 04 - Masonry | |
Division 05 - Metals | |
Division 06 - Wood Plastics and Composites | |
Division 07 - Thermal and Moisture Protection | |
Division 08 - Openings | |
Division 09 - Finishes | |
Division 10 - Specialties | |
Division 11 - Equipment | |
Division 12 - Furnishings | |
Division 13 - Special Construction | |
Division 14 - Conveying Equipment | |
Division 21 - Fire Suppression | |
Division 22 - Plumbing | |
Division 23 - Heating Ventilating and Air Conditioning | |
Division 25 - Building Automation | |
Division 26 - Electrical (2025.0203.1) | |
Division 28 - Electronic Safety and Security | |
Division 31 - Earthwork | |
Division 32 - Exterior Improvements | |
Division 33 - Utilities |
Part 2 Support Documents
00 Facilities Design Manual-Detail Links | |
---|---|
Div 01 Guidelines For The Use Of Permanent Systems For Temporary Heat | |
Div 01 Owner Furnished Equipment | |
Div 01 Site Fencing Standards | |
Div 10 Interior Signage Standards | |
Div 21-23 General Machinery Vibration Severity Chart | |
Div 21-23 ISU Steam PRV Selection Table And Specifications | |
Div 21-23 ISU Steam PRV Selection Table And Specifications With Monitor | |
Div 23 Building Systems Nomenclature Dictionary | doc |
Div 25 253000 - Building Automation and Instrumentation (with Programming) v2022.01 | docx |
Part 2 Support Documents - Drawings
DIV05 Steel Ladder Details | dwgpdf |
---|---|
DIV10 Adjustable Shelving Detail | dwgpdf |
DIV12 Hook Strip Details | dwgpdf |
DIV22 Backflow Preventer Detail | dwgpdf |
DIV23 Ceiling Fan Coil Piping | dwgpdf |
DIV23 Cooling Coil Drying Connections | dwgpdf |
DIV23 Lab Gas Shutoff Detail And Schematic | dwgpdf |
DIV23 Mechanical Curb Details | dwgpdf |
DIV23 Multiple Cooling Coil Piping | dwgpdf |
DIV23 PRV Station | dwg |
DIV23 Pump Detail | dwgpdf |
DIV23 Reheat Coil Piping | dwgpdf |
DIV23 Rooftop Centrifugal Exhaust Fan | dwgpdf |
DIV23 Single Cooling Coil Piping | dwgpdf |
DIV23 Steam Coil Piping | dwgpdf |
DIV23 Steam Drip Piping | dwgpdf |
DIV23 Steam PRV Station With Monitor Valve | |
DIV26 Lab Gas Shutoff Detail And Schematic | dwgpdf |
DIV26 Uninterruptable Circuit Wiring Detail | dwgpdf |
DIV28 Elev damper sw plate layout 2 | dwg |
DIV28 Elev damper sw plate layout | |
DIV28 Elevator Shaft Vent Control Details | dwgpdf |
DIV32 CR Curb Ramps Flared Sides 2021.08 | dwg |
DIV32 CR-1 Flared Sides-Paving 2021.08 | |
DIV32 CR-2 Flared Sides-Turf and Paving 2021.08 | |
DIV32 CR-3 Flared Sides-Turf 2021.08 | |
DIV32 CR-4 Flared Sides-Radius 2021.08 | |
DIV32 ISU Bike Details | dwgpdf |
DIV32 LA-1 Curb Details | dwgpdf |
DIV32 LA-2 Lodal Trash Containers | dwgpdf |
DIV32 LA-4 Root Protection In Filled Areas | dwgpdf |
DIV32 LA-5 Root Protection In Cut Areas | dwgpdf |
DIV32 LA-6 Tree Protection Detail | dwgpdf |
DIV33 Elec 50 Ft Pole Lights | dwgpdf |
DIV33 Elec Emer Phone Kiosk | dwgpdf |
DIV33 Elec EU-3 PMH 10 SWGR Foundation | dwgpdf |
DIV33 Elec EU-3 PMH 11 SWGR Foundation | dwgpdf |
DIV33 Elec EU-3 PMH 12 SWGR Foundation | dwgpdf |
DIV33 Elec EU-3 PMH 13 SWGR Foundation | dwgpdf |
DIV33 Elec EU-3 PMH 19 SWGR Foundation | dwgpdf |
DIV33 Elec EU-3 PMH 5 SWGR Foundation | dwgpdf |
DIV33 Elec EU-3 PMH 6 SWGR Foundation | dwgpdf |
DIV33 Elec EU-3 PMH 7 SWGR Foundation | dwgpdf |
DIV33 Elec EU-3 PMH 9 SWGR Foundation | dwgpdf |
DIV33 Elec EU-Padmounted XFMR Foundation | dwgpdf |
DIV33 Elec EU-Vista SWGR Foundation | dwgpdf |
DIV33 Elec Ground Boxes | dwgpdf |
DIV33 Elec KWH-1 KWHR Meter New Construction | dwgpdf |
DIV33 Elec KWH-2 KWHR Meter Existing Switchboards | dwgpdf |
DIV33 Elec KWH-3 KWHR Meter Transformer | dwgpdf |
DIV33 Elec KWH-4 SWGR | dwgpdf |
DIV33 Elec Parking Lot 25' Lights with Pre-cast Foundation | dwgpdf |
DIV33 Elec Parking Lot 30' Lights with Pre-cast Foundation | dwgpdf |
DIV33 Elec Parking Lot 30' Modified Pre-Cast Foundation | dwgpdf |
DIV33 Elec Parking Lot 30' Valmont Pole Lighting | dwgpdf |
DIV33 Elec Parking Lot Lights Labeling Instructions | dwgpdf |
DIV33 Elec Quazite Box Hole Cutting Installation details | |
DIV33 Elec Quazite Box Installation details | |
DIV33 Elec Roadway Lights Pre-Cast - Banner Rated | |
DIV33 Elec Roadway Lights Pre-Cast-Model-000 | |
DIV33 Elec Roadway Lights With Camera Pre-Cast-Model-000 | |
DIV33 Elec Standard Cast in Place Electric Vault | dwgpdf |
DIV33 Elec Standard Method of Install-Default-000 | |
DIV33 Elec SWM-1 480V MAIN SWBD MASTER METER CONNECT TO BACNET BAS | dwgpdf |
DIV33 Elec SWM-2 480V MAIN SWBD MASTER METER CONNECT TO N2 BUS BAS | dwgpdf |
DIV33 Elec SWM-3 208V MAIN SWBD MASTER METER CONNECT TO BACNET BAS | dwgpdf |
DIV33 Elec SWM-4 208V MAIN SWBD MASTER METER CONNECT TO N2 BUS BAS | dwgpdf |
DIV33 Elec Transformer Terminal Pad Connections | dwgpdf |
DIV33 Elec VMC-1 MAIN SWBD VERIS METER CONNECT TO BACNET BAS | |
DIV33 Elec VMC-2 MAIN SWBD VERIS METER CONNECT TO N2 BUS BAS | |
DIV33 Elec VMC-3 LEED VERIS METER CONNECT TO BACNET BAS | |
DIV33 Elec VMC-4 LEED VERIS METER CONNECT TO N2 BUS BAS1 | |
DIV33 Elec Walk Lights Pre-Cast - Alternate Foundation | |
DIV33 Elec Walk Lights Pre-Cast | dwgpdf |
DIV33 Mech Chilled Water Details | dwgpdf |
DIV33 Mech Domestic Water Details | dwgpdf |
DIV33 Mech Gas Details | dwgpdf |
DIV33 Mech General Details | dwgpdf |
DIV33 Sewer Details | dwgpdf |
DIV33 Steam Details | dwgpdf |